Does 2 multistage pr running at same time use same workspace and mix output

Patil, Prreeya 20 Reputation points
2026-11-05T08:52:21.5933333+00:00

when 2 pr has been running simultaneously , as pipeline is multistage. 1 stage runs of 1 pr and it runs 1 stage from other pr, then 2nd stage of 1st pr..so its zigzag.. so does the output get mixed..

as i checked the logs, both pr are using "_work\1\s" workspace.

Azure DevOps
0 comments No comments

1 answer

Sort by: Most helpful
  1. Patil, Prreeya 20 Reputation points
    2026-11-05T08:58:11.7566667+00:00
    • powershell: | Write-Host "Run=$(Build.BuildId)" Write-Host "Agent=$(Agent.Name)" Write-Host "Machine=$(Agent.MachineName)" Write-Host "Workspace=$(Pipeline.Workspace)" Write-Host "Sources=$(Build.SourcesDirectory)"

    i have checked this values by running it in pipeline, agent is same for both pr, but buildid is different..rest all things are same for both pr.

    Was this answer helpful?