CostVariance Element
This content is outdated and is no longer being maintained. It is provided as a courtesy for individuals who are still using these technologies. This page may contain URLs that were valid when originally published, but now link to sites or pages that no longer exist.
The difference between the baseline cost and total cost for a resource or assignment.
<CostVariance>
FloatValue
</CostVariance>
Parent Elements
Occurrences
Minimum: 0 Maximum: 1 |
See Also
Concepts
Resource Elements and XML Structure
XML Schema for the Resources Element