MCRPastDueContinuityDays Extended Data Type
Help Text: Number of days prior to the continuity start date to include in the master plan.
Alignment: Auto
Base Type: Integer
Base Type Properties
Allow Negative: Auto
Analysis Default Sort Property: Ascending
Analysis Default Total Property: No
Analysis Grouping Property: Auto
Analysis Usage Property: None
Auto
Displace Negative: Auto
ID: 31521 (non-default)
Model: Foundation (non-default)
Rotate Sign: Auto
Show Zero: Auto
Sign Display: Auto