ActualWorkProtected Element

Specifies the duration through which actual work is protected, for a task, resource, or assignment.

<ActualWorkProtected>
  DurationValue
</ActualWorkProtected>

Parent Elements

TaskResourceAssignment

Occurrences

Minimum: 0

Maximum: 1

See Also

Concepts

Task Elements and XML Structure

XML Schema for the Tasks Element

Resource Elements and XML Structure

XML Schema for the Resources Element

Assignment Elements and XML Structure

XML Schema for the Assignments Element