About line types

Important

This content is archived and is not being updated. For the latest documentation, see Microsoft Dynamics 365 product documentation. For the latest release plans, see Dynamics 365 and Microsoft Power Platform release plans.

Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012

When you create a BOM line, you use the BOM line type to indicate how you want the system to handle the line when you estimate the production order. Each line type gives a different result. The Line type field is located on the General tab of the BOM line form. You can select from the following BOM line types.

Item

Select Item when the item is a raw material or semi-finished item that is picked from inventory, or when the item is a service.

Phantom

Select Phantom when you want to explode any lower-level BOM items that are contained on the BOM line. When you estimate the production order, and the BOM items are exploded, the component items are listed as BOM lines in the production order, and the corresponding routes are added to the production route.

BOM items are exploded by using the current configuration. When you use the Phantom line type, you can handle production and measurement configurations that occur at different BOM levels.

Pegged supply

Select Pegged supply when you want to create a subproduction for any BOM items that are contained on the BOM line. The subproduction is created when you estimate the production order. The required item quantities are automatically reserved for the production.

Vendor

Select Vendor if the production process uses a subcontractor, and you want to create a subproduction or a purchase order for the subcontractor automatically.

Note

The service or work that is performed by the subcontractor must be created as a BOM or Service item in the Released product details form. You can attach it to the parent item as a BOM line.

The route must contain an operation that is assigned to the subcontractor's operations resource.

See also

BOM versions and lines (form)

Run an estimation