For a Task, Stop is the date that represents the end of the actual portion of a task.

For an Assignment, it is the date that the assignment was stopped.

<Stop>
  DateTimeValue
</Stop>

Parent Elements

TaskAssignment

Occurrences

Minimum: 0

Maximum: 1