Upravit

Sdílet prostřednictvím


Task Interface

Definition

public interface class Task
[System.Runtime.InteropServices.Guid("000C0C3F-0000-0000-C000-000000000046")]
public interface Task
type Task = interface
Public Interface Task
Attributes

Properties

Active
ActualCost
ActualDuration
ActualFinish
ActualOvertimeCost
ActualOvertimeWork
ActualOvertimeWorkProtected
ActualStart
ActualWork
ActualWorkProtected
ACWP
Application
Assignments
Baseline10BudgetCost
Baseline10BudgetWork
Baseline10Cost
Baseline10DeliverableFinish
Baseline10DeliverableStart
Baseline10Duration
Baseline10DurationEstimated
Baseline10DurationText
Baseline10Finish
Baseline10FinishText
Baseline10FixedCost
Baseline10FixedCostAccrual
Baseline10Start
Baseline10StartText
Baseline10Work
Baseline1BudgetCost
Baseline1BudgetWork
Baseline1Cost
Baseline1DeliverableFinish
Baseline1DeliverableStart
Baseline1Duration
Baseline1DurationEstimated
Baseline1DurationText
Baseline1Finish
Baseline1FinishText
Baseline1FixedCost
Baseline1FixedCostAccrual
Baseline1Start
Baseline1StartText
Baseline1Work
Baseline2BudgetCost
Baseline2BudgetWork
Baseline2Cost
Baseline2DeliverableFinish
Baseline2DeliverableStart
Baseline2Duration
Baseline2DurationEstimated
Baseline2DurationText
Baseline2Finish
Baseline2FinishText
Baseline2FixedCost
Baseline2FixedCostAccrual
Baseline2Start
Baseline2StartText
Baseline2Work
Baseline3BudgetCost
Baseline3BudgetWork
Baseline3Cost
Baseline3DeliverableFinish
Baseline3DeliverableStart
Baseline3Duration
Baseline3DurationEstimated
Baseline3DurationText
Baseline3Finish
Baseline3FinishText
Baseline3FixedCost
Baseline3FixedCostAccrual
Baseline3Start
Baseline3StartText
Baseline3Work
Baseline4BudgetCost
Baseline4BudgetWork
Baseline4Cost
Baseline4DeliverableFinish
Baseline4DeliverableStart
Baseline4Duration
Baseline4DurationEstimated
Baseline4DurationText
Baseline4Finish
Baseline4FinishText
Baseline4FixedCost
Baseline4FixedCostAccrual
Baseline4Start
Baseline4StartText
Baseline4Work
Baseline5BudgetCost
Baseline5BudgetWork
Baseline5Cost
Baseline5DeliverableFinish
Baseline5DeliverableStart
Baseline5Duration
Baseline5DurationEstimated
Baseline5DurationText
Baseline5Finish
Baseline5FinishText
Baseline5FixedCost
Baseline5FixedCostAccrual
Baseline5Start
Baseline5StartText
Baseline5Work
Baseline6BudgetCost
Baseline6BudgetWork
Baseline6Cost
Baseline6DeliverableFinish
Baseline6DeliverableStart
Baseline6Duration
Baseline6DurationEstimated
Baseline6DurationText
Baseline6Finish
Baseline6FinishText
Baseline6FixedCost
Baseline6FixedCostAccrual
Baseline6Start
Baseline6StartText
Baseline6Work
Baseline7BudgetCost
Baseline7BudgetWork
Baseline7Cost
Baseline7DeliverableFinish
Baseline7DeliverableStart
Baseline7Duration
Baseline7DurationEstimated
Baseline7DurationText
Baseline7Finish
Baseline7FinishText
Baseline7FixedCost
Baseline7FixedCostAccrual
Baseline7Start
Baseline7StartText
Baseline7Work
Baseline8BudgetCost
Baseline8BudgetWork
Baseline8Cost
Baseline8DeliverableFinish
Baseline8DeliverableStart
Baseline8Duration
Baseline8DurationEstimated
