- To make sure everything is up to date, please merge all your latest changes into the ‘main’ repository.
- Disconnect the workspace from git integration
- Delete the report or dataset that is causing the sync error.
- Reconnect the workspace to the git repository, and to the ‘main’ branch. So, the latest changes can be synced with the workspace.
Error while trying to sync changes to Power BI workspace
I'm trying to sync my latest changes to my staging workspace through git integration in Power BI. Tested my changes in a development workspace and the changes synced fine without any error. While I was trying to sync the same changes in Staging workspace. It throwed the following error:
Workload Error Code Dataset_Import_FailedToImportDataset
Workload Error Message Dataset Workload failed to import the dataset with dataset id
Tried syncing the same code change in a local workspace as well. It synced without throwing any error. Getting the above error only in this particular workspace. How can I resolve this issue?
Microsoft Security Microsoft Graph
-
Mohasin Banu Chiragthehli Mohammed Abdul 75 Reputation points
2024-05-24T20:37:28.76+00:00