In a production flow version, all activities must be sequenced. An activity can have one or multiple predecessors or successors.
This procedure shows how to associate a predecessor to an activity.
To perform this task, you need a production flow that has the Draft version with at least two activities that can be connected.
To learn more, read the white paper Lean manufacturing: Production flows and activities.
Find the production flow and version
- Go to Production control > Setup > Lean production flow > Production flows.
- In the list, find and select the desired record.
- In the list, click the link in the selected row.
- In the list, find and select the desired record.
- Click Activities.
Select an activity and add a predecessor
- In the list, find and select the desired record.
- Click Add predecessor.
- In the Activity field, enter or select a value.
- In the Cycle time ratio field, enter a number.
- The default cycle time ratio of an activity relation is 1. This assumes that both activities run at the same pace or takt time. If the predecessor runs at a higher pace (lower takt time), the ratio should be lower than 1, if the predecessor runs at a slower pace (higher takt time) the cycle time ratio is greater than 1.
- Click OK.