ProjectDataSet.TaskRow Class

Definition

Defines the properties, methods, and events of one task in a TaskDataTable.

public: ref class ProjectDataSet::TaskRow : System::Data::DataRow
public class ProjectDataSet.TaskRow : System.Data.DataRow
type ProjectDataSet.TaskRow = class
    inherit DataRow
Public Class ProjectDataSet.TaskRow
Inherits DataRow
Inheritance
ProjectDataSet.TaskRow

Remarks

Note: The PSI can process up to 1000 rows of data at one time. If the total number of rows of new or updated data in all tables of ProjectDataSet exceeds 1000, the PSI returns the Microsoft.Office.Project.Server.Library.PSErrorID.ProjectExceededItemsLimiterror.

For more information, see ProjectDataSet.TaskRow.

Properties

AddAfterTaskUID

Adds a task after the specified task GUID.

AddPosition

Specifies the position in a project to add a task.

CREATED_DATE

The date when the task was created.

DurationType

Deprecated. Use TASK_DUR_FMT to set the desired duration display format.

MOD_DATE

The date when the task was last saved to the project.

PROJ_NAME

A copy of the project name.

PROJ_OPT_CURRENCY_DIGITS

To be deprecated in the TaskDataTable. Specifies the number of digits that are displayed to the right of the decimal when currency values are displayed.

PROJ_OPT_CURRENCY_POSITION

To be deprecated in the TaskDataTable. Specifies the placement of the currency symbol in relation to the currency value.

PROJ_OPT_CURRENCY_SYMBOL

To be deprecated in the TaskDataTable. The symbol that is used to represent the type of currency that is used in the project.

PROJ_TYPE

Specifies the Project.ProjectType of the project to which the task belongs.

PROJ_UID

Specifies the GUID of the project to which this task belongs.

StatusManager

Gets or sets the GUID of the task status manager.

TASK_ACT_COST

Specifies the total current actual cost that is incurred for this task.

TASK_ACT_DUR

Specifies the span of actual working time for a task so far, based on the scheduled duration and current remaining work or percentage of work complete.

TASK_ACT_FINISH

Specifies the date and time when a task actually finished.

TASK_ACT_OVT_COST

Specifies the costs that are incurred for overtime work that has been performed on a task by all assigned resources.

TASK_ACT_OVT_WORK

Specifies the actual amount of overtime work that has been performed by all resources assigned to a task.

TASK_ACT_START

Specifies the date and time when a task actually began.

TASK_ACT_WORK

Specifies the amount of work that has been done by the resources that are assigned to a task.

TASK_ACWP

Actual cost of work performed is the sum of costs that are incurred for work done on a task, up to the project status date or today's date.

TASK_BCWP

Budgeted cost of work performed specifies the task earned value.

TASK_BCWS

Budgeted cost for work scheduled specifies the cumulative timephased baseline costs up to the status date or today's date.

TASK_BUDGET_COST

Specifies the total budget cost for the task.

TASK_BUDGET_WORK

Specifies the total budget work for the task.

TASK_CAL_UID

Specifies the GUID of a task-specific calendar.

TASK_COMPLETE_THROUGH

Gets the date that specifies when the task was completed.

TASK_CONSTRAINT_DATE

Specifies the constrained start or finish date, depending on the value of TASK_CONSTRAINT_TYPE.

TASK_CONSTRAINT_TYPE

Indicates the type of scheduling constraint to use, with a short integer of Task.ConstraintType.

TASK_CONTACT

Contains the name of the person who is responsible for the task.

TASK_COST

Specifies the current projected cost of the task.

TASK_COST_VAR

Task cost variance specifies the difference between the baseline cost and the total cost for a task.

TASK_CPI

The Cost Performance Index (CPI) specifies the ratio of BCWP (budgeted cost of work performed) to ACWP (actual cost of work performed).

TASK_CV

Specifies the task cost variance.

TASK_DEADLINE

Specifies the date of the task deadline.

TASK_DUR

Specifies the duration of the task.

TASK_DUR_FMT

The task duration format indicates the desired display format of the duration value, and whether the duration is considered an estimate rather than a firm value.

TASK_DUR_IS_EST

Indicates whether the TASK_DUR_FMT is an estimate.

TASK_DUR_TXT

Contains the free-form text that is associated with the manually scheduled task duration.

