Definition

public interface class _Global
[System.Runtime.InteropServices.Guid("78E9F620-EBC0-11CF-A523-00A0C904DE55")]
[System.Runtime.InteropServices.InterfaceType(2)]
public interface _Global
type _Global = interface
Public Interface _Global
Derived
Attributes

Properties

ActiveCell
ActiveProject
ActiveSelection
ActiveWindow
AMText
AnswerWizard
Application
AskToUpdateLinks
Assistance
Assistant
AutoClearLeveling
AutoLevel
AutomaticallyFillPhoneticFields
Build
Calculation
Caption
CellDragAndDrop
COMAddIns
CommandBars
CompareProjectsCurrentVersionName
CompareProjectsPreviousVersionName
CopyResourceUsageHeader
DateOrder
DateSeparator
DayLeadingZero
DecimalSeparator
DefaultAutoFilter
DefaultDateFormat
DefaultView
DisplayAlerts
DisplayEntryBar
DisplayNotesIndicator
DisplayOLEIndicator
DisplayPlanningWizard
DisplayProjectGuide
DisplayRecentFiles
DisplayScheduleMessages
DisplayScrollBars
DisplayStatusBar
DisplayViewBar
DisplayWindowsInTaskbar
DisplayWizardErrors
DisplayWizardScheduling
DisplayWizardUsage
Edition
EnableCancelKey
EnableChangeHighlighting
EnterpriseAllowLocalBaseCalendars
EnterpriseListSeparator
EnterpriseProtectActuals
FileBuildID[String, Object, Object]
FileFormatID[String, Object, Object]
GetCacheStatusForProject[String, PjJobType]
GlobalBaseCalendars
GlobalOutlineCodes
GlobalReports
GlobalResourceFilters
GlobalResourceTables
GlobalTaskFilters
GlobalTaskTables
GlobalViews
GlobalViewsCombination
GlobalViewsSingle
IsCheckedOut[String]
LevelFreeformTasks
LevelIndividualAssignments
LevelingCanSplit
LevelOrder
LevelPeriodBasis
LevelProposedBookings
LevelWithinSlack
ListSeparator
LoadLastFile
MacroVirusProtection
MonthLeadingZero
MoveAfterReturn
Name
NewTasksEstimated
OperatingSystem
PanZoomFinish
PanZoomStart
Parent
Path
PathSeparator
PMText
Profiles
Projects
PromptForSummaryInfo
RecentFilesMaximum
ScreenUpdating
ShowAssignmentUnitsAs
ShowEstimatedDuration
ShowTipOfDay
ShowToolTips
ShowWelcome
StartWeekOn
StartYearIn
SupportsMultipleDocuments
SupportsMultipleWindows
ThousandSeparator
TimeLeadingZero
TimescaleFinish
TimescaleStart
TimeSeparator
TrustProjectServerAndWSSPages
TwelveHourTimeFormat
UndoLevels
UsableHeight
UsableWidth
Use3DLook
UseOMIDs
UserControl
UserName
VBE
Version
Visible
VisualReportsAdditionalTemplatePath
VisualReportTemplateList
Windows
Windows2
WindowState

Methods

About()
AddNewColumn(Object)
AddProgressLine()
AddResourcesFromProjectServer()
AddSiteColumn(PjField, Object)
AfterUnloadWebBrowserControl()
Alerts(Object)
AlignTableCellBottom()
AlignTableCellTop()
AlignTableCellVerticalCenter()
AppExecute(Object, Object, Object, Object)
AppLaunch(String, Object, Object)
ApplyReport(Object, Object)
ApplyReportLayoutTemplate(PjReportLayoutTemplateId)
AppMaximize()
AppMinimize()
AppMove(Object, Object, Object)
AppRestore()
AppSize(Object, Object, Object)
AutoCorrect()
AutoFilter()
AutoSaveToGlobal(Object)
BarBoxFormat()
BarBoxStyles()
BarRounding(Object)
BaseCalendarCreate(String, Object)
BaseCalendarDelete(String)
BaseCalendarEditDays(String, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
BaseCalendarRename(String, String)
BaseCalendarReset(String)
BaseCalendars(Object, Object)
BaselineClear(Object, Object)
BaselineSave(Object, Object, Object, Object, Object, Object)
BoxAlign(PjAlign)
BoxCellEdit(String, PjCell, PjField, Object, Object, PjColor, Object, Object, Object, PjAlignment, PjVerticalAlignment, Object, Object, Object, PjDateFormat)
