Replacing the Heater

Read the following sections before you remove the old heater and install the new heater.

Unpacking and taking inventory of the heater

The Ruggedized 1U Heater – V2 (the heater) typically ships as a pre-installed sub-component of the Ruggedized Cloud Appliance system. When shipped separately, the heater is shipped in a standard commercial shipping carton with protective packing material.

Carefully remove the heater from the shipping carton. When packed in a shipping carton, the heater has all key components installed in the chassis. The heater is usually part of a transit case and integrated with an entire group of devices in a transit case. Keep the shipping carton and packing materials for any possible need to re-ship the heater in the future. While the heater is robust, ensure that the unit is properly packed for shipment.

Do an inventory check to ensure that everything is accounted for. For discrepancies, contact Microsoft.

Heater installation planning

Before you begin your installation, ensure that you are familiar with the configuration requirements of the heater unit. Before you begin the installation:

  1. Prepare the transit case for heater installation.

  2. Verify that you have all necessary screws and washers for the heater installation:

    • Four black screws 10-32 x 7/8 with four split washers and four flat washers

    • Four silver 10-32 x 5/8 screws with four split washers and four flat washers

  3. Ensure that cables or cords are not in the way of installation.

Heater installation notes

The heater is mounted into a transit case capable of holding the unit.

  • Remove the lids of the transit case and any shipping covers while the heater is in use.

  • Ensure that there is a minimum gap of six inches in the front and rear of the heater to maintain the correct airflow around the unit.

  • Mount the heater into the rack in the transit case.

  • Mount the heater into the 19-inch rack in the transit case. Use two or more individuals to manage the weight of the unit during the mounting process.

  • Install any other required component such as plenums, cables, or brackets.

Note

Ensure that the socket outlet is installed near the equipment and is easily accessible.

Removing the heater

  1. Starting with the front pod cover, turn the eight cover latches counterclockwise to release the cover from the pod. Hold or secure the cover as you release all eight latches.

    Diagram that shows the front pod cover with the cover latches highlighted.

  2. Remove the pod cover.

    Removing the front pod cover.

  3. Repeat steps 1 and 2 to remove the rear pod cover. Now you can access the components inside the pods.

  4. Fully loosen the screws and then pull the filter assembly away from the server, as shown in the following figures.

    Diagram that shows the location of the screws on the filter assembly.

    Pulling away the filter assembly.

  5. Pull the release tabs away from the Ruggedized 1U Heater - V2 until the cover releases and then move the cover outward from the chassis rack in the pod.

    Diagram that shows the release tabs.

  6. When the lower section of the plenum clears the base, pull outward to approximately forty degrees. The angle allows you to move the top of the plenum toward the server or switches, and then up and away before pulling the plenum out of the pod.

    Diagram that shows the plenum being removed.

  7. In the front of the case, remove the zip tie from under the Ruggedized 1U Heater - V2. Use the diagonal cutters if necessary.

    Diagram that shows the bracket for the zip tie and the micro connector for the temperature inlet sensor highlighted.

  8. Squeeze the micro-connector front tab with your thumb and index finger and pull downward until the connection is free from the bottom of heater. Move the cable out of the way of the heater.

    Diagram that shows the server inlet temp sensor with the cable attached.

  9. At the front of the case, remove the four 10-32 screws, lock washers, and flat washers from the management server or bottom scale unit node server.

    Diagram that shows the location of the screws at the front of the case.

    Two diagrams that show the screws being removed from each side of the case.

  10. At the front of the case, remove the front four 10-32 screws, lock washers, and flat washers from the heater.

    Diagram that shows the location of the four screws on the front of the heater.

    Two diagrams that show the screws being removed from each side of the heater.

  11. Unwind ethernet cables from the rear plenum, then remove any cable connected to the management server or bottom scale unit node server.

  12. At the back of the case, loosen the six Velcro straps and pull the cables out from the Velcro.

    Diagram that shows the location of the six Velcro straps on the back of the case.

  13. At the back of the case, after the Velcro is loosened, remove the cables from around the cable stowage brackets.

  14. Allow all cables to hang out and away from the plenum. Hanging cables are not shown in following figure.

    Diagram that shows the cable way for power and Ethernet cables.

  15. At the back of the case, quickly pull the plenum door down using the top lip of the plenum door. The plenum door should be disconnected from the linkage, allowing the door to hang freely.

