ReqPlanData.schedReqDateIssue Method [AX 2012]
Backwards schedules a date on the calendar based on the issue margin of the specified requirements.
Syntax
public ReqDate schedReqDateIssue(ReqDateDlv _reqDateDlv, ReqSetupDim _setupDim)
Run On
Called
Parameters
- _reqDateDlv
Type: ReqDateDlv Extended Data Type
The requirement date to use as starting date for the scheduling.
- _setupDim
Type: ReqSetupDim Class
The dimension-based planned order requirement setup.
Return Value
Type: ReqDate Extended Data Type
A date that complies with the parameters.