OvertimeCost Element

For a Task, OvertimeCost is the sum of the actual overtime cost for the task.

For a Resource, it is the total overtime cost for a resource on all assigned tasks.

For an Assignment, it is the total overtime cost for a resource assignment.

<OvertimeCost>
  DecimalValue
</OvertimeCost>

Parent Elements

TaskResourceAssignment

Occurrences

Minimum: 0

Maximum: 1

See Also

Concepts

Task Elements and XML Structure

XML Schema for the Tasks Element

Resource Elements and XML Structure

XML Schema for the Resources Element

Assignment Elements and XML Structure

XML Schema for the Assignments Element