TASK_DUR_VAR

Duration variance is the difference between the planned duration and the current duration of the task.

TASK_EAC

Estimate at completion is the total scheduled or projected cost for a task based on costs that have been incurred, in addition to the costs that are planned for remaining work.

TASK_EARLY_FINISH

Specifies the earliest possible date on which the task can finish.

TASK_EARLY_START

Specifies the earliest possible date that the task can start.

TASK_EVMETHOD

The earned value method indicates which method to use when calculating earned value.

TASK_EXT_PROJ_UID

Specifies the unique ID of the external project that is represented by this task.

TASK_FINISH_DATE

The date when this task is scheduled to be completed.

TASK_FINISH_SLACK

The finish slack duration is the duration between the TASK_EARLY_FINISH date and the TASK_LATE_FINISH date.

TASK_FINISH_TXT

Contains the free-form text that is associated with the manually scheduled task finish date.

TASK_FINISH_VAR

The task finish variance is the difference between the task finish date and the baseline finish date.

TASK_FIXED_COST

The fixed cost of a task includes any non-resource task expense.

TASK_FIXED_COST_ACCRUAL

Indicates how fixed costs are to be accrued in a task.

TASK_FREE_SLACK

The task free slack duration is the amount of time that a task can be delayed without delaying any successor tasks.

TASK_HAS_LINKED_FIELDS

Specifies whether the task has OLE linked fields.

TASK_HYPERLINK_ADDRESS

The task hyperlink address is the URI for the hyperlink that is associated with this task.

TASK_HYPERLINK_FRIENDLY_NAME

Specifies the display text for the hyperlink that is associated with this task.

TASK_HYPERLINK_SUB_ADDRESS

Specifies the anchor portion of the URI of the hyperlink that is associated with the task.

TASK_ID

Specifies an ordinal indicator of where the task is displayed in the list of tasks.

TASK_IGNORES_RES_CAL

Indicates whether the resource calendar should be ignored when scheduling this task.

TASK_IS_ACTIVE

Gets or sets the Boolean value that specifies whether the task is active.

TASK_IS_CRITICAL

Specifies whether slack is associated with this task.

TASK_IS_DISPSUMMARY

This member is reserved for internal use and is not intended to be used directly from your code. This field should always be zero.

TASK_IS_EFFORT_DRIVEN

Indicates whether scheduling for a task is effort-driven.

TASK_IS_EXTERNAL

Indicates whether the task is from another project or whether it originated in the current project.

TASK_IS_FROM_FINISH_SUBPROJ

Indicates whether a task represents an inserted project that is marked as Schedule-from-Finish (SF).

TASK_IS_MANUAL

Gets or sets the Boolean value that specifies whether the task is manually scheduled.

TASK_IS_MARKED

Indicates whether the task is tagged as having special meaning to the user.

TASK_IS_MILESTONE

Indicates whether a task is a milestone.

TASK_IS_NULL

Specifies whether the task has no values set.

TASK_IS_OVERALLOCATED

Indicates whether an assigned resource on a task has been assigned to more work on the task than can be done within the normal working capacity.

TASK_IS_READONLY_SUBPROJ

Specifies whether the task is a subproject that is set to read-only.

TASK_IS_RECURRING

Indicates whether a task is part of a series of recurring tasks.

TASK_IS_RECURRING_SUMMARY

Indicates whether a task is the parent of a series of repeating tasks.

TASK_IS_ROLLED_UP

Indicates whether information on the subtask Gantt bars is rolled up to the summary task bar.

TASK_IS_SUBPROJ

Indicates that the task represents a subproject.

TASK_IS_SUMMARY

Indicates whether a task is a summary task.

TASK_LATE_FINISH

Contains the latest date that a task can finish without delaying the finish of the project.

TASK_LATE_START

Contains the latest date that a task can start without delaying the finish of the project.

TASK_LEVELING_ADJUSTS_ASSN

Indicates whether the leveling function can delay and split individual assignments (rather than the entire task) to resolve over-allocations.

TASK_LEVELING_CAN_SPLIT

Indicates whether the resource leveling function can cause splits on remaining work on this task.

TASK_LEVELING_DELAY

Contains the amount of time that a task or assignment is to be delayed from its early start date as a result of resource leveling.

