ReportTable.UpdateTableData(Boolean, String, String, Int32, Object) Method
Definition
Important
Some information relates to prerelease product that may be substantially modified before it’s released. Microsoft makes no warranties, express or implied, with respect to the information provided here.
public void UpdateTableData (bool Task, string GroupName = "", string FilterName = "", int OutlineLevel = -1, object SafeArrayOfPjField);
abstract member UpdateTableData : bool * string * string * int * obj -> unit
Public Sub UpdateTableData (Task As Boolean, Optional GroupName As String = "", Optional FilterName As String = "", Optional OutlineLevel As Integer = -1, Optional SafeArrayOfPjField As Object)
Parameters
- Task
- Boolean
- GroupName
- String
- FilterName
- String
- OutlineLevel
- Int32
- SafeArrayOfPjField
- Object
Applies to
Geri Bildirim
https://aka.ms/ContentUserFeedback.
Çok yakında: 2024 boyunca, içerik için geri bildirim mekanizması olarak GitHub Sorunları’nı kullanımdan kaldıracak ve yeni bir geri bildirim sistemiyle değiştireceğiz. Daha fazla bilgi için bkz.Gönderin ve geri bildirimi görüntüleyin