BoxCellEditEx(String, PjCell, PjField, Object, Object, Object, Object, Object, Object, PjAlignment, PjVerticalAlignment, Object, Object, Object, PjDateFormat)
BoxCellLayout(String, Object, Object, Object, Object)
BoxDataTemplate(String, PjDataTemplate, Object, Object)
BoxFormat(Object, Object, Object, Object, Object, PjBoxShape, PjColor, Object, PjColor, PjBackgroundPattern, Object)
BoxFormatEx(Object, Object, Object, Object, Object, PjBoxShape, Object, Object, Object, PjBackgroundPattern, Object)
BoxGetXPosition(Int32, Object)
BoxGetYPosition(Int32, Object)
BoxLayout(PjLayoutMode, PjLayoutScheme, Object, PjVerticalAlignment, PjAlignment, Object, Object, PjRowColSize, PjRowColSize, Object, Object, PjColor, PjBackgroundPattern, Object, Object, Object)
BoxLayoutEx(PjLayoutMode, PjLayoutScheme, Object, PjVerticalAlignment, PjAlignment, Object, Object, PjRowColSize, PjRowColSize, Object, Object, Object, PjBackgroundPattern, Object, Object, Object)
BoxLinkLabelsShow(Object)
BoxLinks(PjLinkStyle, Object, Object, PjLinkColorMode, PjColor, PjColor)
BoxLinksEx(PjLinkStyle, Object, Object, PjLinkColorMode, Object, Object)
BoxLinkStyleToggle(Object)
BoxProgressMarksShow(Object)
BoxSet(PjBoxSet, Object, Object, Object, Object)
BoxShowHideFields(Object)
BoxStylesEdit(PjBoxStyle, Object, Object, Object, PjBoxShape, PjColor, Object, PjColor, PjBackgroundPattern)
BoxStylesEditEx(PjBoxStyle, Object, Object, Object, PjBoxShape, Object, Object, Object, PjBackgroundPattern)
BoxZoom(Object, Object)
CacheSettings()
CacheStatus()
CalculateAll()
CalculateProject()
CalendarBarStyles(Object)
CalendarBarStylesEdit(PjBarItem, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
CalendarBarStylesEditEx(PjBarItem, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
CalendarBestFitWeekHeight()
CalendarDateBoxes(Object, Object, Object, Object, Object, Object, Object, Object)
CalendarDateBoxesEx(Object, Object, Object, Object, Object, Object, Object, Object)
CalendarDateShading(Object, Object, Object)
CalendarDateShadingEdit(PjCalendarShading, Object, Object)
CalendarDateShadingEditEx(PjCalendarShading, Object, Object)
CalendarLayout(Object, Object)
CalendarShowBarSplits(Object)
CalendarTaskList(Object)
CalendarTimescale()
CalendarWeekHeadings(Object, Object, Object, Object, Object)
CalendarWeekHeadingsEx(Object, Object, Object, Object, Object, Object)
ChangeColumnDataType(PjFieldTypes, Object)
ChangeStatusDate(Object)
ChangeWorkingTime(Object, Object)
ChangeWorkingTimeEx(Object, Object, Object, Object)
CheckField(String, String, Object, Object, Object, Object, Object)
CheckIn(Object, Object, Object)
CheckOut()
CheckResourceErrors(Object, Object, Object)
CheckTaskErrors(Object)
CleanupCache()
CleanupProjectFromCache(Object)
ClearConstraint(Int32)
ClipboardShow()
CloseComparison()
CloseUndoTransaction()
ColumnAlignment(PjAlignment)
ColumnBestFit(Object)
ColumnDelete()
ColumnEdit(Object)
ColumnInsert()
ComAddInsDialog()
CommitmentsPane()
CompareProjectsLegendToggle()
CompareProjectVersions()
ConsolidateProjects(Object, Object, Object, Object, Object, PjPoolOpen, Object, Object)
ConvertHangulToHanja()
CopyReport()
CreateComparisonReport(Object, Object, Object, PjCompareVersionItems, PjCompareVersionColumns, Object)
CreateEnterpriseCalendar()
CreateProjectSite(Object, Object, Object)
CreatePublisher(Object, Object)
CreateWebAccount(Object, Object, PjAuthentication, PjAccountType, Object, Object, Object)
CustomFieldDelete(Int32)
CustomFieldGetFormula(PjCustomField)
CustomFieldGetName(PjCustomField)
