Düzenle

Aracılığıyla paylaş


Project Interface

Definition

public interface class Project : Microsoft::Office::Interop::MSProject::_EProjectDoc_Event, Microsoft::Office::Interop::MSProject::_IProjectDoc
[System.Runtime.InteropServices.Guid("00020B00-0000-0000-C000-000000000046")]
public interface Project : Microsoft.Office.Interop.MSProject._EProjectDoc_Event, Microsoft.Office.Interop.MSProject._IProjectDoc
type Project = interface
    interface _IProjectDoc
    interface _EProjectDoc_Event
Public Interface Project
Implements _EProjectDoc_Event, _IProjectDoc
Derived
Attributes
Implements

Properties

_CodeName (Inherited from _IProjectDoc)
AcceptNewExternalData (Inherited from _IProjectDoc)
ActualCost (Inherited from _IProjectDoc)
ActualDuration (Inherited from _IProjectDoc)
ActualFinish (Inherited from _IProjectDoc)
ActualStart (Inherited from _IProjectDoc)
ActualWork (Inherited from _IProjectDoc)
AdministrativeProject (Inherited from _IProjectDoc)
AllowTaskDelegation (Inherited from _IProjectDoc)
AndMoveCompleted (Inherited from _IProjectDoc)
AndMoveRemaining (Inherited from _IProjectDoc)
Application (Inherited from _IProjectDoc)
AskForCompletedWork (Inherited from _IProjectDoc)
Author (Inherited from _IProjectDoc)
AutoAddResources (Inherited from _IProjectDoc)
AutoCalcCosts (Inherited from _IProjectDoc)
AutoFilter (Inherited from _IProjectDoc)
AutoLinkTasks (Inherited from _IProjectDoc)
AutoSplitTasks (Inherited from _IProjectDoc)
AutoTrack (Inherited from _IProjectDoc)
BaseCalendars (Inherited from _IProjectDoc)
BaselineCost (Inherited from _IProjectDoc)
BaselineDuration (Inherited from _IProjectDoc)
BaselineFinish (Inherited from _IProjectDoc)
BaselineSavedDate[PjBaselines] (Inherited from _IProjectDoc)
BaselineStart (Inherited from _IProjectDoc)
BaselineWork (Inherited from _IProjectDoc)
BCWP (Inherited from _IProjectDoc)
BCWS (Inherited from _IProjectDoc)
BuiltinDocumentProperties (Inherited from _IProjectDoc)
Calendar (Inherited from _IProjectDoc)
CanCheckIn (Inherited from _IProjectDoc)
CodeName (Inherited from _IProjectDoc)
CommandBars (Inherited from _IProjectDoc)
Comments (Inherited from _IProjectDoc)
Company (Inherited from _IProjectDoc)
Confirmed (Inherited from _IProjectDoc)
ConstraintDate (Inherited from _IProjectDoc)
ConstraintType (Inherited from _IProjectDoc)
Contact (Inherited from _IProjectDoc)
Container (Inherited from _IProjectDoc)
Cost (Inherited from _IProjectDoc)
Cost1 (Inherited from _IProjectDoc)
Cost2 (Inherited from _IProjectDoc)
Cost3 (Inherited from _IProjectDoc)
CostVariance (Inherited from _IProjectDoc)
Created (Inherited from _IProjectDoc)
CreationDate (Inherited from _IProjectDoc)
Critical (Inherited from _IProjectDoc)
CurrencyCode (Inherited from _IProjectDoc)
CurrencyDigits (Inherited from _IProjectDoc)
CurrencySymbol (Inherited from _IProjectDoc)
CurrencySymbolPosition (Inherited from _IProjectDoc)
CurrentDate (Inherited from _IProjectDoc)
CurrentFilter (Inherited from _IProjectDoc)
CurrentGroup (Inherited from _IProjectDoc)
CurrentTable (Inherited from _IProjectDoc)
CurrentView (Inherited from _IProjectDoc)
CustomDocumentProperties (Inherited from _IProjectDoc)
CV (Inherited from _IProjectDoc)
DatabaseProjectUniqueID (Inherited from _IProjectDoc)
DayLabelDisplay (Inherited from _IProjectDoc)
DaysPerMonth (Inherited from _IProjectDoc)