TASK_LEVELING_DELAY_FMT

Indicates the desired display format of the TASK_LEVELING_DELAY value, and whether the duration is considered only an estimate rather than a firm value.

TASK_LOCKDOWN_BY_MANAGER

Indicates whether a task has been locked out from changes by a manager.

TASK_NAME

Specifies the display title of the task.

TASK_NOTES

Contains the text value of user-entered notes for a task.

TASK_OUTLINE_LEVEL

Indicates the level of a task by number (such as 1, 2, or 3) in the project outline hierarchy.

TASK_OUTLINE_NUM

Represents a task's position by number (such as 1, 1.1, or 1.2.1) in the hierarchical outline structure.

TASK_OVT_COST

Contains the sum of TASK_ACT_OVT_COST and TASK_REM_OVT_COST.

TASK_OVT_WORK

Specifies the total amount of overtime work on a task.

TASK_PARENT_UID

Contains the GUID of the parent summary task.

TASK_PCT_COMP

Contains the percentage of elapsed duration compared with the remaining duration.

TASK_PCT_WORK_COMP

Contains the percentage of work elapsed compared with the amount of work that is remaining to be done.

TASK_PHY_PCT_COMP

Contains the physical percent of work completed on the task.

TASK_PRELEVELED_FINISH

Contains the finish date of a task before resource leveling.

TASK_PRELEVELED_START

Contains the start date of a task before resource leveling.

TASK_PRIORITY

Contains the level of importance that is given to a task, which indicates how readily a task or assignment can be delayed or split during resource leveling.

TASK_REG_WORK

Contains the total amount of non-overtime work that is scheduled to be performed by resources.

TASK_REM_COST

Contains the remaining cost to complete the task.

TASK_REM_DUR

Contains the amount of time that is required to complete the unfinished portion of a task.

TASK_REM_OVT_COST

Contains the remaining overtime cost to complete the task.

TASK_REM_OVT_WORK

Contains the sum of all remaining overtime work values for all the resources that are assigned to the task.

TASK_REM_WORK

Contains the amount of time that is required to complete a task.

TASK_RESUME_DATE

Contains the date when the remaining portion of a task is scheduled to resume after you enter any progress.

TASK_SCHED_DUR

Gets the duration of the task as calculated by the scheduler.

TASK_SCHED_DUR_FMT

Gets or sets the unit of measure in which the scheduled duration of a task is displayed in Project.

TASK_SCHED_FINISH

Gets the date and time when a task is scheduled to be completed.

TASK_SCHED_START

Gets the date and time when a task is scheduled to begin.

TASK_SPI

Task schedule performance index is the ratio of the budgeted cost of work performed to the budgeted cost of work scheduled.

TASK_START_DATE

Contains the starting date of the task.

TASK_START_SLACK

Contains the amount of time that a task start date can be delayed without delaying the project.

TASK_START_TXT

Gets or sets the free-form text that is associated with the manually scheduled task start date.

TASK_START_VAR

Task start variance is the difference between the baseline start date (TB_START ) and the actual start date (TASK_START_DATE).

TASK_STOP_DATE

Represents the end of the actual portion of a task.

TASK_SV

The cost difference between the current progress and the baseline plan of a task.

TASK_TCPI

Task to complete performance index is the ratio of remaining available budget to remaining scheduled cost as of the status date.

TASK_TOTAL_SLACK

Contains the amount of time a task's finish date can be delayed without delaying the project's finish date.

TASK_TYPE

Specifies the task type (fixed units, fixed duration, or fixed work).

TASK_UID

Specifies the unique identifier (GUID) of a task.

TASK_VAC

Task variance at completion is the difference between the TB_COST (Budget At Completion) or baseline cost and TASK_EAC (Estimate At Completion).

TASK_WBS

Task work breakdown structure code is a read-only alphanumeric code that can indicate the relationships between tasks.

TASK_WORK

Specifies the total amount of time that is scheduled on a task for all assigned resources.

TASK_WORK_VAR

Task work variance is the difference between baseline work of a task and the currently scheduled work.

TaskCVP

Contains the task cost variance percentage.

TaskSVP

Contains the task schedule variance percentage.

TB_COST

Task baseline cost is the total planned cost for a task as of a status date.

TB_DUR

Task baseline duration is the original span of time planned to complete a task.