CustomFieldIndicatorAdd(PjCustomField, PjComparison, String, PjIndicator, PjCriteriaList, Object)
CustomFieldIndicatorDelete(PjCustomField, Int16, PjCriteriaList)
CustomFieldIndicators(PjCustomField, Object, Object, Object)
CustomFieldMappingDialog(Object)
CustomFieldProperties(PjCustomField, PjCustomFieldAttribute, PjSummaryCalc, Object, Object)
CustomFieldPropertiesEx(PjCustomField, PjCustomFieldAttribute, PjSummaryCalc, Object, Object, Object)
CustomFieldRename(PjCustomField, Object, Object)
CustomFieldSetFormula(PjCustomField, Object)
CustomFieldValueList(PjCustomField, Object, Object, Object, Object, Object, PjListOrder)
CustomFieldValueListAdd(PjCustomField, Object, Object, Object, Object, Object)
CustomFieldValueListDelete(PjCustomField, Int16)
CustomFieldValueListGetItem(PjCustomField, PjValueListItem, Int32)
CustomForms()
CustomizeField()
CustomizeIMEMode(PjField, PjIMEMode)
CustomOutlineCodeEdit(PjCustomField, Object, PjCustomOutlineCodeSequence, Object, Object, Object, Object, Object, Object, Object, Object)
CustomOutlineCodeEditEx(PjCustomField, Object, PjCustomOutlineCodeSequence, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
DateFormat(Object, Object)
DateSubtract(Object, Object, Object)
DDEExecute(String, Object)
DDEInitiate(String, String)
DDELinksUpdate()
DDEPasteLink()
DDETerminate()
DeleteFromDatabase(Object, Object, Object, Object)
DependenciesPane()
DetailsPaneToggle(Object)
DetailStylesAdd(PjTimescaledData, Object)
DetailStylesFormat(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
DetailStylesFormatEx(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
DetailStylesProperties(Object, Object, Object, Object)
DetailStylesRemove(PjTimescaledData)
DetailStylesRemoveAll()
DetailStylesToggleItem(PjTimescaledData)
DisplaySharedWorkspace()
DistributeTableColumns()
DistributeTableRows()
DocClose()
DocMaximize()
DocMove(Object, Object, Object)
DocRestore()
DocSize(Object, Object, Object)
DocumentExport(Object, PjDocExportType, Object, Object, Object, Object, Object)
DocumentLibraryVersionsDialog()
DrawingCreate(PjShape, Object)
DrawingCycleColor()
DrawingMove(Object, Object)
DrawingProperties(Object)
DrawingReshape()
DrawingToolbarShow()
DurationFormat(Object, Object)
DurationValue(String)
EditClear(Object, Object, Object, Object)
EditClearFormats()
EditClearHyperlink()
EditCopy()
EditCopyPicture(Object, Object, Object, Object, Object, Object, PjCopyPictureScaleOption, Object, Object, Object)
EditCut()
EditDelete()
EditEnterpriseCalendar(Object)
EditGoTo(Object, Object)
EditHyperlink(Object, Object, Object, Object)
EditInsert()
EditionStopAll(Object)
EditPaste()
EditPasteAsHyperlink()
EditPasteSpecial(Object, Object, Object)
EditRedo()
EditTPStyle(PjTeamPlannerStyle, Object, Object)
EditUndo()
EnterpriseCustomizeFields()
EnterpriseCustomOutlineCodeShare(Int32, Object)
EnterpriseGlobalBackup(Object)
EnterpriseGlobalCheckOut()
EnterpriseGlobalRestore(Object, Object)
EnterpriseMakeServerURLTrusted()
EnterpriseProjectDelete(Object)
EnterpriseProjectImportWizard(Object)
EnterpriseProjectProfiles()
EnterpriseResourceGet(Object, Object)
EnterpriseResourcesImport(Object)
EnterpriseResourcesImportEx(Object, Object)
EnterpriseResourcesOpen(Object, PjCheckOutType)
EnterpriseResSubstitutionWizard(Object, PjResSubstitutionPoolOption, Object, Object, Object, Object, Object, Object, Object)
EnterpriseSynchActuals(Object)
EnterpriseTeamBuilder()
FieldConstantToFieldName(PjField)