DefaultDurationUnits (Inherited from _IProjectDoc)
DefaultEarnedValueMethod (Inherited from _IProjectDoc)
DefaultEffortDriven (Inherited from _IProjectDoc)
DefaultFinishTime (Inherited from _IProjectDoc)
DefaultFixedCostAccrual (Inherited from _IProjectDoc)
DefaultResourceOvertimeRate (Inherited from _IProjectDoc)
DefaultResourceStandardRate (Inherited from _IProjectDoc)
DefaultStartTime (Inherited from _IProjectDoc)
DefaultTaskType (Inherited from _IProjectDoc)
DefaultWorkUnits (Inherited from _IProjectDoc)
Delay (Inherited from _IProjectDoc)
DetectCycle (Inherited from _IProjectDoc)
DisplayProjectSummaryTask (Inherited from _IProjectDoc)
DocumentLibraryVersions (Inherited from _IProjectDoc)
Duration (Inherited from _IProjectDoc)
Duration1 (Inherited from _IProjectDoc)
Duration2 (Inherited from _IProjectDoc)
Duration3 (Inherited from _IProjectDoc)
DurationVariance (Inherited from _IProjectDoc)
EarlyFinish (Inherited from _IProjectDoc)
EarlyStart (Inherited from _IProjectDoc)
EarnedValueBaseline (Inherited from _IProjectDoc)
EnterpriseActualsSynched (Inherited from _IProjectDoc)
ExpandDatabaseTimephasedData (Inherited from _IProjectDoc)
Finish (Inherited from _IProjectDoc)
Finish1 (Inherited from _IProjectDoc)
Finish2 (Inherited from _IProjectDoc)
Finish3 (Inherited from _IProjectDoc)
Finish4 (Inherited from _IProjectDoc)
Finish5 (Inherited from _IProjectDoc)
FinishVariance (Inherited from _IProjectDoc)
FixedCost (Inherited from _IProjectDoc)
FixedDuration (Inherited from _IProjectDoc)
Flag1 (Inherited from _IProjectDoc)
Flag10 (Inherited from _IProjectDoc)
Flag2 (Inherited from _IProjectDoc)
Flag3 (Inherited from _IProjectDoc)
Flag4 (Inherited from _IProjectDoc)
Flag5 (Inherited from _IProjectDoc)
Flag6 (Inherited from _IProjectDoc)
Flag7 (Inherited from _IProjectDoc)
Flag8 (Inherited from _IProjectDoc)
Flag9 (Inherited from _IProjectDoc)
FollowedHyperlinkColor (Inherited from _IProjectDoc)
FollowedHyperlinkColorEx (Inherited from _IProjectDoc)
FreeSlack (Inherited from _IProjectDoc)
FullName (Inherited from _IProjectDoc)
HasPassword (Inherited from _IProjectDoc)
HideBar (Inherited from _IProjectDoc)
HonorConstraints (Inherited from _IProjectDoc)
HourLabelDisplay (Inherited from _IProjectDoc)
HoursPerDay (Inherited from _IProjectDoc)
HoursPerWeek (Inherited from _IProjectDoc)
HyperlinkColor (Inherited from _IProjectDoc)
HyperlinkColorEx (Inherited from _IProjectDoc)
ID (Inherited from _IProjectDoc)
Index (Inherited from _IProjectDoc)
IsCheckoutMsgBarVisible (Inherited from _IProjectDoc)
IsCheckoutOSVisible (Inherited from _IProjectDoc)
IsTemplate (Inherited from _IProjectDoc)
KeepTaskOnNearestWorkingTimeWhenMadeAutoScheduled (Inherited from _IProjectDoc)
Keywords (Inherited from _IProjectDoc)
LastPrintedDate (Inherited from _IProjectDoc)
LastSaveDate (Inherited from _IProjectDoc)
LastSavedBy (Inherited from _IProjectDoc)
LateFinish (Inherited from _IProjectDoc)
LateStart (Inherited from _IProjectDoc)
LevelEntireProject (Inherited from _IProjectDoc)
LevelFromDate (Inherited from _IProjectDoc)
LevelToDate (Inherited from _IProjectDoc)
LinkedFields (Inherited from _IProjectDoc)
Manager (Inherited from _IProjectDoc)
ManuallyScheduledTasksAutoRespectLinks (Inherited from _IProjectDoc)
MapList (Inherited from _IProjectDoc)
Marked (Inherited from _IProjectDoc)