Baseline8DurationText
Baseline8Finish
Baseline8FinishText
Baseline8FixedCost
Baseline8FixedCostAccrual
Baseline8Start
Baseline8StartText
Baseline8Work
Baseline9BudgetCost
Baseline9BudgetWork
Baseline9Cost
Baseline9DeliverableFinish
Baseline9DeliverableStart
Baseline9Duration
Baseline9DurationEstimated
Baseline9DurationText
Baseline9Finish
Baseline9FinishText
Baseline9FixedCost
Baseline9FixedCostAccrual
Baseline9Start
Baseline9StartText
Baseline9Work
BaselineBudgetCost
BaselineBudgetWork
BaselineCost
BaselineDeliverableFinish
BaselineDeliverableStart
BaselineDuration
BaselineDurationEstimated
BaselineDurationText
BaselineFinish
BaselineFinishText
BaselineFixedCost
BaselineFixedCostAccrual
BaselineStart
BaselineStartText
BaselineWork
BCWP
BCWS
BudgetCost
BudgetWork
Calendar
CalendarGuid
CalendarObject
Confirmed
ConstraintDate
ConstraintType
Contact
Cost
Cost1
Cost10
Cost2
Cost3
Cost4
Cost5
Cost6
Cost7
Cost8
Cost9
CostVariance
CPI
Created
Critical
CV
CVPercent
Date1
Date10
Date2
Date3
Date4
Date5
Date6
Date7
Date8
Date9
Deadline
DeliverableFinish
DeliverableGuid
DeliverableName
DeliverableStart
DeliverableType
Duration
Duration1
Duration10
Duration10Estimated
Duration1Estimated
Duration2
Duration2Estimated
Duration3
Duration3Estimated
Duration4
Duration4Estimated
Duration5
Duration5Estimated
Duration6
Duration6Estimated
Duration7
Duration7Estimated
Duration8
Duration8Estimated
Duration9
Duration9Estimated
DurationText
DurationVariance
EAC
EarlyFinish
EarlyStart
EarnedValueMethod
EffortDriven
EnterpriseCost1
EnterpriseCost10
EnterpriseCost2
EnterpriseCost3
EnterpriseCost4
EnterpriseCost5
EnterpriseCost6
EnterpriseCost7
EnterpriseCost8
EnterpriseCost9
EnterpriseDate1
EnterpriseDate10
EnterpriseDate11
EnterpriseDate12
EnterpriseDate13
EnterpriseDate14
EnterpriseDate15
EnterpriseDate16
EnterpriseDate17
EnterpriseDate18
EnterpriseDate19
EnterpriseDate2
EnterpriseDate20
EnterpriseDate21
EnterpriseDate22
EnterpriseDate23
EnterpriseDate24
EnterpriseDate25
EnterpriseDate26
EnterpriseDate27
EnterpriseDate28
EnterpriseDate29
EnterpriseDate3
EnterpriseDate30
EnterpriseDate4
EnterpriseDate5
EnterpriseDate6
EnterpriseDate7
EnterpriseDate8
EnterpriseDate9
EnterpriseDuration1
EnterpriseDuration10
EnterpriseDuration2
EnterpriseDuration3
EnterpriseDuration4
EnterpriseDuration5
EnterpriseDuration6
EnterpriseDuration7
EnterpriseDuration8
EnterpriseDuration9
EnterpriseFlag1
EnterpriseFlag10
EnterpriseFlag11
EnterpriseFlag12
EnterpriseFlag13
EnterpriseFlag14
EnterpriseFlag15
EnterpriseFlag16
EnterpriseFlag17
EnterpriseFlag18
EnterpriseFlag19
EnterpriseFlag2
EnterpriseFlag20
EnterpriseFlag3
EnterpriseFlag4
EnterpriseFlag5
EnterpriseFlag6
EnterpriseFlag7
EnterpriseFlag8
EnterpriseFlag9
EnterpriseNumber1
EnterpriseNumber10
EnterpriseNumber11
EnterpriseNumber12
EnterpriseNumber13
EnterpriseNumber14
EnterpriseNumber15
EnterpriseNumber16
EnterpriseNumber17
EnterpriseNumber18
EnterpriseNumber19
EnterpriseNumber2
EnterpriseNumber20
EnterpriseNumber21
EnterpriseNumber22
EnterpriseNumber23
EnterpriseNumber24