FieldNameToFieldConstant(String, PjFieldType)
FileClose(PjSaveType, Object)
FileCloseAll(PjSaveType)
FileCloseAllEx(PjSaveType, Object)
FileCloseEx(PjSaveType, Object, Object)
FileExit(PjSaveType)
FileLoadLast(Object)
FileNew(Object, Object, Object, Object)
FileOpen(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, PjPoolOpen, Object, Object, Object, Object)
FileOpenEx(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, PjPoolOpen, Object, Object, Object, Object, Object)
FileOpenOrCreate(Object)
FileOpenUsingBackstage()
FilePageSetup(Object)
FilePageSetupCalendar(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
FilePageSetupCalendarText(Object, Object, Object, Object, Object, Object, Object, Object)
FilePageSetupCalendarTextEx(Object, Object, Object, Object, Object, Object, Object, Object)
FilePageSetupFooter(Object, PjAlignment, Object)
FilePageSetupHeader(Object, PjAlignment, Object)
FilePageSetupLegend(Object, Object, Object, PjAlignment, Object, Object, Object, Object, Object, Object, PjColor)
FilePageSetupLegendEx(Object, Object, Object, PjAlignment, Object, Object, Object, Object, Object, Object, Object)
FilePageSetupMargins(Object, Object, Object, Object, Object, Object)
FilePageSetupPage(Object, Object, Object, Object, Object, PjPaperSize, Object)
FilePageSetupView(Object, Object, Object, Object, Object, Object, Object, Object)
FilePrint(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
FilePrintPreview()
FilePrintSetup(Object)
FileProperties()
FileQuit(PjSaveType)
FileSave()
FileSaveAs(Object, PjFileFormat, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
FileSaveOffline(PjSaveType)
FileSaveWorkspace(Object)
FillAcross(Object)
FillDown(Object)
FilterApply(Object, Object, Object, Object)
FilterClear()
FilterEdit(String, Boolean, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
FilterNew(PjFilterViewType)
Filters()
FilterShowSummaryRows(Boolean)
Find(Object, Object, Object, Object, Object, Object, Object)
FindEx(Object, Object, Object, Object, Object, Object, Object, Object)
FindFile()
FindNext()
FindPrevious()
FixMe()
FollowHyperlink(Object, Object, Object, Object)
Font(Object, Object, Object, Object, Object, Object, Object)
Font32Ex(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
FontBold(Object)
FontEx(Object, Object, Object, Object, Object, Object, Object, Object, Object)
FontItalic(Object)
FontStrikethrough(Object)
FontUnderLine(Object)
Form(Object)
FormatCopy()
FormatPainter()
FormatPaste()
FormViewShow()
GanttBarEditEx(String, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
GanttBarFormat(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
GanttBarFormatEx(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
GanttBarLinks(PjGanttBarLink)
GanttBarSize(PjBarSize)
GanttBarStyleBaseline(Int16, Boolean)
GanttBarStyleCritical(Object)
GanttBarStyleDelete(String)
GanttBarStyleEdit(String, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
GanttBarStyleLate(Object)
GanttBarStyleSlack(Object)
GanttBarStyleSlippage(Int16, Boolean)
GanttBarTextDateFormat(PjDateFormat)
GanttChartWizard()
GanttRollup(Object, Object)
GanttShowBarSplits(Object)
GanttShowDrawings(Object)
GetCellInfo(Int32, Int32)
GetCurrentTheme()
GetProjectServerSettings(String, Object)
GetProjectServerSettingsEx()
GetProjectServerVersion(String)
GetRedoListCount()
GetRedoListItem(Int32)
GetThemedColor(PjThemeElement)
GetUndoListCount()
GetUndoListItem(Int32)
GoalAreaChange(Int16)
GoalAreaHighlight(Int32)
