@Chris Buley Thanks for the question. Those are default values for the Probability Threshold slider on the left pane of the Performance tab. This is the level of confidence that a prediction needs to have in order to be considered correct (for the purposes of calculating precision and recall).
We are able to retain at 90% after leaving and coming back to the project as shown below.