Milestone (Inherited from _IProjectDoc)
MinuteLabelDisplay (Inherited from _IProjectDoc)
MonthLabelDisplay (Inherited from _IProjectDoc)
MoveCompleted (Inherited from _IProjectDoc)
MoveRemaining (Inherited from _IProjectDoc)
MultipleCriticalPaths (Inherited from _IProjectDoc)
Name (Inherited from _IProjectDoc)
NewTasksCreatedAsManual (Inherited from _IProjectDoc)
NewTasksEstimated (Inherited from _IProjectDoc)
Notes (Inherited from _IProjectDoc)
Number1 (Inherited from _IProjectDoc)
Number2 (Inherited from _IProjectDoc)
Number3 (Inherited from _IProjectDoc)
Number4 (Inherited from _IProjectDoc)
Number5 (Inherited from _IProjectDoc)
NumberOfResources (Inherited from _IProjectDoc)
NumberOfTasks (Inherited from _IProjectDoc)
Objects (Inherited from _IProjectDoc)
OutlineChildren (Inherited from _IProjectDoc)
OutlineCodes (Inherited from _IProjectDoc)
OutlineLevel (Inherited from _IProjectDoc)
OutlineNumber (Inherited from _IProjectDoc)
Parent (Inherited from _IProjectDoc)
Path (Inherited from _IProjectDoc)
PercentComplete (Inherited from _IProjectDoc)
PercentWorkComplete (Inherited from _IProjectDoc)
PhoneticType (Inherited from _IProjectDoc)
Priority (Inherited from _IProjectDoc)
Project (Inherited from _IProjectDoc)
ProjectFinish (Inherited from _IProjectDoc)
ProjectGuideContent (Inherited from _IProjectDoc)
ProjectGuideFunctionalLayoutPage (Inherited from _IProjectDoc)
ProjectGuideSaveBuffer (Inherited from _IProjectDoc)
ProjectGuideUseDefaultContent (Inherited from _IProjectDoc)
ProjectGuideUseDefaultFunctionalLayoutPage (Inherited from _IProjectDoc)
ProjectNamePrefix (Inherited from _IProjectDoc)
ProjectNotes (Inherited from _IProjectDoc)
ProjectServerUsedForTracking (Inherited from _IProjectDoc)
ProjectStart (Inherited from _IProjectDoc)
ProjectSummaryTask (Inherited from _IProjectDoc)
PublishInformationOnSave (Inherited from _IProjectDoc)
ReadOnly (Inherited from _IProjectDoc)
ReadOnlyRecommended (Inherited from _IProjectDoc)
ReceiveNotifications (Inherited from _IProjectDoc)
RemainingCost (Inherited from _IProjectDoc)
RemainingDuration (Inherited from _IProjectDoc)
RemainingWork (Inherited from _IProjectDoc)
RemoveFileProperties (Inherited from _IProjectDoc)
ReportList (Inherited from _IProjectDoc)
Reports (Inherited from _IProjectDoc)
ResourceFilterList (Inherited from _IProjectDoc)
ResourceFilters (Inherited from _IProjectDoc)
ResourceGroup (Inherited from _IProjectDoc)
ResourceGroupList (Inherited from _IProjectDoc)
ResourceGroups (Inherited from _IProjectDoc)
ResourceGroups2 (Inherited from _IProjectDoc)
ResourceInitials (Inherited from _IProjectDoc)
ResourceNames (Inherited from _IProjectDoc)
ResourcePoolName (Inherited from _IProjectDoc)
Resources (Inherited from _IProjectDoc)
ResourceTableList (Inherited from _IProjectDoc)
ResourceTables (Inherited from _IProjectDoc)
ResourceViewList (Inherited from _IProjectDoc)
Resume (Inherited from _IProjectDoc)
ResumeNoEarlierThan (Inherited from _IProjectDoc)
RevisionNumber (Inherited from _IProjectDoc)
Rollup (Inherited from _IProjectDoc)
Saved (Inherited from _IProjectDoc)
ScheduleFromStart (Inherited from _IProjectDoc)
SendHyperlinkNote (Inherited from _IProjectDoc)
ServerIdentification (Inherited from _IProjectDoc)
ServerPath (Inherited from _IProjectDoc)
ServerURL (Inherited from _IProjectDoc)
SharedWorkspace (Inherited from _IProjectDoc)
