Share via


ShapeRange.IncrementRotation(Single) Methode

Definition

public:
 void IncrementRotation(float Increment);
public void IncrementRotation (float Increment);
abstract member IncrementRotation : single -> unit
Public Sub IncrementRotation (Increment As Single)

Parameter

Increment
Single

Gilt für: