The right-most level of the task work breakdown structure.

<WBSLevel>
  StringValue
</WBSLevel>

Parent Elements

Task

Occurrences

Minimum: 0

Maximum: 1

Remarks

For example, if the task WBS is A.01.03, the WBSLevel is 03.

See Also

Reference

WBS Element

Concepts

Task Elements and XML Structure

XML Schema for the Tasks Element