GoalAreaTaskHighlight(Int32)
GoToItemInVersions()
GotoNextOverAllocation()
GotoTaskDates()
Gridlines()
GridlinesEdit(PjGridline, Object, Object, Object, Object, Object)
GridlinesEditEx(PjGridline, Object, Object, Object, Object, Object)
GroupApply(Object)
GroupBy()
GroupClear()
GroupMaintainHierarchy(Boolean)
GroupNew()
Groups()
HelpAbout()
HelpAnswerWizard()
HelpContents()
HelpContextHelp()
HelpCreateYourProject()
HelpCueCards(Object, Object)
HelpLaunch(Object, Object, Object, Object)
HelpMSProjectFundamentals()
HelpOnlineIndex()
HelpQuickPreview()
HelpReference()
HelpSearch()
HelpTechnicalSupport()
HelpTopics()
HelpWhatsNew()
HighlightDrivenSuccessors(Object)
HighlightDrivingPredecessors(Object)
HighlightPredecessors(Object)
HighlightSuccessors(Object)
ImportCommitment(Object, Object)
ImportOutlookTasks()
ImportResourceList(Object)
InactivateTaskToggle(Object)
InformationDialog(Object)
InsertBlankRow()
InsertHyperlink(Object, Object, Object, Object)
InsertManualTask()
InsertMilestoneTask()
InsertNotes()
InsertResource(PjResourceTypes)
InsertScheduledTask()
InsertSummaryTask()
InsertTask()
IsCommandEnabled(String)
IsOfficeTaskPaneVisible()
IsOffline()
IsReducedFunctionalityMode()
IsUndoingOrRedoing()
IsURLTrusted(String)
Layout()
LayoutNow()
LayoutRelatedNow()
LayoutSelectionNow()
LevelingClear(Object)
LevelingOptions(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
LevelingOptionsEx(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
LevelNow(Object)
LevelSelected(PjLevelSelectedOption)
LinksBetweenProjects(Object)
LinkTasks()
LinkTasksEdit(Int32, Int32, Object, Object, Object, Object, Object)
LinkToTaskList(Object, Object)
LoadTasksFromServer(String, String, String, String, String, Int32)
LoadWebBrowserControl(String, Object)
LoadWebBrowserControlEx(String, Object, Object)
LoadWebPaneControl(String, Object)
LocaleID()
LookUpTableAdd(PjCustomField, Object, Object, Object)
LookUpTableAddEx(PjCustomField, Object, Object, Object, Object)
Macro(Object)
MacroSecurity()
MacroShowCode()
MacroShowVba()
MailLogoff()
MailLogon(Object, Object, Object)
MailOpen(Object)
MailPostDocument()
MailProjectMailCustomize(Object, Object, Object, Object, Object, Object, Object)
MailRoutingSlip(Object, Object, Object, Object, Object, Object, Object, Object)
MailSend(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
MailSendProjectMail(Object, Object, Object, Object, Object, Object, Object, Object, Object)
MailSendScheduleNote(Object, Object, Object, Object, Object, Object, Object, Object)
MailSession()
MailSystem()
MailUpdateProject(String)
MakeFieldEnterprise(Object, Object, Object)
MakeLocalCalendarEnterprise(Object, Object)
ManageSiteColumns()
MapEdit(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
MenuBarApply(String, Object, Object)
MenuBarEdit(Object, Object, Object, Object)
MenuBars()
Message(String, PjMessageType, Object, Object)
NewTasksStartOn(PjNewTasksStartOnDate)
ObjectChangeIcon()
ObjectConvert()
ObjectInsert()
ObjectLinks()
ObjectVerb(Object)
ODBCCreateDataSource()
ODBCManageDataSources()
OfficeOnTheWeb()
OfficeTaskPaneHide()
OpenBrowser(Object)
OpenFromSharePoint(Object, Object)
OpenServerPage(PjServerPage)
OpenUndoTransaction(String, Object)
OptionsCalculation(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
OptionsCalendar(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
OptionsEdit(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
OptionsEditEx(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
