Tutorial: Rack the Azure Stack Edge Pro 2 using a two-post mount

Azure Stack Edge Pro 2 is the next generation of an AI-enabled edge computing device that can transfer data over the network. This device is a part of the Hardware-as-a-service solution offered by Microsoft.

The device must be installed on a standard 19-inch rack. Use the following procedure to rack mount your device on a standard 19-inch rack using a two-post mount.

Prerequisites

  • Before you begin, read the safety instructions in your Safety, Environmental, and Regulatory Information booklet. This booklet was shipped with the device.
  • Begin installing the rails in the allotted space that is closest to the bottom of the rack enclosure.
  • For the rack mounting configuration, you need to supply:
    • A Phillips-head screwdriver

Identify the rail kit contents

  • Inner rail

  • Chassis

  • The following screws and nuts:

    Rack Type Screws Nuts
    Square hole Image of square hole screw. M6X13 (8) Image of square hole nut. M6 (8)
    Round hole Image of round hole screw. M5X13 (8) Image of round hole nut. M5 (8)

Install and remove rails

  1. Remove the inner rail. Pull the tab forward and take out the inner rail.

    Remove inner rail.

  2. Install the inner rail onto the chassis. Make sure to fasten the inner rail screw.

    Install inner rail onto chassis.

  3. Identify Bracket B: Diagram of Bracket B.

    Adjust the fastening position of Bracket B. Release the retainer by pulling and moving the retainer hook.

    Adjust Bracket B fastening position.

  4. Moving the retainer, loosen the screw by the oval holes on the retainer (no need to detach the screw). When fastening the rear bracket, use the oval hole on the retainer. Don't use other holes on the retainer. Loosen screws by the oval holes.

  5. Move Bracket B to the needed position and fasten the screw. Move Bracket B.

  6. Move and hook the retainer back to the front.

    Instructions for front and rear brackets.

  7. Insert the chassis to complete the installation.

    1. Ensure the ball bearing retainer is located at the front of the middle rail (reference diagram 1 and 2).
    2. Insert the chassis into the middle-outer rails (reference diagram 3).
    3. When you hit a stop, pull/push the blue release tab on the inner rails (reference diagram 4).
    4. Tighten the M5 screws of the chassis to the rail once the server is seated (reference diagram 5). Insert chassis.

Remove the chassis

  1. Loosen the M5 screws of the chassis.
  2. Pull out the chassis.
  3. Press the disconnect tab forward to remove the chassis. Remove chassis instructions.