sys.pdw_loader_backup_run_details (Transact-SQL)
Applies to: Azure Synapse Analytics Analytics Platform System (PDW)
Contains further detailed information, beyond the information in sys.pdw_loader_backup_runs (Transact-SQL), about ongoing and completed backup and restore operations in Azure Synapse Analytics and about ongoing and completed backup, restore, and load operations in Analytics Platform System (PDW). The information persists across system restarts.
Column Name | Data Type | Description | Range |
---|---|---|---|
run_id | int | Unique identifier for a specific backup or restore run. run_id and pdw_node_id form the key for this view. |
|
pdw_node_id | int | Unique identifier of an appliance node for which this record holds details. run_id and pdw_node_id form the key for this view. |
See node_id in sys.dm_pdw_nodes (Transact-SQL). |
status | nvarchar(16) | The current status of the run. | 'CANCELLED', 'COMPLETED', 'FAILED', 'QUEUED', 'RUNNING' |
start_time | datetime | Time at which the operation started on this particular node. | |
end_time | datetime | Time at which the operation ended on this particular node, if any. | |
total_elapsed_time | int | Total time the operation has been running on this particular node. | If total_elapsed_time exceeds the maximum value for an integer (24.8 days in milliseconds), it will cause materialization failure due to overflow. The maximum value in milliseconds is equivalent to 24.8 days. |
progress | int | Progress of the operation expressed as a percentage. | 0 to 100 |
See Also
Azure Synapse Analytics and Parallel Data Warehouse Catalog Views