TB_DUR_FMT

Task baseline duration format indicates the display format of the baseline duration value, and whether the baseline duration is considered only an estimate rather than a firm value.

TB_FINISH

Task baseline finish is the planned completion date for a task at the time you saved a baseline.

TB_START

Task baseline start is the planned beginning date for a task at the time you saved a baseline.

TB_WORK

Baseline work is the originally planned amount of work to be performed by all resources assigned to a task.

WOBJ_DOC_REF_CNT

This member is reserved for internal use and is not intended to be used directly from your code.

WOBJ_ISSUE_REF_CNT

This member is reserved for internal use and is not intended to be used directly from your code.

WOBJ_OTHER_REF_CNT

This member is reserved for internal use and is not intended to be used directly from your code.

WOBJ_RISK_REF_CNT

This member is reserved for internal use and is not intended to be used directly from your code.

Methods

IsAddAfterTaskUIDNull()

This member is reserved for internal use and is not intended to be used directly from your code. Determines whether the TASK_DUR property is set to a a null reference (Nothing in Visual Basic) value.

IsAddPositionNull()

Determines whether the AddPosition property is set to a a null reference (Nothing in Visual Basic) value.

IsCREATED_DATENull()

Determines whether the CREATED_DATE property is set to a a null reference (Nothing in Visual Basic) value.

IsDurationTypeNull()

Determines whether the DurationType property is set to a a null reference (Nothing in Visual Basic) value.

IsMOD_DATENull()

Determines whether the MOD_DATE property is set to a a null reference (Nothing in Visual Basic) value.

IsPROJ_NAMENull()

Determines whether the PROJ_NAME property is set to a a null reference (Nothing in Visual Basic) value.

IsPROJ_OPT_CURRENCY_DIGITSNull()

Determines whether the PROJ_OPT_CURRENCY_DIGITS property is set to a a null reference (Nothing in Visual Basic) value.

IsPROJ_OPT_CURRENCY_POSITIONNull()

Determines whether the PROJ_OPT_CURRENCY_POSITION property is set to a a null reference (Nothing in Visual Basic) value.

IsPROJ_OPT_CURRENCY_SYMBOLNull()

Determines whether the PROJ_OPT_CURRENCY_SYMBOL property is set to a a null reference (Nothing in Visual Basic) value.

IsPROJ_TYPENull()

Determines whether the PROJ_TYPE property is set to a a null reference (Nothing in Visual Basic) value.

IsStatusManagerNull()

Determines whether the StatusManager property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_ACT_COSTNull()

Determines whether the TASK_ACT_COST property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_ACT_DURNull()

Determines whether the TASK_ACT_DUR property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_ACT_FINISHNull()

Determines whether the TASK_ACT_FINISH property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_ACT_OVT_COSTNull()

Determines whether the TASK_ACT_OVT_COST property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_ACT_OVT_WORKNull()

Determines whether the TASK_ACT_OVT_WORK property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_ACT_STARTNull()

Determines whether the TASK_ACT_START property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_ACT_WORKNull()

Determines whether the TASK_ACT_WORK property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_ACWPNull()

Determines whether the TASK_ACWP property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_BCWPNull()

Determines whether the TASK_BCWP property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_BCWSNull()

Determines whether the TASK_BCWS property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_BUDGET_COSTNull()

Determines whether the TASK_BUDGET_COST property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_BUDGET_WORKNull()

Determines whether the TASK_BUDGET_WORK property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_CAL_UIDNull()

Determines whether the TASK_CAL_UID property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_COMPLETE_THROUGHNull()

Determines whether the TASK_COMPLETE_THROUGH property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_CONSTRAINT_DATENull()

Determines whether the TASK_CONSTRAINT_DATE property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_CONSTRAINT_TYPENull()

Determines whether the TASK_CONSTRAINT_TYPE property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_CONTACTNull()

Determines whether the TASK_CONTACT property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_COST_VARNull()

Determines whether the TASK_COST_VAR property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_COSTNull()

Determines whether the TASK_COST property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_CPINull()

Determines whether the TASK_CPI property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_CVNull()

Determines whether the TASK_CV property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_DEADLINENull()

Determines whether the TASK_DEADLINE property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_DUR_FMTNull()

Determines whether the TASK_DUR_FMT property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_DUR_IS_ESTNull()

