Thanks. The problem solved!
MS Task Planner integrate with Powerapps
Hi,
After using the PowerApps inspection template which help me integrate with MS Task Planner, my task due date always remain as today. I try to replace the today() with something else but the due date in Task Planner still display as today. Can you help?
If(
gblselectedareainspection,
Set(
Taskid,
Planner.CreateTaskV3(
gblPlannerGroupId,
gblPlannerPlanId,
LookUp('Area Inspection Locations', 'Area Inspection Location' = gblTempLocID).Name, //gblSelectedLocation.Name,
{
bucketId: locPlannerBucketForTask,
dueDateTime: Today(), //datTaskDate.Value,
assignments: If(CountRows(colTaskAssignments)>0,Concat(
colTaskAssignments,
appEmailAddress,
";"
))
}
)
),