PjAssignmentField Enum
Definition
Important
Some information relates to prerelease product that may be substantially modified before it’s released. Microsoft makes no warranties, express or implied, with respect to the information provided here.
public enum class PjAssignmentField
[System.Runtime.InteropServices.Guid("6CC0AB34-3931-11D2-AE4C-00C04FB6F701")]
public enum PjAssignmentField
type PjAssignmentField =
Public Enum PjAssignmentField
- Inheritance
-
PjAssignmentField
- Attributes
Fields
pjAssignmentActualCost | 255852572 | |
pjAssignmentActualFinish | 255852567 | |
pjAssignmentActualOvertimeCost | 255852574 | |
pjAssignmentActualOvertimeWork | 255852557 | |
pjAssignmentActualOvtWorkProtected | 255853175 | |
pjAssignmentActualStart | 255852566 | |
pjAssignmentActualWork | 255852554 | |
pjAssignmentActualWorkProtected | 255853174 | |
pjAssignmentACWP | 255852580 | |
pjAssignmentAssignmentUnits | 255852551 | |
pjAssignmentBaseline10BudgetCost | 255853258 | |
pjAssignmentBaseline10BudgetWork | 255853257 | |
pjAssignmentBaseline10Cost | 255852915 | |
pjAssignmentBaseline10Finish | 255852921 | |
pjAssignmentBaseline10Start | 255852920 | |
pjAssignmentBaseline10Work | 255852914 | |
pjAssignmentBaseline1BudgetCost | 255853222 | |
pjAssignmentBaseline1BudgetWork | 255853221 | |
pjAssignmentBaseline1Cost | 255852834 | |
pjAssignmentBaseline1Finish | 255852840 | |
pjAssignmentBaseline1Start | 255852839 | |
pjAssignmentBaseline1Work | 255852833 | |
pjAssignmentBaseline2BudgetCost | 255853226 | |
pjAssignmentBaseline2BudgetWork | 255853225 | |
pjAssignmentBaseline2Cost | 255852843 | |
pjAssignmentBaseline2Finish | 255852849 | |
pjAssignmentBaseline2Start | 255852848 | |
pjAssignmentBaseline2Work | 255852842 | |
pjAssignmentBaseline3BudgetCost | 255853230 | |
pjAssignmentBaseline3BudgetWork | 255853229 | |
pjAssignmentBaseline3Cost | 255852852 | |
pjAssignmentBaseline3Finish | 255852858 | |
pjAssignmentBaseline3Start | 255852857 | |
pjAssignmentBaseline3Work | 255852851 | |
pjAssignmentBaseline4BudgetCost | 255853234 | |
pjAssignmentBaseline4BudgetWork | 255853233 | |
pjAssignmentBaseline4Cost | 255852861 | |
pjAssignmentBaseline4Finish | 255852867 | |
pjAssignmentBaseline4Start | 255852866 | |
pjAssignmentBaseline4Work | 255852860 | |
pjAssignmentBaseline5BudgetCost | 255853238 | |
pjAssignmentBaseline5BudgetWork | 255853237 | |
pjAssignmentBaseline5Cost | 255852870 | |
pjAssignmentBaseline5Finish | 255852876 | |
pjAssignmentBaseline5Start | 255852875 | |
pjAssignmentBaseline5Work | 255852869 | |
pjAssignmentBaseline6BudgetCost | 255853242 | |
pjAssignmentBaseline6BudgetWork | 255853241 | |
pjAssignmentBaseline6Cost | 255852879 | |
pjAssignmentBaseline6Finish | 255852885 | |
pjAssignmentBaseline6Start | 255852884 | |
pjAssignmentBaseline6Work | 255852878 | |
pjAssignmentBaseline7BudgetCost | 255853246 | |
