Configure a parallel activity
Important
This content is archived and is not being updated. For the latest documentation, see Microsoft Dynamics 365 product documentation. For the latest release plans, see Dynamics 365 and Microsoft Power Platform release plans.
Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012
To configure a parallel activity, complete the following procedures in the workflow editor.
Name the parallel activity
Follow these steps to enter a name for the parallel activity.
Right-click the parallel activity and then click Properties to open the Properties form.
In the left pane, click Basic Settings.
In the Name field, enter a unique name for the parallel activity.
Click Close.
Configure the branches of the parallel activity
A parallel activity consists of workflow branches that run at the same time. Follow these steps to add and configure the branches of this parallel activity.
Double-click the parallel activity to display the branches of the parallel activity.
To add a branch, drag the Branch element from the Workflow elements area to an insertion point on the canvas. The following figure shows an insertion point.
Note
The order of the branches is not important because all the branches of a parallel activity run at the same time.
To configure each branch, see Configure a parallel branch.