共用方式為


重新放置雲端工作負載

重新放置指引會示範如何設定重新配置專案,以及重新放置一或多個工作負載。

Diagram showing the relocation process. There are two phases and five steps. The first phase is the Initiate phase, and it has one step called Initiate. The second phase is the Move phase, and it has four steps that you repeat for each workload. The steps are Evaluate, Select, Migrate, and Cutover.

什麼是重新配置?

重新配置是將 Azure 中的工作負載或工作負載元件移至不同 Azure 區域的程式。 工作負載是支援已定義進程之應用程式、環境、服務和數據的集合。 工作負載可以有一或多個應用程式。 將單一或多應用程式工作負載重新放置至不同區域是一種移轉類型,且與移轉指引定義的程式相似之處。 但搬遷也有自己的解決方案和考慮來實作,這裡的搬遷指引概述這些獨特的功能,以協助您瀏覽搬遷程式。

Diagram showing a single-app workload and a multi-app workload. There's a workload with a single application in it. The other workload has n applications in it, representing an indefinite number of applications. The applications in each workload show a production and non-production environments. In each environment, there's three representational services, one for compute, one for the database, and the other for an indefinite number of other Azure services.

為什麼要重新置放?

重新配置可協助您在工作負載生命週期中優化成本和效能的彈性。 當工作負載第一次部署或移轉至 Azure 時,您可以決定其區域。 不過,隨著時間的流逝,您應該檢閱該決策,以查看不同的區域是否更適合。 例如,另一個區域可能有目前區域中無法使用的服務或功能,或者您可能想要將工作負載更接近新的客戶群。 數據落地法可能會變更,或預算可能會改變。 相較於解決這些變更並遇到成本或效能問題,重新配置可能是繼續工作負載的最佳方式。

重新配置驅動程式 範例
商務發展 回應業務變更並擴展全球使用量。
合規性 符合數據主權和落地需求。
接近 為終端使用者提供較低的延遲。

如何重新放置

搬遷有兩個階段。 第一個階段是起始搬遷專案。 第二個階段是藉由規劃和執行重新配置來移動工作負載。 以下是每個階段的概觀:

  • 起始階段:起始階段具有也稱為起始的單一步驟。 起始階段的目標是設定搬遷專案、取得項目關係人核准,以及識別搬遷的工作負載。

  • 移動階段:移動階段是規劃工作負載並將工作負載移至不同區域的四個步驟程式。 移動階段中的步驟為 (1) 評估、(2) 選取、(3) 移轉和 (4) 完全移轉。 在剪下最終工作負載之後,您必須正式關閉重新配置專案。

重新定位步驟 主要目標
1. 起始 建立搬遷專案。
2. 評估 進行工作負載探索。
3. 選取 挑選正確的重新配置方法。
4. 移轉 重新放置工作負載。
5. 完全移轉 將流量導向至新位置。

這些階段會定義重新配置專案的生命週期。 請務必注意,並非所有資源都支援重新配置。 有些需要重新部署。 如需詳細資訊,請參閱 移動資源作業支援。

假設

您應該閱讀重新配置最佳做法,並使用它們作為每個工作負載重新配置的指導。 下列文章將詳細說明您應該如何處理每個步驟。 內容強調要關注的重要領域,但也將您參考到其他檔,以取得更深入的技術見解。 它會假設對 Azure 區域和服務可用性有基本的瞭解。 如需詳細資訊,請參閱

無論您是重新配置多個工作負載,還是只重新配置一個工作負載,都可以透過一些正式重新配置規劃來協助重新配置成功。 起始階段提供必要的指引。