pjAssignmentBaseline7BudgetWork | 255853245 | |
pjAssignmentBaseline7Cost | 255852888 | |
pjAssignmentBaseline7Finish | 255852894 | |
pjAssignmentBaseline7Start | 255852893 | |
pjAssignmentBaseline7Work | 255852887 | |
pjAssignmentBaseline8BudgetCost | 255853250 | |
pjAssignmentBaseline8BudgetWork | 255853249 | |
pjAssignmentBaseline8Cost | 255852897 | |
pjAssignmentBaseline8Finish | 255852903 | |
pjAssignmentBaseline8Start | 255852902 | |
pjAssignmentBaseline8Work | 255852896 | |
pjAssignmentBaseline9BudgetCost | 255853254 | |
pjAssignmentBaseline9BudgetWork | 255853253 | |
pjAssignmentBaseline9Cost | 255852906 | |
pjAssignmentBaseline9Finish | 255852912 | |
pjAssignmentBaseline9Start | 255852911 | |
pjAssignmentBaseline9Work | 255852905 | |
pjAssignmentBaselineBudgetCost | 255853218 | |
pjAssignmentBaselineBudgetWork | 255853217 | |
pjAssignmentBaselineCost | 255852576 | |
pjAssignmentBaselineFinish | 255852691 | |
pjAssignmentBaselineStart | 255852690 | |
pjAssignmentBaselineWork | 255852560 | |
pjAssignmentBCWP | 255852579 | |
pjAssignmentBCWS | 255852578 | |
pjAssignmentBudgetCost | 255853214 | |
pjAssignmentBudgetWork | 255853213 | |
pjAssignmentConfirmed | 255852616 | |
pjAssignmentCost | 255852570 | |
pjAssignmentCost1 | 255852663 | |
pjAssignmentCost10 | 255852709 | |
pjAssignmentCost2 | 255852664 | |
pjAssignmentCost3 | 255852665 | |
pjAssignmentCost4 | 255852703 | |
pjAssignmentCost5 | 255852704 | |
pjAssignmentCost6 | 255852705 | |
pjAssignmentCost7 | 255852706 | |
pjAssignmentCost8 | 255852707 | |
pjAssignmentCost9 | 255852708 | |
pjAssignmentCostRateTable | 255852624 | |
pjAssignmentCostVariance | 255852582 | |
pjAssignmentCreated | 255853178 | |
pjAssignmentCV | 255852791 | |
pjAssignmentDate1 | 255852710 | |
pjAssignmentDate10 | 255852719 | |
pjAssignmentDate2 | 255852711 | |
pjAssignmentDate3 | 255852712 | |
pjAssignmentDate4 | 255852713 | |
pjAssignmentDate5 | 255852714 | |
pjAssignmentDate6 | 255852715 | |
pjAssignmentDate7 | 255852716 | |
pjAssignmentDate8 | 255852717 | |
pjAssignmentDate9 | 255852718 | |
pjAssignmentDelay | 255852569 | |
pjAssignmentDuration1 | 255852657 | |
pjAssignmentDuration10 | 255852726 | |
pjAssignmentDuration2 | 255852658 | |
pjAssignmentDuration3 | 255852659 | |
pjAssignmentDuration4 | 255852720 | |
pjAssignmentDuration5 | 255852721 | |
pjAssignmentDuration6 | 255852722 | |
pjAssignmentDuration7 | 255852723 | |
pjAssignmentDuration8 | 255852724 | |
pjAssignmentDuration9 | 255852725 | |
pjAssignmentEnterpriseCost1 | 255852925 | |
pjAssignmentEnterpriseCost10 | 255852934 | |
pjAssignmentEnterpriseCost2 | 255852926 | |
pjAssignmentEnterpriseCost3 | 255852927 | |
pjAssignmentEnterpriseCost4 | 255852928 | |
pjAssignmentEnterpriseCost5 | 255852929 | |
pjAssignmentEnterpriseCost6 | 255852930 | |
pjAssignmentEnterpriseCost7 | 255852931 | |
pjAssignmentEnterpriseCost8 | 255852932 | |
