This browser is no longer supported.
Upgrade to Microsoft Edge to take advantage of the latest features, security updates, and technical support.
Test-AzResourceGroupDeployment returns no findings. What can you conclude?
Test-AzResourceGroupDeployment
The Azure Local Validate deployment already created the prerequisite resources.
Validate
That ARM validation call returned no findings. Target-environment readiness remains a separate requirement.
The cluster and its storage are healthy.
A site chooses Local Identity with Azure Key Vault. Which preparation matches that branch?
Create a supported non-built-in local administrator account with matching credentials across nodes, static addresses, and the required DNS configuration.
Prepare an AD DS OU because every Azure Local deployment requires domain membership.
Use the built-in Administrator account and DHCP because there's no AD DS dependency.
An operator has Contributor on the resource group, but the template needs to create role assignments. What should happen next?
Have the governance owner establish the documented role-assignment permission at the appropriate scope.
Grant subscription Owner without further investigation.
Replace the template with portal deployment to bypass authorization.
A bridge stage fails after a dependent extension reports that it can't retrieve a required secret. What should you examine first?
The application running inside a workload VM.
The extension's actual secret-consumer identity, vault access path, authorization, and connectivity.
The bridge's display name, followed by immediate appliance replacement.
Validation completed, but the system is now in Deployment failed state. What's the appropriate approach?
Always submit Validate again before every retry.
Delete the resource group to reverse all local changes.
Repair the confirmed dependency and use the supported failed-stage recovery procedure.
An approved InfraOnly deployment completes without workload storage paths. What does this mean?
InfraOnly
Infrastructure-only provisioning behaved as intended. Workload storage must still be prepared before workload-ready acceptance.
Resource Manager silently lost the deployment parameters.
All storage must be recreated.
Resource Manager reports success, but a node is unavailable and storage repair is active. Can you approve a fully commissioned platform?
Yes, if the custom location resource exists.
No. Local acceptance criteria remain unmet even though the cloud operation succeeded.
Yes. Resource Manager success overrides local health observations.
Simplified machine provisioning reports Ready to cluster. What remains?
Only enabling Azure Arc gateway, which the preview requires.
Nothing. The preview has certified application readiness.
The normal supported cluster deployment, validation, and commissioning workflow.
You must answer all questions before checking your work.
Was this page helpful?
Need help with this topic?
Want to try using Ask Learn to clarify or guide you through this topic?