OptionsGeneral(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
OptionsGeneralEx(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
OptionsInterface(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
OptionsInterfaceEx(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
OptionsPreferences()
OptionsSave(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
OptionsSchedule(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
OptionsSecurity(Object)
OptionsSecurityEx(Object, Object, Object)
OptionsSecurityTab(PjOptionsSecurityTab)
OptionsSpelling(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
OptionsView(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
OptionsViewEx(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
OptionsWorkgroup(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
Organizer(PjOrganizer, Object)
OrganizerDeleteItem(Object, Object, Object, Object)
OrganizerMoveItem(Object, Object, Object, Object, Object)
OrganizerRenameItem(Object, Object, Object, Object, Object)
OutlineHideSubTasks()
OutlineIndent(Object)
OutlineOutdent(Object)
OutlineShowAllTasks()
OutlineShowSubTasks()
OutlineShowTasks(PJTaskOutlineShowLevel, Object)
OutlineSymbolsToggle(Object)
PageBreakRemove()
PageBreakSet()
PageBreaksRemoveAll()
PageBreaksShow(Object)
PaneClose()
PaneCreate()
PaneNext()
PanZoomPanTo(Object)
PanZoomZoomTo(Object, Object)
PasteAsPicture()
PasteDestFormatting()
PasteSourceFormatting()
PERTBorders(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
PERTBoxStyles(Object, Object, Object, Object, Object, Object, Object, Object, Object)
PERTLayout(Object, Object, Object, Object)
PERTSetTask(Object, Object, Object, Object, Object)
ProgressLines()
ProjectCheckOut(Object)
ProjectMove(Object, Object)
ProjectStatistics(Object)
ProjectSummaryInfo(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
Publish(Object, Object)
PublishAllInformation()
PublisherOptions(Object, Object, Object, Object, Object, Object, Object)
PublishNewAndChangedAssignments(Boolean, PjPublishScope, Boolean, Object)
PublishProjectPlan(Boolean, Boolean)
Quit(PjSaveType)
ReassignSelectedAssns(Object)
RecurringTaskInsert()
Redo(Int32)
RegisterProject(Boolean)
ReminderSet(Object, Object)
RemoveHighlight()
RenameReport()
Replace(Object, Object, Object, Object, Object, Object, Object, Object, Object)
ReplaceEx(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
ReplanAssignments(Object)
ReportPrint(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
ReportPrintPreview(Object)
Reports()
ReportsDialog()
RepublishAssignments(Boolean, PjPublishScope, Boolean, Boolean, Boolean, Object)
RequestProgressInformation(Boolean, PjPublishScope, Boolean, Object, Object, Object)
RescheduleToNextAvailable(Object)
ResetTPStyle(PjTeamPlannerStyle)
ResetTrackingMethod()
ResourceActiveDirectory()
ResourceAddressBook()
ResourceAssignment(Object, PjResAssignOperation, Object)
ResourceAssignmentDialog(Object, PjAssignResourcesListFields, Object, Object, Object, Object)
ResourceCalendarEditDays(String, String, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
ResourceCalendarReset(String, String, Object)
ResourceCalendars(Object, Object)
ResourceComparison()
ResourceDetails(Object)
ResourceGraphBarStyles(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
ResourceGraphBarStylesEx(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
ResourceMappingDialog()
ResourceSharing(Object, Object, Object)
