CostVariance Element

The difference between the baseline cost and total cost for a resource or assignment.

<CostVariance>
  FloatValue
</CostVariance>

Parent Elements

ResourceAssignment

Occurrences

Minimum: 0

Maximum: 1

See Also

Concepts

Resource Elements and XML Structure

XML Schema for the Resources Element

Assignment Elements and XML Structure

XML Schema for the Assignments Element