Edit

Tutorial 1-8: Migrate Resources into or within Azure Enclave

This article covers how to move resources when those resources are linked to Azure Enclave resources (for example enclaves or workloads).

Supported Resources

Ensure your resources are included in this moveable resources list.

Example move

Resources for an enclave are split between the enclave managed resource group (MRG) and the workload resource group. Following this example scenario the resources to be moved should be put in one resource group. Connections outside of the enclave should also be removed.

More information

Read this article for more information on moving Azure resources into Azure Enclave.