ResourceSharingPoolAction(PjPoolAction, Object, Object)
ResourceSharingPoolRefresh()
ResourceSharingPoolUpdate(Object)
ResourceWindowsAccount(Object, Object)
RestoreSheetSelection()
RowClear()
RowDelete()
RowInsert()
Run(String, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
SaveForSharing(Object)
SaveProjectIfDirty(String)
SaveSheetSelection()
SchedulePlusReminderSet(Object, Object)
SearchFiles()
SegmentBorderColor(Int32)
SegmentFillColor(Int32)
SelectAll()
SelectBeginning(Object)
SelectCell(Object, Object, Object)
SelectCellDown(Object, Object)
SelectCellLeft(Object, Object)
SelectCellRight(Object, Object)
SelectCellUp(Object, Object)
SelectColumn(Object, Object, Object, Object)
SelectEnd(Object)
SelectionExtend(Object, Object)
SelectRange(Int32, Int16, Object, Object, Object, Object, Object)
SelectResourceCell(Object, Object, Object)
SelectResourceColumn(Object, Object, Object, Object)
SelectResourceField(Int32, String, Object, Object, Object, Object, Object)
SelectRow(Object, Object, Object, Object, Object)
SelectRowEnd(Object)
SelectRowStart(Object)
SelectSheet()
SelectTable()
SelectTaskAssns()
SelectTaskCell(Object, Object, Object)
SelectTaskColumn(Object, Object, Object, Object)
SelectTaskField(Int32, String, Object, Object, Object, Object, Object)
SelectTimescaleRange(Int32, String, Int16, Int32)
SelectToEnd()
SelectTPLineHeight(Int16)
SelectTPTask(Object)
ServiceOptionsDialog()
SetActiveCell(String, Object)
SetAutoFilter(Object, PjAutoFilterType, Object, Object, Object, Object, Object)
SetField(String, String, Object)
SetIgnoreWarningsForTask(Object)
SetLTRTable()
SetMatchingField(String, String, String, String, Object, Object, Object, Object, Object)
SetResourceField(String, String, Object, Object, Object, Object)
SetResourceFieldByID(PjField, String, Object, Object, Object, Object)
SetRowHeight(Object, Object, Object)
SetRTLTable()
SetShowTaskSuggestions(Object)
SetShowTaskWarnings(Object)
SetSidepaneStateButton(Boolean)
SetSplitBar(Object)
SetTaskField(String, String, Object, Object, Object, Object)
SetTaskFieldByID(PjField, String, Object, Object, Object, Object)
SetTaskMode(Object, Object)
SetTitleRowHeight(Object)
SetTPField(String, String, Object, Object, Object, Object)
ShareProjectOnline()
ShowAddNewColumn(Object)
ShowIgnoredTaskWarnings()
ShowOSFTaskPane(Object)
ShowReportDataPane(Object)
SidepaneTaskChange(Int16, Object)
SidepaneToggle(Object)
Sort(Object, Object, Object, Object, Object, Object, Object, Object)
SpellCheckField(PjSpellingField, Object)
SpellingCheck()
SplitTask(Object)
StopWebBrowserControlNavigation()
SubscriberOptions(Object, Object, Object, Object, Object, Object)
SubscribeTo(Object, PjSubscribeFormat)
SummaryResourceAssignmentsRefresh()
SummaryTasksShow(Object)
SynchronizeWithSite(Object, Object)
Table()
TableApply(Object)
TableCopy(Object)
TableEdit(String, Boolean, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
TableEditEx(String, Boolean, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
TableReset()
Tables()
TaskComparison()
TaskDeliverableCreate(Object)
TaskDeliverableSync()
TaskDependencySync()
TaskDrivers()
TaskInspector()
TaskMove(Object, Object, Object)
TaskMoveToStatusDate(Object, Object)
TaskOnTimeline(Object, Object, Object, Object)
TaskRespectLinks()
TextStyles(Object, Object, Object, Object, Object, Object, Object)
TextStyles32Ex(Object, Object, Object, Object, Object, Object, Object, Object, Object)
TextStylesEx(Object, Object, Object, Object, Object, Object, Object, Object, Object)
