Stop Element
For a Task, Stop is the date that represents the end of the actual portion of a task.
For an Assignment, it is the date that the assignment was stopped.
<Stop>
DateTimeValue
</Stop>
Parent Elements
Occurrences
Minimum: 0 Maximum: 1 |
See Also
Concepts
Task Elements and XML Structure
XML Schema for the Tasks Element