3.2.6.7 Abort an Enhanced CIM Operation

A higher layer MAY abort a CIM operation that takes advantage of enhanced semantics. To abort an enhanced CIM operation, the client MUST perform the following steps:

  1. Send a Cancel message over the secondary connection, with the following values:

    • OperationID set to the OperationID value of the operation.

  2. Send an EmptyXmlMessage over the secondary connection, with the following values:

    • Action set to "http://schemas.microsoft.com/wbem/wsman/1/wsman/End".

    • OperationID set to the OperationID value of the operation.

    • ResourceURI set to "http://schemas.microsoft.com/wbem/wsman/1/wsman/FullDuplex".

  3. Release all resources associated with the operation.

  4. Delete the row.