Product Builder Route nodes upgrade

Important

This content is archived and is not being updated. For the latest documentation, see Microsoft Dynamics 365 product documentation. For the latest release plans, see Dynamics 365 and Microsoft Power Platform release plans.

Applies To: Microsoft Dynamics AX 2012 R3, Microsoft Dynamics AX 2012 R2, Microsoft Dynamics AX 2012 Feature Pack, Microsoft Dynamics AX 2012

This topic describes how to map modeling variables assigned to product models and nodes in the modeling tree to fixed values during the upgrade process. The target system does not support modeling variables. Therefore, existing modeling variables must be mapped to fixed values. The fields that are available on the right side of the form can vary, depending on the modeling variables that are allocated for each product model.

Example

If a modeling variable is allocated for a resource in a product model, the Resource (Variable) field shows the modeling variable. You must then select the fixed resource that you want to map the variable to in the Resource field.

If you are upgrading to Microsoft Dynamics AX 2012 R2 or AX 2012 R3, you must identify a data partition when performing this task. If you have configured multiple partitions, the procedure must be repeated for each partition. For more information about data partitions and upgrade, see Configure partitions.

To map route variables for upgrade

  1. Click Prepare application data for preprocessing > Product builder route nodes upgrade.

  2. In the Partition key field, select a partition for preprocessing.

  3. Select a product model in the grid on the left side of the form. Depending on the modeling variables that require mapping, do one of the following in the available fields.

    • In the Resource field, select the fixed resource to which you want to map the modeling variable shown in the Resource (Variable) field.

    • In the Load field, enter a number for the load that you want to map the modeling variable to.

    • In the Qty. of Resources field, enter a number for the quantity of resources that you want to map the modeling variable to.

    • In the Job Requirement field, enter a number for the job requirement that you want to map the modeling variable to.

  4. To mark this item on the preprocessing checklist as completed, and continue to the next item on the preprocessing checklist, click the Set to ready for upgrade button.

See also

Product Builder - Route Operation nodes with variable allocations to resource fields (form)