Dear Support,
We plan to migrate our current SCCM architecture to a physical server. Seeking your professional advice on how to perform this migration successfully and with fewer challenges?
Our is small site with only one DP (i.e., around 250 users + 19 different location (VPN sites)). Initially, there were several issues with the new SCCM configuration.. After 3 months efforts, everything appears to be normal and functioning properly.
The current SCCM infrastructure is on Dell Optiplex 3090 (workstation PC as a server) - includes server 2019 + SCCM + SQL + WSUS + Reporting server). Our company wants to upgrade the SCCM infrastructure to a real physical server because we are now utilising SCCM on non-server machines.
What do you think if we use the following approach?,
- Clone the whole image from a Dell PC (Server OS, SCCM, SQL, WSUS, Reporting Service, and other dependencies).
- Create a new server operating system using the same resources (i.e., C, D and E drives with same disk space).
- Mirror the clone image into the new build server (Using the same server name, IP address, and DNS settings)
- Turn OFF the existing server and TURN ON the new server.
or Any alternative suggestion please?