pjAssignmentEnterpriseCost9 | 255852933 | |
pjAssignmentEnterpriseDate1 | 255852935 | |
pjAssignmentEnterpriseDate10 | 255852944 | |
pjAssignmentEnterpriseDate11 | 255852945 | |
pjAssignmentEnterpriseDate12 | 255852946 | |
pjAssignmentEnterpriseDate13 | 255852947 | |
pjAssignmentEnterpriseDate14 | 255852948 | |
pjAssignmentEnterpriseDate15 | 255852949 | |
pjAssignmentEnterpriseDate16 | 255852950 | |
pjAssignmentEnterpriseDate17 | 255852951 | |
pjAssignmentEnterpriseDate18 | 255852952 | |
pjAssignmentEnterpriseDate19 | 255852953 | |
pjAssignmentEnterpriseDate2 | 255852936 | |
pjAssignmentEnterpriseDate20 | 255852954 | |
pjAssignmentEnterpriseDate21 | 255852955 | |
pjAssignmentEnterpriseDate22 | 255852956 | |
pjAssignmentEnterpriseDate23 | 255852957 | |
pjAssignmentEnterpriseDate24 | 255852958 | |
pjAssignmentEnterpriseDate25 | 255852959 | |
pjAssignmentEnterpriseDate26 | 255852960 | |
pjAssignmentEnterpriseDate27 | 255852961 | |
pjAssignmentEnterpriseDate28 | 255852962 | |
pjAssignmentEnterpriseDate29 | 255852963 | |
pjAssignmentEnterpriseDate3 | 255852937 | |
pjAssignmentEnterpriseDate30 | 255852964 | |
pjAssignmentEnterpriseDate4 | 255852938 | |
pjAssignmentEnterpriseDate5 | 255852939 | |
pjAssignmentEnterpriseDate6 | 255852940 | |
pjAssignmentEnterpriseDate7 | 255852941 | |
pjAssignmentEnterpriseDate8 | 255852942 | |
pjAssignmentEnterpriseDate9 | 255852943 | |
pjAssignmentEnterpriseDuration1 | 255852965 | |
pjAssignmentEnterpriseDuration10 | 255852974 | |
pjAssignmentEnterpriseDuration2 | 255852966 | |
pjAssignmentEnterpriseDuration3 | 255852967 | |
pjAssignmentEnterpriseDuration4 | 255852968 | |
pjAssignmentEnterpriseDuration5 | 255852969 | |
pjAssignmentEnterpriseDuration6 | 255852970 | |
pjAssignmentEnterpriseDuration7 | 255852971 | |
pjAssignmentEnterpriseDuration8 | 255852972 | |
pjAssignmentEnterpriseDuration9 | 255852973 | |
pjAssignmentEnterpriseFlag1 | 255852985 | |
pjAssignmentEnterpriseFlag10 | 255852994 | |
pjAssignmentEnterpriseFlag11 | 255852995 | |
pjAssignmentEnterpriseFlag12 | 255852996 | |
pjAssignmentEnterpriseFlag13 | 255852997 | |
pjAssignmentEnterpriseFlag14 | 255852998 | |
pjAssignmentEnterpriseFlag15 | 255852999 | |
pjAssignmentEnterpriseFlag16 | 255853000 | |
pjAssignmentEnterpriseFlag17 | 255853001 | |
pjAssignmentEnterpriseFlag18 | 255853002 | |
pjAssignmentEnterpriseFlag19 | 255853003 | |
pjAssignmentEnterpriseFlag2 | 255852986 | |
pjAssignmentEnterpriseFlag20 | 255853004 | |
pjAssignmentEnterpriseFlag3 | 255852987 | |
pjAssignmentEnterpriseFlag4 | 255852988 | |
pjAssignmentEnterpriseFlag5 | 255852989 | |
pjAssignmentEnterpriseFlag6 | 255852990 | |
pjAssignmentEnterpriseFlag7 | 255852991 | |
pjAssignmentEnterpriseFlag8 | 255852992 | |
pjAssignmentEnterpriseFlag9 | 255852993 | |
pjAssignmentEnterpriseNumber1 | 255853005 | |
pjAssignmentEnterpriseNumber10 | 255853014 | |