TimelineExport(Object, Object)
TimelineFormat(Object, Object)
TimelineGotoSelectedTask()
TimelineInsertTask(PjTimelineInsertTaskType)
TimelineShowHide(PjTimelineShowHide, Object)
TimelineTextOnBar(Object)
TimelineViewToggle()
Timescale()
TimescaledData(Int32, Int32, Object, Object, PjTimescaledData, PjTimescaleUnit, Object)
TimescaleEdit(Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object)
TimescaleNonWorking(Object, Object, Object, Object)
TimescaleNonWorkingEx(Object, Object, Object, Object)
TipOfTheDay()
ToggleAssignments()
ToggleChangeHighlighting()
TogglePreventResOveralloc()
ToggleResourceDetails()
ToggleTaskDetails()
ToggleTPAutoExpand()
ToggleTPResourceExpand(Object)
ToggleTPUnassigned()
ToggleTPUnscheduled()
ToolbarCopyToolFace(String, Int16)
ToolbarCustomizeTool(Object, Object, Object, Object, Object, Object)
ToolbarDeleteTool(String, Int16)
ToolbarInsertTool(String, Int16, Object, Object, Object, Object)
ToolbarPasteToolFace(String, Int16)
Toolbars(Object, Object, Object)
ToolbarsCustomize()
Undo(Int32)
UndoClear()
UnlinkTasks()
UnloadWebBrowserControl(Object)
UpdateFromProjectServer(String)
UpdateProject(Object, Object, Object)
UpdateProjectToWeb(Object, Object, Object, Object)
UpdateTasks(Object, Object, Object, Object, Object, Object)
UsageViewEntryEx(Object, Object, Object, Object, Object, Object, Object, Object)
ValidateEnterpriseFormula(Int32, String, Boolean)
ValidateGraphicalIndicators(Int32, String, Boolean)
ViewApply(Object, Object, Object)
ViewApplyEx(Object, Object, Object, Object, PjViewType)
ViewBar()
ViewCopy(Object, Object)
ViewEditCombination(Object, Object, Object, Object, Object, Object)
ViewEditSingle(Object, Object, Object, Object, Object, Object, Object, Object, Object)
ViewReset()
Views()
ViewsEx(Object)
ViewShowAvailability()
ViewShowCost()
ViewShowCumulativeCost()
ViewShowCumulativeWork()
ViewShowNotes()
ViewShowObjects()
ViewShowOverallocation()
ViewShowPeakUnits()
ViewShowPercentAllocation()
ViewShowPredecessorsSuccessors()
ViewShowRemainingAvailability()
ViewShowResourcesPredecessors()
ViewShowResourcesSuccessors()
ViewShowSchedule()
ViewShowSelectedTasks(Object)
ViewShowUnitAvailability()
ViewShowWork()
ViewShowWorkAvailability()
VisualReports(PjVisualReportsTab)
VisualReportsEdit(Object, PjVisualReportsDataLevel)
VisualReportsNewTemplate(PjVisualReportsTemplateType, PjVisualReportsCubeType, Object, PjVisualReportsDataLevel)
VisualReportsSaveCube(Object, PjVisualReportsCubeType, Object, PjVisualReportsDataLevel)
VisualReportsSaveDatabase(Object, PjVisualReportsDataLevel)
VisualReportsView(Object, PjVisualReportsDataLevel)
WBSCodeMaskEdit(Object, Object, PjWBSSequence, Object, Object, Object, Object)
WBSCodeRenumber(Object)
WebAddToFavorites(Object)
WebCopyHyperlink()
WebGoBack()
WebGoForward()
WebHelp(Object)
WebHideToolbars(Object)
WebInbox()
WebOpenFavorites()
WebOpenHyperlink(Object, Object, Object, Object)
WebOpenSearchPage()
WebOpenStartPage()
WebRefresh()
WebSetSearchPage(Object)
WebSetStartPage(Object)
WebStopLoading()
WebToolbar(Object)
WindowActivate(Object, Object, Object)
WindowArrangeAll()
WindowHide(Object)
WindowMoreWindows()
WindowNewWindow(Object, Object, Object, Object)
WindowNext(Object)
WindowPrev(Object)
WindowSplit()
WindowUnhide(Object)
WorkOffline(Object)
WrapText(Object)
Zoom()
ZoomCalendar(Object, Object, Object)
ZoomIn()
ZoomOut()
ZoomReport(Object, Object)
ZoomTimescale(Object, Object, Object, Object)

Applies to