  16. Pull the plenum downward if the linkage is still attached.

    Diagram that shows the plenum at the back of the case being pulled downward.

    Diagram that shows the plenum being pulled down from the left-back side.

  17. At the back of the case, unplug the server power cables from the Ruggedized 1U Heater - V2 and allow them to hang freely.

    Diagram that shows the location of the server power cables at the back of the case.

  18. Unplug the power cables from the server and allow them to hang freely.

  19. At the back of the case, remove the bottom server ground cable.

  20. Place an electrostatic discharge-safe bag or foam over the heater vent.

  21. In the following order, remove from the server:

    1. hex nut

    2. washer

    3. connection terminal ring

    4. two washers

    Diagram that shows the location of the connection terminal ring.

    Diagram that shows the individual hardware for the connection terminal ring.

  22. Place the hex nut and washers back on the grounding post or in safe location for reinstallation.

  23. At the back of the case, fully loosen the two captive screws holding the right filler bracket in place.

    Diagram that shows the back of the case, with the captive screws on the right side highlighted.

    Diagram that shows the captive screws being turned.

  24. Pull the right filler bracket towards center of case to remove it.

  25. At the back of the case, fully loosen the two captive screws holding the left cableway bracket in place.

    Diagram that shows the back of the case, with the captive screws on the left side highlighted.

    Diagram that shows the captive screws turned and the cableway bracket being removed.

  26. Pull the left cableway bracket towards center of case to remove it.

  27. Place the brackets in a safe location for reinstallation.

  28. At the back of the case, remove the one Cat 6 blue and two 25 Gbps black ethernet cables from the management or bottom scale unit node server.

    Diagram that shows the location of the Cat 6 blue and 25 Gbps black ethernet cable locations on the back of the case.

  29. Place the cables in safe location for reinstallation.

  30. At the back of the case, fully loosen the two captive screws holding the left inner cableway bracket in place.

    Diagram that shows the back of the case, and the captive screws on the left side highlighted.

    Diagram that shows the captive screws being turned and the cableway bracket being removed.

  31. Pull the left inner cableway bracket towards center of case to remove it.

  32. At the back of the case, unscrew the six hinge screws from the top of the heater, leaving the door and hinge pin together as one unit.

    Diagram that shows the six hinge screws being removed.

  33. Place the bracket and screws in a safe location for reinstallation.

  34. At the back of the pod, remove the two 10-32 rail screws, lock washers, and flat washers that secure the server rail to the pod rack.

    Diagram that shows the location of the screws that secure the server rail.

    Diagram that shows the screws on the left and right sides of the case that secure the server rail being removed.

  35. At the back of the pod, remove the four 10-32 screws, lock washers, and flat washers that secure the heater to the pod rack.

    Diagram that shows the location of the four screws that secure the heater.

    Diagram that shows a close up of the four screws that secure the heater.

  36. Ensure all cables are unplugged and hanging freely out of the way.

  37. At the front of the pod, carefully slide the server out. Hold the center of the server for even weight distribution as it is moved outward.

    Diagram that shows the server being removed from the pod.

  38. Place the server on an electrostatic discharge-safe location.

  39. At the front of the pod, pull the heater from the bottom of the rack. Hold the center of the heater for even weight distribution as it is moved outward.

    Diagram that shows the heater being removed from the pod.

Installing the heater

Warning

Electric shock hazard.

Note

When installing hardware in the front or back of the server, place an electrostatic discharge-safe cover over the heater vents to prevent foreign object damage to the heater.

Warning

Use caution when lifting the pod to prevent damage to the equipment and personal injury. For best results, use a two-person lift or lifting equipment to reduce personal injury or damage to the components or pod.

  1. At the front of the pod, slide a new zip tie though the loop in the bottom front of the Ruggedized 1U Heater - V2, but do not zip the tie into place.

    Diagram that shows the loop on the bottom front of the heater.

  2. At the front of the pod, insert the Ruggedized 1U Heater - V2 by sliding it in from front to back. Ensure that the zip tie does not fall out.

  3. At the front of the pod, install the two .064 inch shims between the rack and the Ruggedized 1U Heater - V2.

    Diagram that shows the location of the shims on the front of the pod.

  4. At the back of the pod, install the two .064 inch shims between the rack and the Ruggedized 1U Heater - V2.

    Diagram that shows the location of the shims on the back of the pod.

