This browser is no longer supported.
Upgrade to Microsoft Edge to take advantage of the latest features, security updates, and technical support.
Choose the best response for each of the questions.
You need to initiate a cycle count if the quantity of an item goes below 50 units in a specific location. Which cycle counting method should you follow?
Manual cycle counting
Cycle counting threshold
Cycle counting plan
You need to maintain a fixed quantity of raw materials at the issue location of your production warehouse so it is available instantly during the production process. Which replenishment strategy should you use?
Min/Max
Load demand
Immediate
You need to reserve a batch-tracked item in your warehouse. The product requirement is to reserve only a specific batch number for the item. Where should you position the batch dimension in the reservation hierarchy?
Before warehouse
Between warehouse and location
After location
You must answer all questions before checking your work.
Was this page helpful?
Need help with this topic?
Want to try using Ask Learn to clarify or guide you through this topic?