pjAssignmentEnterpriseNumber11 | 255853015 | |
pjAssignmentEnterpriseNumber12 | 255853016 | |
pjAssignmentEnterpriseNumber13 | 255853017 | |
pjAssignmentEnterpriseNumber14 | 255853018 | |
pjAssignmentEnterpriseNumber15 | 255853019 | |
pjAssignmentEnterpriseNumber16 | 255853020 | |
pjAssignmentEnterpriseNumber17 | 255853021 | |
pjAssignmentEnterpriseNumber18 | 255853022 | |
pjAssignmentEnterpriseNumber19 | 255853023 | |
pjAssignmentEnterpriseNumber2 | 255853006 | |
pjAssignmentEnterpriseNumber20 | 255853024 | |
pjAssignmentEnterpriseNumber21 | 255853025 | |
pjAssignmentEnterpriseNumber22 | 255853026 | |
pjAssignmentEnterpriseNumber23 | 255853027 | |
pjAssignmentEnterpriseNumber24 | 255853028 | |
pjAssignmentEnterpriseNumber25 | 255853029 | |
pjAssignmentEnterpriseNumber26 | 255853030 | |
pjAssignmentEnterpriseNumber27 | 255853031 | |
pjAssignmentEnterpriseNumber28 | 255853032 | |
pjAssignmentEnterpriseNumber29 | 255853033 | |
pjAssignmentEnterpriseNumber3 | 255853007 | |
pjAssignmentEnterpriseNumber30 | 255853034 | |
pjAssignmentEnterpriseNumber31 | 255853035 | |
pjAssignmentEnterpriseNumber32 | 255853036 | |
pjAssignmentEnterpriseNumber33 | 255853037 | |
pjAssignmentEnterpriseNumber34 | 255853038 | |
pjAssignmentEnterpriseNumber35 | 255853039 | |
pjAssignmentEnterpriseNumber36 | 255853040 | |
pjAssignmentEnterpriseNumber37 | 255853041 | |
pjAssignmentEnterpriseNumber38 | 255853042 | |
pjAssignmentEnterpriseNumber39 | 255853043 | |
pjAssignmentEnterpriseNumber4 | 255853008 | |
pjAssignmentEnterpriseNumber40 | 255853044 | |
pjAssignmentEnterpriseNumber5 | 255853009 | |
pjAssignmentEnterpriseNumber6 | 255853010 | |
pjAssignmentEnterpriseNumber7 | 255853011 | |
pjAssignmentEnterpriseNumber8 | 255853012 | |
pjAssignmentEnterpriseNumber9 | 255853013 | |
pjAssignmentEnterpriseResourceMultiValue20 | 255853154 | |
pjAssignmentEnterpriseResourceMultiValue21 | 255853156 | |
pjAssignmentEnterpriseResourceMultiValue22 | 255853158 | |
pjAssignmentEnterpriseResourceMultiValue23 | 255853160 | |
pjAssignmentEnterpriseResourceMultiValue24 | 255853162 | |
pjAssignmentEnterpriseResourceMultiValue25 | 255853164 | |
pjAssignmentEnterpriseResourceMultiValue26 | 255853166 | |
pjAssignmentEnterpriseResourceMultiValue27 | 255853168 | |
pjAssignmentEnterpriseResourceMultiValue28 | 255853170 | |
pjAssignmentEnterpriseResourceMultiValue29 | 255853172 | |
pjAssignmentEnterpriseResourceOutlineCode1 | 255853089 | |
pjAssignmentEnterpriseResourceOutlineCode10 | 255853098 | |
pjAssignmentEnterpriseResourceOutlineCode11 | 255853099 | |
pjAssignmentEnterpriseResourceOutlineCode12 | 255853100 | |
pjAssignmentEnterpriseResourceOutlineCode13 | 255853101 | |
pjAssignmentEnterpriseResourceOutlineCode14 | 255853102 | |
pjAssignmentEnterpriseResourceOutlineCode15 | 255853103 | |
pjAssignmentEnterpriseResourceOutlineCode16 | 255853104 | |
pjAssignmentEnterpriseResourceOutlineCode17 | 255853105 | |