EnterpriseNumber25
EnterpriseNumber26
EnterpriseNumber27
EnterpriseNumber28
EnterpriseNumber29
EnterpriseNumber3
EnterpriseNumber30
EnterpriseNumber31
EnterpriseNumber32
EnterpriseNumber33
EnterpriseNumber34
EnterpriseNumber35
EnterpriseNumber36
EnterpriseNumber37
EnterpriseNumber38
EnterpriseNumber39
EnterpriseNumber4
EnterpriseNumber40
EnterpriseNumber5
EnterpriseNumber6
EnterpriseNumber7
EnterpriseNumber8
EnterpriseNumber9
EnterpriseOutlineCode1
EnterpriseOutlineCode10
EnterpriseOutlineCode11
EnterpriseOutlineCode12
EnterpriseOutlineCode13
EnterpriseOutlineCode14
EnterpriseOutlineCode15
EnterpriseOutlineCode16
EnterpriseOutlineCode17
EnterpriseOutlineCode18
EnterpriseOutlineCode19
EnterpriseOutlineCode2
EnterpriseOutlineCode20
EnterpriseOutlineCode21
EnterpriseOutlineCode22
EnterpriseOutlineCode23
EnterpriseOutlineCode24
EnterpriseOutlineCode25
EnterpriseOutlineCode26
EnterpriseOutlineCode27
EnterpriseOutlineCode28
EnterpriseOutlineCode29
EnterpriseOutlineCode3
EnterpriseOutlineCode30
EnterpriseOutlineCode4
EnterpriseOutlineCode5
EnterpriseOutlineCode6
EnterpriseOutlineCode7
EnterpriseOutlineCode8
EnterpriseOutlineCode9
EnterpriseProjectCost1
EnterpriseProjectCost10
EnterpriseProjectCost2
EnterpriseProjectCost3
EnterpriseProjectCost4
EnterpriseProjectCost5
EnterpriseProjectCost6
EnterpriseProjectCost7
EnterpriseProjectCost8
EnterpriseProjectCost9
EnterpriseProjectDate1
EnterpriseProjectDate10
EnterpriseProjectDate11
EnterpriseProjectDate12
EnterpriseProjectDate13
EnterpriseProjectDate14
EnterpriseProjectDate15
EnterpriseProjectDate16
EnterpriseProjectDate17
EnterpriseProjectDate18
EnterpriseProjectDate19
EnterpriseProjectDate2
EnterpriseProjectDate20
EnterpriseProjectDate21
EnterpriseProjectDate22
EnterpriseProjectDate23
EnterpriseProjectDate24
EnterpriseProjectDate25
EnterpriseProjectDate26
EnterpriseProjectDate27
EnterpriseProjectDate28
EnterpriseProjectDate29
EnterpriseProjectDate3
EnterpriseProjectDate30
EnterpriseProjectDate4
EnterpriseProjectDate5
EnterpriseProjectDate6
EnterpriseProjectDate7
EnterpriseProjectDate8
EnterpriseProjectDate9
EnterpriseProjectDuration1
EnterpriseProjectDuration10
EnterpriseProjectDuration2
EnterpriseProjectDuration3
EnterpriseProjectDuration4
EnterpriseProjectDuration5
EnterpriseProjectDuration6
EnterpriseProjectDuration7
EnterpriseProjectDuration8
EnterpriseProjectDuration9
EnterpriseProjectFlag1
EnterpriseProjectFlag10
EnterpriseProjectFlag11
EnterpriseProjectFlag12
EnterpriseProjectFlag13
EnterpriseProjectFlag14
EnterpriseProjectFlag15
EnterpriseProjectFlag16
EnterpriseProjectFlag17
EnterpriseProjectFlag18
EnterpriseProjectFlag19
EnterpriseProjectFlag2
EnterpriseProjectFlag20
EnterpriseProjectFlag3
EnterpriseProjectFlag4
EnterpriseProjectFlag5
EnterpriseProjectFlag6
EnterpriseProjectFlag7
EnterpriseProjectFlag8
EnterpriseProjectFlag9
EnterpriseProjectNumber1
EnterpriseProjectNumber10
EnterpriseProjectNumber11
EnterpriseProjectNumber12
EnterpriseProjectNumber13
EnterpriseProjectNumber14
EnterpriseProjectNumber15
EnterpriseProjectNumber16