  5. At the front of the pod, reattach the four 10-32 screws, lock washers, and flat washers. Apply primer and low strength threadlocker to the screw threads, and torque the screws to 27 inch-pounds.

    Diagram that shows the screws being reattached.

  6. At the front of the pod, install the management server or lower scale unit node server, sliding it in from front to rear. Ensure there are no loose cables in the way of the server.

  7. At the front of the pod, reattach the four 10-32 screws, lock washers, and flat washers. Apply primer and low strength threadlocker to the screw threads, and torque the screws to 27 inch-pounds.

    Diagram that shows the server screws being reattached.

  8. At the back of the pod, reattach the two server rear mounting 10-32 screws, lock washers, and flat washers. Apply primer and low strength threadlocker to the screw threads, and torque to 27 inch-pounds.

    Diagram that shows the two server rear mounting screws being reattached.

  9. At the back of the pod, install the Ruggedized 1U Heater - V2 four rear mounting 10-32 screws, lock washers, and flat washers. Apply primer and low strength threadlocker to the screw threads, and torque the screws to 27 inch-pounds.

    Diagram that shows the four screws for the heater being reattached.

  10. At the back of the pod, remove the two shims from below the Ruggedized 1U Heater - V2 and place them in the Heater Kit for future use.

  11. At the front of the pod, remove the two shims from below the Ruggedized 1U Heater - V2 and place them in the Heater Kit for future use.

  12. At the back of the pod, install the six 4-40 screws that attach the plenum hinge to the Ruggedized 1U Heater - V2. Apply primer and low strength threadlocker to the screw threads, and torque the screws to 4.5 inch-pounds.

    Note

    Place an electrostatic discharge (ESD) bag or ESD foam over the Ruggedized 1U Heater - V2 vent to prevent foreign object damage to the heater.

  13. At the back of the pod, install the left inner cableway bracket. While pressing the bracket inwards toward the rack, fully tighten the captive 6-32 screws then torque the screws to 9 inch-pounds.

  14. At the back of the case, install the one Cat 6 blue and two 25 Gbps black ethernet cables into the management or bottom scale unit node server.

  15. At the back of the pod, install the left cableway bracket in its original location. Carefully align all cables back into position while pressing the bracket inwards toward the rack.

  16. Fully tighten the two captive 6-32 screws then torque the screws to 9 inch-pounds.

  17. At the back of the pod, install the right filler bracket in its original location while pressing the bracket inwards toward the rack. Fully tighten the two captive 6-32 screws then torque the screws to 9 inch-pounds.

  18. At the back of the pod, install the management server or lower scale unit node server ground hardware in this order:

    1. two washers

    2. terminal ring connection

    3. washer

    4. hex nut

  19. Torque the nut to 16 inch-pounds.

  20. At the back of the pod, reconnect the two server power cables, then the four Ruggedized 1U Heater - V2 power cables into their original locations.

  21. At the back of the pod, linkage should be resting up and behind the ball detents, if not move the linkage arm up to the required position.

    Hold the plenum door steady while adjusting the arm behind the ball detents.

    Diagram that shows the ball detents being adjusted.

    Close up of the ball detents.

  22. At the back of the pod, press either location A or B with both thumbs (simultaneously press both left and right or upper and lower) until an audible click is heard from the linkage engaging the plenum.

    Diagram that shows the locations to press and engage the plenum.

  23. At the back of the pod, wind the six ethernet cables (two blue Cat 6 and four black 25 Gbps cables) around the cable stowage spooling brackets and tighten the six Velcro straps around the cables.

  24. At the front of the pod, install the micro connector to the server inlet temperature sensor. You should hear an audible click.

  25. At the front of the pod, route the cable under the loop, wrap the zip tie around cable, and zip it into place. Clip the excess zip tie.

    Diagram that shows the loop for the zip tie and the server inlet temp sensor.

  26. At the front of the pod, install the front plenum, by holding the plenum at approximately a forty degree angle (minimum) while placing your index fingers on the front angled flat section. Guide the folded metal of the plenum onto the chassis rack folded metal.

    Diagram that shows the front plenum being installed.

  27. When aligned properly, use the release tabs to place the plenum into position.

  28. Press and turn the release tabs so that they engage their original locations and lock into position.

  29. At the back and front of the pod, place the pod covers place back into their original locations, then connect the latches and turn them clockwise to secure them to the pod.

  30. Hold or secure the cover as you connect all eight latches.