pjAssignmentEnterpriseResourceOutlineCode18 | 255853106 | |
pjAssignmentEnterpriseResourceOutlineCode19 | 255853107 | |
pjAssignmentEnterpriseResourceOutlineCode2 | 255853090 | |
pjAssignmentEnterpriseResourceOutlineCode20 | 255853108 | |
pjAssignmentEnterpriseResourceOutlineCode21 | 255853109 | |
pjAssignmentEnterpriseResourceOutlineCode22 | 255853110 | |
pjAssignmentEnterpriseResourceOutlineCode23 | 255853111 | |
pjAssignmentEnterpriseResourceOutlineCode24 | 255853112 | |
pjAssignmentEnterpriseResourceOutlineCode25 | 255853113 | |
pjAssignmentEnterpriseResourceOutlineCode26 | 255853114 | |
pjAssignmentEnterpriseResourceOutlineCode27 | 255853115 | |
pjAssignmentEnterpriseResourceOutlineCode28 | 255853116 | |
pjAssignmentEnterpriseResourceOutlineCode29 | 255853117 | |
pjAssignmentEnterpriseResourceOutlineCode3 | 255853091 | |
pjAssignmentEnterpriseResourceOutlineCode4 | 255853092 | |
pjAssignmentEnterpriseResourceOutlineCode5 | 255853093 | |
pjAssignmentEnterpriseResourceOutlineCode6 | 255853094 | |
pjAssignmentEnterpriseResourceOutlineCode7 | 255853095 | |
pjAssignmentEnterpriseResourceOutlineCode8 | 255853096 | |
pjAssignmentEnterpriseResourceOutlineCode9 | 255853097 | |
pjAssignmentEnterpriseResourceRBS | 255853118 | |
pjAssignmentEnterpriseTeamMember | 255853151 | |
pjAssignmentEnterpriseText1 | 255853045 | |
pjAssignmentEnterpriseText10 | 255853054 | |
pjAssignmentEnterpriseText11 | 255853055 | |
pjAssignmentEnterpriseText12 | 255853056 | |
pjAssignmentEnterpriseText13 | 255853057 | |
pjAssignmentEnterpriseText14 | 255853058 | |
pjAssignmentEnterpriseText15 | 255853059 | |
pjAssignmentEnterpriseText16 | 255853060 | |
pjAssignmentEnterpriseText17 | 255853061 | |
pjAssignmentEnterpriseText18 | 255853062 | |
pjAssignmentEnterpriseText19 | 255853063 | |
pjAssignmentEnterpriseText2 | 255853046 | |
pjAssignmentEnterpriseText20 | 255853064 | |
pjAssignmentEnterpriseText21 | 255853065 | |
pjAssignmentEnterpriseText22 | 255853066 | |
pjAssignmentEnterpriseText23 | 255853067 | |
pjAssignmentEnterpriseText24 | 255853068 | |
pjAssignmentEnterpriseText25 | 255853069 | |
pjAssignmentEnterpriseText26 | 255853070 | |
pjAssignmentEnterpriseText27 | 255853071 | |
pjAssignmentEnterpriseText28 | 255853072 | |
pjAssignmentEnterpriseText29 | 255853073 | |
pjAssignmentEnterpriseText3 | 255853047 | |
pjAssignmentEnterpriseText30 | 255853074 | |
pjAssignmentEnterpriseText31 | 255853075 | |
pjAssignmentEnterpriseText32 | 255853076 | |
pjAssignmentEnterpriseText33 | 255853077 | |
pjAssignmentEnterpriseText34 | 255853078 | |
pjAssignmentEnterpriseText35 | 255853079 | |
pjAssignmentEnterpriseText36 | 255853080 | |
pjAssignmentEnterpriseText37 | 255853081 | |
pjAssignmentEnterpriseText38 | 255853082 | |
pjAssignmentEnterpriseText39 | 255853083 | |
pjAssignmentEnterpriseText4 | 255853048 | |
