Shapes.AddPicture 方法
定义
重要
一些信息与预发行产品相关,相应产品在发行之前可能会进行重大修改。 对于此处提供的信息,Microsoft 不作任何明示或暗示的担保。
public Microsoft.Office.Interop.MSProject.Shape AddPicture (string Filename, Microsoft.Office.Core.MsoTriState LinkToFile, Microsoft.Office.Core.MsoTriState SaveWithDocument, float Left, float Top, float Width = -1, float Height = -1);
abstract member AddPicture : string * Microsoft.Office.Core.MsoTriState * Microsoft.Office.Core.MsoTriState * single * single * single * single -> Microsoft.Office.Interop.MSProject.Shape
Public Function AddPicture (Filename As String, LinkToFile As MsoTriState, SaveWithDocument As MsoTriState, Left As Single, Top As Single, Optional Width As Single = -1, Optional Height As Single = -1) As Shape
参数
- Filename
- String
- LinkToFile
- MsoTriState
- SaveWithDocument
- MsoTriState
- Left
- Single
- Top
- Single
- Width
- Single
- Height
- Single