EnterpriseProjectNumber17
EnterpriseProjectNumber18
EnterpriseProjectNumber19
EnterpriseProjectNumber2
EnterpriseProjectNumber20
EnterpriseProjectNumber21
EnterpriseProjectNumber22
EnterpriseProjectNumber23
EnterpriseProjectNumber24
EnterpriseProjectNumber25
EnterpriseProjectNumber26
EnterpriseProjectNumber27
EnterpriseProjectNumber28
EnterpriseProjectNumber29
EnterpriseProjectNumber3
EnterpriseProjectNumber30
EnterpriseProjectNumber31
EnterpriseProjectNumber32
EnterpriseProjectNumber33
EnterpriseProjectNumber34
EnterpriseProjectNumber35
EnterpriseProjectNumber36
EnterpriseProjectNumber37
EnterpriseProjectNumber38
EnterpriseProjectNumber39
EnterpriseProjectNumber4
EnterpriseProjectNumber40
EnterpriseProjectNumber5
EnterpriseProjectNumber6
EnterpriseProjectNumber7
EnterpriseProjectNumber8
EnterpriseProjectNumber9
EnterpriseProjectOutlineCode1
EnterpriseProjectOutlineCode10
EnterpriseProjectOutlineCode11
EnterpriseProjectOutlineCode12
EnterpriseProjectOutlineCode13
EnterpriseProjectOutlineCode14
EnterpriseProjectOutlineCode15
EnterpriseProjectOutlineCode16
EnterpriseProjectOutlineCode17
EnterpriseProjectOutlineCode18
EnterpriseProjectOutlineCode19
EnterpriseProjectOutlineCode2
EnterpriseProjectOutlineCode20
EnterpriseProjectOutlineCode21
EnterpriseProjectOutlineCode22
EnterpriseProjectOutlineCode23
EnterpriseProjectOutlineCode24
EnterpriseProjectOutlineCode25
EnterpriseProjectOutlineCode26
EnterpriseProjectOutlineCode27
EnterpriseProjectOutlineCode28
EnterpriseProjectOutlineCode29
EnterpriseProjectOutlineCode3
EnterpriseProjectOutlineCode30
EnterpriseProjectOutlineCode4
EnterpriseProjectOutlineCode5
EnterpriseProjectOutlineCode6
EnterpriseProjectOutlineCode7
EnterpriseProjectOutlineCode8
EnterpriseProjectOutlineCode9
EnterpriseProjectText1
EnterpriseProjectText10
EnterpriseProjectText11
EnterpriseProjectText12
EnterpriseProjectText13
EnterpriseProjectText14
EnterpriseProjectText15
EnterpriseProjectText16
EnterpriseProjectText17
EnterpriseProjectText18
EnterpriseProjectText19
EnterpriseProjectText2
EnterpriseProjectText20
EnterpriseProjectText21
EnterpriseProjectText22
EnterpriseProjectText23
EnterpriseProjectText24
EnterpriseProjectText25
EnterpriseProjectText26
EnterpriseProjectText27
EnterpriseProjectText28
EnterpriseProjectText29
EnterpriseProjectText3
EnterpriseProjectText30
EnterpriseProjectText31
EnterpriseProjectText32
EnterpriseProjectText33
EnterpriseProjectText34
EnterpriseProjectText35
EnterpriseProjectText36
EnterpriseProjectText37
EnterpriseProjectText38
EnterpriseProjectText39
EnterpriseProjectText4
EnterpriseProjectText40
EnterpriseProjectText5
EnterpriseProjectText6
EnterpriseProjectText7
EnterpriseProjectText8
EnterpriseProjectText9
EnterpriseText1
EnterpriseText10
EnterpriseText11
EnterpriseText12
EnterpriseText13
EnterpriseText14
EnterpriseText15
EnterpriseText16
EnterpriseText17
EnterpriseText18
EnterpriseText19
EnterpriseText2
EnterpriseText20
EnterpriseText21
EnterpriseText22
EnterpriseText23
EnterpriseText24
EnterpriseText25
EnterpriseText26