pjAssignmentEnterpriseText40 | 255853084 | |
pjAssignmentEnterpriseText5 | 255853049 | |
pjAssignmentEnterpriseText6 | 255853050 | |
pjAssignmentEnterpriseText7 | 255853051 | |
pjAssignmentEnterpriseText8 | 255853052 | |
pjAssignmentEnterpriseText9 | 255853053 | |
pjAssignmentFinish | 255852565 | |
pjAssignmentFinish1 | 255852647 | |
pjAssignmentFinish10 | 255852731 | |
pjAssignmentFinish2 | 255852648 | |
pjAssignmentFinish3 | 255852649 | |
pjAssignmentFinish4 | 255852650 | |
pjAssignmentFinish5 | 255852651 | |
pjAssignmentFinish6 | 255852727 | |
pjAssignmentFinish7 | 255852728 | |
pjAssignmentFinish8 | 255852729 | |
pjAssignmentFinish9 | 255852730 | |
pjAssignmentFinishVariance | 255852807 | |
pjAssignmentFixedMaterialAssignment | 255852819 | |
pjAssignmentFlag1 | 255852667 | |
pjAssignmentFlag10 | 255852666 | |
pjAssignmentFlag11 | 255852732 | |
pjAssignmentFlag12 | 255852733 | |
pjAssignmentFlag13 | 255852734 | |
pjAssignmentFlag14 | 255852735 | |
pjAssignmentFlag15 | 255852736 | |
pjAssignmentFlag16 | 255852737 | |
pjAssignmentFlag17 | 255852738 | |
pjAssignmentFlag18 | 255852739 | |
pjAssignmentFlag19 | 255852740 | |
pjAssignmentFlag2 | 255852668 | |
pjAssignmentFlag20 | 255852741 | |
pjAssignmentFlag3 | 255852669 | |
pjAssignmentFlag4 | 255852670 | |
pjAssignmentFlag5 | 255852671 | |
pjAssignmentFlag6 | 255852672 | |
pjAssignmentFlag7 | 255852673 | |
pjAssignmentFlag8 | 255852674 | |
pjAssignmentFlag9 | 255852675 | |
pjAssignmentGuid | 255853180 | |
pjAssignmentHyperlink | 255852696 | |
pjAssignmentHyperlinkAddress | 255852697 | |
pjAssignmentHyperlinkHREF | 255852699 | |
pjAssignmentHyperlinkScreenTip | 255852823 | |
pjAssignmentHyperlinkSubAddress | 255852698 | |
pjAssignmentIndex | 255852790 | |
pjAssignmentLevelingDelay | 255852689 | |
pjAssignmentLinkedFields | 255852676 | |
pjAssignmentNotes | 255852615 | |
pjAssignmentNumber1 | 255852652 | |
pjAssignmentNumber10 | 255852746 | |
pjAssignmentNumber11 | 255852747 | |
pjAssignmentNumber12 | 255852748 | |
pjAssignmentNumber13 | 255852749 | |
pjAssignmentNumber14 | 255852750 | |
pjAssignmentNumber15 | 255852751 | |
pjAssignmentNumber16 | 255852752 | |
pjAssignmentNumber17 | 255852753 | |
pjAssignmentNumber18 | 255852754 | |
pjAssignmentNumber19 | 255852755 | |
pjAssignmentNumber2 | 255852653 | |
pjAssignmentNumber20 | 255852756 | |
pjAssignmentNumber3 | 255852654 | |
pjAssignmentNumber4 | 255852655 | |
pjAssignmentNumber5 | 255852656 | |
pjAssignmentNumber6 | 255852742 | |
pjAssignmentNumber7 | 255852743 | |
pjAssignmentNumber8 | 255852744 | |
pjAssignmentNumber9 | 255852745 | |
pjAssignmentOverallocated | 255852679 | |
pjAssignmentOvertimeCost | 255852571 | |
pjAssignmentOvertimeWork | 255852553 | |
pjAssignmentOwner | 255853212 | |
pjAssignmentPeak | 255852563 | |
pjAssignmentPercentWorkComplete | 255852587 | |
pjAssignmentProject | 255852588 | |
pjAssignmentRegularWork | 255852555 | |
