question

BargaviNagarajan-0382 avatar image
0 Votes"
BargaviNagarajan-0382 asked BargaviNagarajan-0382 commented

Exchange 2019 - Disaster Recovery

Hello,

As an Exchange Administrator, I need to prepare the Exchange 2019 Disaster recovery plan. My environment is Exchange 2019 CU7 across 2 sites. Is there any documentation or step by step procedure.

Thank you.

office-exchange-server-ha
· 1
5 |1600 characters needed characters left characters exceeded

Up to 10 attachments (including images) can be used with a maximum of 3.0 MiB each and 30.0 MiB total.

AshokM-8240 avatar image
1 Vote"
AshokM-8240 answered

Hi,

Could you please be specific on your requirement? As per my understanding, if you have Exchange servers in 2 sites in a single DAG then you can perform datacenter switchover/failovers. Disaster recovery for the Exchange servers can be achieved using DAG. Kindly correct me If I misunderstood the requirement.

https://docs.microsoft.com/en-us/exchange/high-availability/manage-ha/switchovers-and-failovers?view=exchserver-2019
https://docs.microsoft.com/en-us/exchange/high-availability/disaster-recovery/disaster-recovery?view=exchserver-2019
http://cloudexchangers.com/exchange-2019-disaster-recovery-part-1/

If the above suggestion helps, please click on "Accept Answer" and upvote it.

5 |1600 characters needed characters left characters exceeded

Up to 10 attachments (including images) can be used with a maximum of 3.0 MiB each and 30.0 MiB total.

KaelYao-MSFT avatar image
1 Vote"
KaelYao-MSFT answered

Hi, @BargaviNagarajan-0382

As Ashok mentioned, you may consider deploying a database availability group (DAG) for high availability and site resilience.

To deploy a DAG, you need to deploy one or more Exchange servers in both sites.
If the DAG is with an even number of members, a witness server is also required.

After the DAG is created, you will be able to add database copies on members of the DAG.
If the server which currently holds the active database copy goes down, a failover will be triggered.
The database copy on another DAG member will be activated and the clients will be redirected to this server.

Here are two more links which may be helpful.
All the requirements of deploying a DAG: Plan for high availability and site resilience
Overall steps of deploying a DAG: Deploying high availability and site resilience


If the response is helpful, please click "Accept Answer" and upvote it.
Note: Please follow the steps in our documentation to enable e-mail notifications if you want to receive the related email notification for this thread.

5 |1600 characters needed characters left characters exceeded