UCSI Get Connector Status - Negotiated Power Level Change [Type-C MUTT]

Verifies that the system reports a 'Negotiated Power Level Change' notification in response to the negotiated Power Delivery contract changing.

Test details

   
Specifications
  • System.Fundamentals.SystemUSB.USBC.USBTypeCUCSI.USBTypeCUCSI
Platforms
  • Windows 10, client editions (x86)
  • Windows 10, client editions (x64)
  • Windows 10, client editions (Arm64)
  • Windows Server 2016 (x64)
  • Windows 10, mobile edition (Arm)
  • Windows 10, mobile edition (Arm64)
Supported Releases
  • Windows 10, version 1803
  • Windows 10, version 1809
  • Windows 10, version 1903
  • Next update to Windows 10
Expected run time (in minutes) 3
Category Compatibility
Timeout (in minutes) 10
Requires reboot false
Requires special configuration true
Type manual

More Information

Parameters

Parameter Name Parameter Description
WaitTimeMultiplier For tests that require the Type-C MUTT, this is a multiplier of the generic wait times that the test will wait for the Type-C MUTT to be enumerated. In general, the default times should be sufficient, but some platforms require additional time.
NegotiatedPowerLevelChangeNotification Set to False if the SUT cannot trigger the Negotiated Power Level Change notification.
WaitTimeInMinutes For tests that require manual intervention, this is the amount of time in minutes the test will wait to see the event that is expected to occur in response to the requested manual action.
UcsiConnectorNumber UCSI connector that the Type-C MUTT device is connected to.

Additional Documentation

Tests in this feature area might have additional documentation, including prerequisites, setup, and troubleshooting information, that can be found in the following topic(s):

Troubleshooting

For generic troubleshooting of HLK test failures, see Troubleshooting Windows HLK Test Failures.