EnterpriseText27
EnterpriseText28
EnterpriseText29
EnterpriseText3
EnterpriseText30
EnterpriseText31
EnterpriseText32
EnterpriseText33
EnterpriseText34
EnterpriseText35
EnterpriseText36
EnterpriseText37
EnterpriseText38
EnterpriseText39
EnterpriseText4
EnterpriseText40
EnterpriseText5
EnterpriseText6
EnterpriseText7
EnterpriseText8
EnterpriseText9
ErrorMessage
Estimated
ExternalTask
Finish
Finish1
Finish10
Finish2
Finish3
Finish4
Finish5
Finish6
Finish7
Finish8
Finish9
FinishSlack
FinishText
FinishVariance
FixedCost
FixedCostAccrual
FixedDuration
Flag1
Flag10
Flag11
Flag12
Flag13
Flag14
Flag15
Flag16
Flag17
Flag18
Flag19
Flag2
Flag20
Flag3
Flag4
Flag5
Flag6
Flag7
Flag8
Flag9
FreeSlack
GroupBySummary
Guid
HideBar
Hyperlink
HyperlinkAddress
HyperlinkHREF
HyperlinkScreenTip
HyperlinkSubAddress
ID
IgnoreResourceCalendar
IgnoreWarnings
Index
IsDurationValid
IsFinishValid
IsPublished
IsStartValid
LateFinish
LateStart
LevelIndividualAssignments
LevelingCanSplit
LevelingDelay
LinkedFields
Manual
Marked
Milestone
Name
Notes
Number1
Number10
Number11
Number12
Number13
Number14
Number15
Number16
Number17
Number18
Number19
Number2
Number20
Number3
Number4
Number5
Number6
Number7
Number8
Number9
Objects
OutlineChildren
OutlineCode1
OutlineCode10
OutlineCode2
OutlineCode3
OutlineCode4
OutlineCode5
OutlineCode6
OutlineCode7
OutlineCode8
OutlineCode9
OutlineLevel
OutlineNumber
OutlineParent
Overallocated
OvertimeCost
OvertimeWork
Parent
PathDrivenSuccessor
PathDrivingPredecessor
PathPredecessor
PathSuccessor
PercentComplete
PercentWorkComplete
PhysicalPercentComplete
Placeholder
Predecessors
PredecessorTasks
PreleveledFinish
PreleveledStart
Priority
Project
RecalcFlags
Recurring
RegularWork
RemainingCost
RemainingDuration
RemainingOvertimeCost
RemainingOvertimeWork
RemainingWork
ResourceGroup
ResourceInitials
ResourceNames
ResourcePhonetics
Resources
ResponsePending
Resume
ResumeNoEarlierThan
Rollup
ScheduledDuration
ScheduledFinish
ScheduledStart
SPI
SplitParts
Start
Start1
Start10
Start2
Start3
Start4
Start5
Start6
Start7
Start8
Start9
StartDriver
StartSlack
StartText
StartVariance
Status
StatusManagerName
Stop
Subproject
SubProjectReadOnly
Successors
SuccessorTasks
Summary
SV
SVPercent
TaskDependencies
TCPI
TeamStatusPending
Text1
Text10
Text11
Text12
Text13
Text14
Text15
Text16
Text17
Text18
Text19
Text2
Text20
Text21
Text22
Text23
Text24
Text25
Text26
Text27
Text28
Text29
Text3
Text30
Text4
Text5
Text6
Text7
Text8
Text9
TotalSlack
Type
UniqueID
UniqueIDPredecessors
UniqueIDSuccessors
UpdateNeeded
VAC
Warning
WBS
WBSPredecessors
WBSSuccessors
Work
WorkVariance

Methods

AppendNotes(String)
Delete()
GetField(PjField)
LinkPredecessors(Object, PjTaskLinkType, Object)
LinkSuccessors(Object, PjTaskLinkType, Object)
OutlineHideSubTasks()
OutlineIndent()
OutlineOutdent()
OutlineShowAllTasks()
OutlineShowSubTasks()
SetField(PjField, String)
Split(Object, Object)
TimeScaleData(Object, Object, PjTaskTimescaledData, PjTimescaleUnit, Int32)
UnlinkPredecessors(Object)
UnlinkSuccessors(Object)

Applies to