Duration Element

For a Task , Duration is the total span of active working time.

For a task's Baseline , it is the scheduled duration of the task when the baseline was saved.

For Sprints, the duration value of the sprint.

<Duration>
  TimeSpanValue
</Duration>

Parent Elements

Occurrences

Minimum: 0

Maximum: 1

See Also

Concepts

Task Elements and XML Structure

XML Schema for the Tasks Element