ShowCriticalSlack (Inherited from _IProjectDoc)
ShowCrossProjectLinksInfo (Inherited from _IProjectDoc)
ShowEstimatedDuration (Inherited from _IProjectDoc)
ShowExternalPredecessors (Inherited from _IProjectDoc)
ShowExternalSuccessors (Inherited from _IProjectDoc)
ShowTaskSuggestions (Inherited from _IProjectDoc)
ShowTaskWarnings (Inherited from _IProjectDoc)
SpaceBeforeTimeLabels (Inherited from _IProjectDoc)
SpreadCostsToStatusDate (Inherited from _IProjectDoc)
SpreadPercentCompleteToStatusDate (Inherited from _IProjectDoc)
Start (Inherited from _IProjectDoc)
Start1 (Inherited from _IProjectDoc)
Start2 (Inherited from _IProjectDoc)
Start3 (Inherited from _IProjectDoc)
Start4 (Inherited from _IProjectDoc)
Start5 (Inherited from _IProjectDoc)
StartOnCurrentDate (Inherited from _IProjectDoc)
StartVariance (Inherited from _IProjectDoc)
StartWeekOn (Inherited from _IProjectDoc)
StartYearIn (Inherited from _IProjectDoc)
StatusDate (Inherited from _IProjectDoc)
Stop (Inherited from _IProjectDoc)
Subject (Inherited from _IProjectDoc)
Subprojects (Inherited from _IProjectDoc)
Summary (Inherited from _IProjectDoc)
SV (Inherited from _IProjectDoc)
TaskErrorCount (Inherited from _IProjectDoc)
TaskFilterList (Inherited from _IProjectDoc)
TaskFilters (Inherited from _IProjectDoc)
TaskGroupList (Inherited from _IProjectDoc)
TaskGroups (Inherited from _IProjectDoc)
TaskGroups2 (Inherited from _IProjectDoc)
Tasks (Inherited from _IProjectDoc)
TaskTableList (Inherited from _IProjectDoc)
TaskTables (Inherited from _IProjectDoc)
TaskViewList (Inherited from _IProjectDoc)
TeamMembersCanDeclineTasks (Inherited from _IProjectDoc)
Template (Inherited from _IProjectDoc)
TempToDoList (Inherited from _IProjectDoc)
Text1 (Inherited from _IProjectDoc)
Text10 (Inherited from _IProjectDoc)
Text2 (Inherited from _IProjectDoc)
Text3 (Inherited from _IProjectDoc)
Text4 (Inherited from _IProjectDoc)
Text5 (Inherited from _IProjectDoc)
Text6 (Inherited from _IProjectDoc)
Text7 (Inherited from _IProjectDoc)
Text8 (Inherited from _IProjectDoc)
Text9 (Inherited from _IProjectDoc)
Title (Inherited from _IProjectDoc)
TotalSlack (Inherited from _IProjectDoc)
TrackingMethod (Inherited from _IProjectDoc)
TrackOvertimeWork (Inherited from _IProjectDoc)
Type (Inherited from _IProjectDoc)
UnderlineHyperlinks (Inherited from _IProjectDoc)
UniqueID (Inherited from _IProjectDoc)
UpdateNeeded (Inherited from _IProjectDoc)
UpdateProjOnSave (Inherited from _IProjectDoc)
UseFYStartYear (Inherited from _IProjectDoc)
UserControl (Inherited from _IProjectDoc)
VBASigned (Inherited from _IProjectDoc)
VBProject (Inherited from _IProjectDoc)
VersionName (Inherited from _IProjectDoc)
ViewList (Inherited from _IProjectDoc)
Views (Inherited from _IProjectDoc)
ViewsCombination (Inherited from _IProjectDoc)
ViewsSingle (Inherited from _IProjectDoc)
WBS (Inherited from _IProjectDoc)
WBSCodeGenerate (Inherited from _IProjectDoc)
WBSVerifyUniqueness (Inherited from _IProjectDoc)
WeekLabelDisplay (Inherited from _IProjectDoc)
Windows (Inherited from _IProjectDoc)
Windows2 (Inherited from _IProjectDoc)
Work (Inherited from _IProjectDoc)
WorkgroupMessages (Inherited from _IProjectDoc)
WorkVariance (Inherited from _IProjectDoc)
WriteReserved (Inherited from _IProjectDoc)
YearLabelDisplay (Inherited from _IProjectDoc)

