Checklist: Testing Operational Readiness
Testing for operational readiness is a vital procedure that is often overlooked or is performed only minimally. Thorough testing is a critical requirement of any enterprise-level application, and a solution developed using BizTalk Server is no exception. At a minimum, you should perform the following testing before moving a BizTalk solution into production:
Steps | Reference |
---|---|
Unit testing | Performing Unit Testing |
Functional testing | Performing Functional Testing |
Bottleneck testing and tuning | Performing Bottleneck Testing and Tuning |
Load and maximum sustainable throughput (MST) testing | Performing Load and Throughput Testing |
Availability testing: - Test individual hardware component failure. - Test BizTalk Server failure. - Test cluster node failover. - Test recovery of BizTalk Server databases using SQL Server log shipping. |
Performing Availability Testing |