pjAssignmentRemainingCost | 255852573 | |
pjAssignmentRemainingOvertimeCost | 255852575 | |
pjAssignmentRemainingOvertimeWork | 255852558 | |
pjAssignmentRemainingWork | 255852556 | |
pjAssignmentResourceGuid | 255853182 | |
pjAssignmentResourceID | 255852548 | |
pjAssignmentResourceName | 255852550 | |
pjAssignmentResourceRequestType | 255853149 | |
pjAssignmentResourceType | 255852820 | |
pjAssignmentResourceUniqueID | 255852546 | |
pjAssignmentResponsePending | 255852617 | |
pjAssignmentStart | 255852564 | |
pjAssignmentStart1 | 255852642 | |
pjAssignmentStart10 | 255852761 | |
pjAssignmentStart2 | 255852643 | |
pjAssignmentStart3 | 255852644 | |
pjAssignmentStart4 | 255852645 | |
pjAssignmentStart5 | 255852646 | |
pjAssignmentStart6 | 255852757 | |
pjAssignmentStart7 | 255852758 | |
pjAssignmentStart8 | 255852759 | |
pjAssignmentStart9 | 255852760 | |
pjAssignmentStartVariance | 255852806 | |
pjAssignmentSummary | 255853190 | |
pjAssignmentSV | 255852581 | |
pjAssignmentTaskGuid | 255853181 | |
pjAssignmentTaskID | 255852547 | |
pjAssignmentTaskName | 255852549 | |
pjAssignmentTaskOutlineNumber | 255852923 | |
pjAssignmentTaskSummaryName | 255852686 | |
pjAssignmentTaskUniqueID | 255852545 | |
pjAssignmentTeamStatusPending | 255852619 | |
pjAssignmentText1 | 255852632 | |
pjAssignmentText10 | 255852641 | |
pjAssignmentText11 | 255852762 | |
pjAssignmentText12 | 255852763 | |
pjAssignmentText13 | 255852764 | |
pjAssignmentText14 | 255852765 | |
pjAssignmentText15 | 255852766 | |
pjAssignmentText16 | 255852767 | |
pjAssignmentText17 | 255852768 | |
pjAssignmentText18 | 255852769 | |
pjAssignmentText19 | 255852770 | |
pjAssignmentText2 | 255852633 | |
pjAssignmentText20 | 255852771 | |
pjAssignmentText21 | 255852772 | |
pjAssignmentText22 | 255852773 | |
pjAssignmentText23 | 255852774 | |
pjAssignmentText24 | 255852775 | |
pjAssignmentText25 | 255852776 | |
pjAssignmentText26 | 255852777 | |
pjAssignmentText27 | 255852778 | |
pjAssignmentText28 | 255852779 | |
pjAssignmentText29 | 255852780 | |
pjAssignmentText3 | 255852634 | |
pjAssignmentText30 | 255852781 | |
pjAssignmentText4 | 255852635 | |
pjAssignmentText5 | 255852636 | |
pjAssignmentText6 | 255852637 | |
pjAssignmentText7 | 255852638 | |
pjAssignmentText8 | 255852639 | |
pjAssignmentText9 | 255852640 | |
pjAssignmentUniqueID | 255852544 | |
pjAssignmentUpdateNeeded | 255852618 | |
pjAssignmentVAC | 255852815 | |
pjAssignmentWBS | 255852830 | |
pjAssignmentWork | 255852552 | |
pjAssignmentWorkContour | 255852583 | |
pjAssignmentWorkVariance | 255852792 |
Applies to
Geri Bildirim
https://aka.ms/ContentUserFeedback.
Çok yakında: 2024 boyunca, içerik için geri bildirim mekanizması olarak GitHub Sorunları’nı kullanımdan kaldıracak ve yeni bir geri bildirim sistemiyle değiştireceğiz. Daha fazla bilgi için bkz.Gönderin ve geri bildirimi görüntüleyin