Note
Access to this page requires authorization. You can try signing in or changing directories.
Access to this page requires authorization. You can try changing directories.
Run a controlled pilot to check whether Cowork improves actual work at an acceptable level of quality, risk, and cost. Then evaluate whether to expand, hold for improvements, or change direction.
The process owner leads the pilot with the sponsor and IT. Begin after technical and business readiness is approved for the version and scope being tested.
Agree on the pilot scope and success measures
Write a short pilot plan, or charter, with five items:
- Scope: One process, named users, and the cases included. Use representative roles and experience levels.
- Window: Fixed start and end dates, allowing enough real cases to judge the result.
- Baseline: Current time and quality, using the measures established during process selection.
- Thresholds: What counts as success for quality, effort, cost, and controls, plus when to pause.
- Decision: Who decides whether to expand and the review date.
Keep the existing process available when Cowork can't complete a case. Count failed and abandoned attempts, not only successful outputs. If too few cases occur, report that limitation rather than claiming success.
Agree on measures before starting. If requirements change during the pilot, record the change and decide whether a new comparison period is needed.
Scope and verify access
Check Cowork access, skill or plugin availability, and source permissions separately.
- Share the tested skill or deploy the plugin and its dependencies to the intended users.
- Check all spending policies selecting Cowork, including broader scopes and Auto-apply new services.
- Verify sign-in, environment, and source permissions with pilot users. Confirm that access restrictions apply to nonparticipants.
- Record the version and configuration being tested.
Important
A spending policy that selects Cowork grants access to users in its scope. Use policy scope, not a low credit limit, to control who can use Cowork. Check all applicable policies for broader access.
Review access controls and the current billing requirements before enabling pilot access.
If Cowork is already available broadly, limit the pilot's custom skill or plugin without disrupting unrelated users. Learn more about managing plugins. Check whether a plugin is enabled before interpreting low usage as lack of interest.
Plan and monitor consumption
Cowork usage consumes Copilot Credits. Estimate consumption from expected users, case volume, and task complexity. Learn more in Usage-based billing.
Set group scope, per-user limits, and alerts for accountable owners. Learn more about managing spending policies. Limits are a financial safeguard, not a real-time stop. Enforcement is asynchronous.
Use the scorecard to review credit consumption weekly. Monitor consumption and incidents more frequently when usage volume or risk warrants it. Compare total credits used with the number of accepted outputs. Include credits used for retries and rejected work in total consumption. If you can't separate pilot usage from other usage, label the figures as estimates. Consider support, review, and external service costs when assessing value.
Review a scorecard
Review a weekly scorecard with the process owner and IT. Use the same definitions as the baseline and report the case counts alongside percentages.
| Measure | What to check |
|---|---|
| Output accepted without major edits | Whether quality meets the agreed standard |
| Time compared with baseline | Preparation, review, correction, and any waiting |
| Approvals and controls | Whether behavior matches the design |
| Safety or data incidents | Incidents and near misses, with zero incidents as the target |
| Users choosing Cowork for real work | Adoption and reasons for non-use |
| Credits and operating cost | Consumption relative to completed and accepted work |
Include incomplete cases and compare similar work. For example, don't compare supplier reviews with missing ratings only against easy baseline cases.
Ask users what they trusted, corrected, or chose not to use. Investigate every incident through the agreed support route.
Example completed scorecard
The following numbers are illustrative, not recommended targets. This draft-only supplier-review pilot completed 20 cases comparable to the baseline.
| Measure | Baseline | Agreed threshold | Pilot result |
|---|---|---|---|
| Median total preparation and review time per case | 60 minutes | 40 minutes or less | 35 minutes |
| Outputs accepted without major edits | 16 of 20 (80%) | At least 18 of 20 (90%) | 18 of 20 (90%) |
| Safety or data incidents | 0 | 0; pause on any incident | 0 |
Decision: Go within the tested draft-only scope. The agreed thresholds and control checks passed, consumption stayed within the agreed budget, and ongoing owners accepted their responsibilities. The process owner recorded a review date for the expanded group. This decision doesn't authorize new actions or remove analyst review.
Manage changes during the pilot
Record changes and versions, rerun affected tests, and distinguish results before and after significant changes. If stop conditions are met, pause affected work and use the incident and recovery procedure before resuming.
Assign owners before expansion
Before expanding, name one accountable owner for each responsibility.
| Responsibility | Suggested accountable role | Ongoing work |
|---|---|---|
| Business outcome and value | Sponsor | Review measured value and authorize changes in direction. |
| Method and output quality | Process owner | Maintain rules, acceptance criteria, and evidence requirements. |
| Connector and source access | System owner | Maintain services, authentication, environments, and permissions. |
| Deployment and spending | IT admin | Manage distribution, access, consumption, and alerts. |
| Control design and risk review | Designated security or risk owner | Review incidents, control changes, and residual risk. |
| Updates and release | Delivery or operations owner | Test, distribute, support, and retire maintained components. |
Adapt these roles to your organization. Confirm who is consulted and who can accept risk, and give owners the access and support they need.
Make a go, hold, or pivot decision
Compare the scorecard, Skill Report where applicable, and user feedback with the pilot thresholds.
Go: Expand within a defined scope
Choose to proceed (go) when the agreed targets are met without safety failures, the required controls work, and owners are ready to take ongoing responsibility. Expand use in stages within the tested scope. New actions need their own design and validation.
Hold: Resolve specific gaps
Choose to pause (hold) when value is shown but gaps or insufficient evidence remain. Name the fixes, owners, and next decision date.
Pivot: Change the approach or stop
Choose to pivot or change direction when there's no measurable gain or risk is too high. Narrow the process scope, change the approach, or retire the solution. For retirement, stop new work, address active tasks, remove unneeded access and resources, and handle stored outputs according to policy.
Record the decision
Keep the following information together:
- Decision, owner, and date.
- Evaluated version, scope, and participating roles.
- Results against each threshold and links to supporting evidence.
- Evidence limitations and unresolved issues.
- Accepted risks and the people authorized to accept them.
- Next actions, accountable owners, and review date.
Operate after go
Keep support and monitoring active, with a review cadence suited to risk and volume. Update instructions and references when the process changes, and rerun relevant tests.
Use skill evaluations alongside the business scorecard. Distribute tested updates, re-share directly shared skills when required, and verify dependencies.
Review the decision on the scheduled date. Also review it when source changes, policies are revised, new integrations are added, or incidents recur.