Methods

Activate() (Inherited from _IProjectDoc)
add_Activate(_EProjectDoc_ActivateEventHandler) (Inherited from _EProjectDoc_Event)
add_BeforeClose(_EProjectDoc_BeforeCloseEventHandler) (Inherited from _EProjectDoc_Event)
add_BeforePrint(_EProjectDoc_BeforePrintEventHandler) (Inherited from _EProjectDoc_Event)
add_BeforeSave(_EProjectDoc_BeforeSaveEventHandler) (Inherited from _EProjectDoc_Event)
add_Calculate(_EProjectDoc_CalculateEventHandler) (Inherited from _EProjectDoc_Event)
add_Change(_EProjectDoc_ChangeEventHandler) (Inherited from _EProjectDoc_Event)
add_Deactivate(_EProjectDoc_DeactivateEventHandler) (Inherited from _EProjectDoc_Event)
add_Open(_EProjectDoc_OpenEventHandler) (Inherited from _EProjectDoc_Event)
AppendNotes(String) (Inherited from _IProjectDoc)
CheckIn(Object, Object, Object) (Inherited from _IProjectDoc)
CheckoutProject() (Inherited from _IProjectDoc)
DeliverableAcceptChanges(String) (Inherited from _IProjectDoc)
DeliverableCreate(String, Object, Object, String) (Inherited from _IProjectDoc)
DeliverableDelete(String) (Inherited from _IProjectDoc)
DeliverableDependencyCreate(String, String) (Inherited from _IProjectDoc)
DeliverableDependencyDelete(String) (Inherited from _IProjectDoc)
DeliverableLinkToProject(String) (Inherited from _IProjectDoc)
DeliverableLinkToTask(String, String) (Inherited from _IProjectDoc)
DeliverableRefreshServerCache(Object) (Inherited from _IProjectDoc)
DeliverablesClearAll() (Inherited from _IProjectDoc)
DeliverablesGetByProject(String) (Inherited from _IProjectDoc)
DeliverablesGetProviderProjects() (Inherited from _IProjectDoc)
DeliverablesGetServerCachedXml() (Inherited from _IProjectDoc)
DeliverablesGetXml() (Inherited from _IProjectDoc)
DeliverableUpdate(String, String, Object, Object) (Inherited from _IProjectDoc)
ExportAsFixedFormat(String, PjDocExportType, Boolean, Boolean, Boolean, Object, Object, Object) (Inherited from _IProjectDoc)
GetDisplayNameFromObjectMatchingID(PjOrganizer, String) (Inherited from _IProjectDoc)
GetObjectMatchingID(PjOrganizer, String) (Inherited from _IProjectDoc)
GetServerProjectGuid() (Inherited from _IProjectDoc)
GetTaskIndexByGuid(String) (Inherited from _IProjectDoc)
GetWinprojURLs() (Inherited from _IProjectDoc)
HideCheckoutMsgBar() (Inherited from _IProjectDoc)
ImportResourceErrorCount() (Inherited from _IProjectDoc)
LevelClearDates() (Inherited from _IProjectDoc)
LocalResourceCount() (Inherited from _IProjectDoc)
LocalResourceErrorCount() (Inherited from _IProjectDoc)
MakeServerURLTrusted() (Inherited from _IProjectDoc)
ReadWssData(String) (Inherited from _IProjectDoc)
remove_Activate(_EProjectDoc_ActivateEventHandler) (Inherited from _EProjectDoc_Event)
remove_BeforeClose(_EProjectDoc_BeforeCloseEventHandler) (Inherited from _EProjectDoc_Event)
remove_BeforePrint(_EProjectDoc_BeforePrintEventHandler) (Inherited from _EProjectDoc_Event)
remove_BeforeSave(_EProjectDoc_BeforeSaveEventHandler) (Inherited from _EProjectDoc_Event)
remove_Calculate(_EProjectDoc_CalculateEventHandler) (Inherited from _EProjectDoc_Event)
remove_Change(_EProjectDoc_ChangeEventHandler) (Inherited from _EProjectDoc_Event)
remove_Deactivate(_EProjectDoc_DeactivateEventHandler) (Inherited from _EProjectDoc_Event)
remove_Open(_EProjectDoc_OpenEventHandler) (Inherited from _EProjectDoc_Event)
ResourceCount() (Inherited from _IProjectDoc)
ResourceErrorCount() (Inherited from _IProjectDoc)
RSVDragSimulator(Object, Object, Object) (Inherited from _IProjectDoc)
SaveAs(Object, PjFileFormat, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object, Object) (Inherited from _IProjectDoc)
SetCustomUI(String) (Inherited from _IProjectDoc)
SetObjectMatchingID(PjOrganizer, String, String) (Inherited from _IProjectDoc)

Events

BeforeClose (Inherited from _EProjectDoc_Event)
BeforePrint (Inherited from _EProjectDoc_Event)
BeforeSave (Inherited from _EProjectDoc_Event)
Calculate (Inherited from _EProjectDoc_Event)
Change (Inherited from _EProjectDoc_Event)
Deactivate (Inherited from _EProjectDoc_Event)
Open (Inherited from _EProjectDoc_Event)

Applies to