Share via


Unit Cost per Field, Routing Line Table

Specifies the task-related production costs.

This value is used in the unit cost calculation.

There are two ways to enter calculation rates. If you want to calculate with a uniform calculation rate per capacity, this is saved in the Unit Cost field on the work center card. However, if you want work with different cost rates that depend on the operation, you can control this with the Specific Unit Cost field on the work center card.

Tip

For more information on how to work with fields and columns, see Work with Data. For assistance in finding specific pages, see Search.

Parent Tables

Table Location
Routing Line Table Manufacturing
Routing Line Table Manufacturing

See Also

Reference

Routing

Other Resources

How to: Create Routings