Determines whether the TASK_DUR_IS_EST property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_DUR_TXTNull()

Determines whether the TASK_DUR_TXT property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_DUR_VARNull()

Determines whether the TASK_DUR_VAR property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_DURNull()

Determines whether the TASK_DUR property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_EACNull()

Determines whether the TASK_EAC property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_EARLY_FINISHNull()

Determines whether the TASK_EARLY_FINISH property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_EARLY_STARTNull()

Determines whether the TASK_EARLY_START property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_EVMETHODNull()

Determines whether the TASK_EVMETHOD property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_EXT_PROJ_UIDNull()

Determines whether the TASK_EXT_PROJ_UID property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_FINISH_DATENull()

Determines whether the TASK_FINISH_DATE property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_FINISH_SLACKNull()

Determines whether the TASK_FINISH_SLACK property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_FINISH_TXTNull()

Determines whether the TASK_FINISH_TXT property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_FINISH_VARNull()

Determines whether the TASK_FINISH_VAR property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_FIXED_COST_ACCRUALNull()

Determines whether the TASK_FIXED_COST_ACCRUAL property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_FIXED_COSTNull()

Determines whether the TASK_FIXED_COST property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_FREE_SLACKNull()

Determines whether the TASK_FREE_SLACK property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_HAS_LINKED_FIELDSNull()

Determines whether the TASK_HAS_LINKED_FIELDS property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_HYPERLINK_ADDRESSNull()

Determines whether the TASK_HYPERLINK_ADDRESS property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_HYPERLINK_FRIENDLY_NAMENull()

Determines whether the TASK_HYPERLINK_FRIENDLY_NAME property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_HYPERLINK_SUB_ADDRESSNull()

Determines whether the TASK_DUR property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IDNull()

Determines whether the TASK_ID property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IGNORES_RES_CALNull()

Determines whether the TASK_IGNORES_RES_CAL property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_ACTIVENull()

Determines whether the TASK_IS_ACTIVE property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_CRITICALNull()

Determines whether the TASK_IS_CRITICAL property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_DISPSUMMARYNull()

Determines whether the TASK_IS_DISPSUMMARY property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_EFFORT_DRIVENNull()

Determines whether the TASK_IS_EFFORT_DRIVEN property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_EXTERNALNull()

Determines whether the TASK_IS_EXTERNAL property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_FROM_FINISH_SUBPROJNull()

Determines whether the TASK_IS_FROM_FINISH_SUBPROJ property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_MANUALNull()

Determines whether the TASK_IS_MANUAL property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_MARKEDNull()

Determines whether the TASK_IS_MARKED property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_MILESTONENull()

Determines whether the TASK_IS_MILESTONE property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_NULLNull()

Determines whether the TASK_IS_NULL property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_OVERALLOCATEDNull()

Determines whether the TASK_IS_OVERALLOCATED property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_READONLY_SUBPROJNull()

Determines whether the TASK_IS_READONLY_SUBPROJ property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_RECURRING_SUMMARYNull()

Determines whether the TASK_IS_RECURRING_SUMMARY property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_RECURRINGNull()

Determines whether the TASK_IS_RECURRING property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_ROLLED_UPNull()

Determines whether the TASK_IS_ROLLED_UP property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_SUBPROJNull()

Determines whether the TASK_IS_SUBPROJ property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_IS_SUMMARYNull()

Determines whether the TASK_IS_SUMMARY property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_LATE_FINISHNull()

Determines whether the TASK_LATE_FINISH property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_LATE_STARTNull()

Determines whether the TASK_LATE_START property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_LEVELING_ADJUSTS_ASSNNull()

Determines whether the TASK_LEVELING_ADJUSTS_ASSN property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_LEVELING_CAN_SPLITNull()

Determines whether the TASK_LEVELING_CAN_SPLIT property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_LEVELING_DELAY_FMTNull()

Determines whether the TASK_LEVELING_DELAY_FMT property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_LEVELING_DELAYNull()

Determines whether the TASK_LEVELING_DELAY property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_NAMENull()

Determines whether the TASK_NAME property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_NOTESNull()

Determines whether the TASK_NOTES property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_OUTLINE_LEVELNull()

Determines whether the TASK_OUTLINE_LEVEL property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_OUTLINE_NUMNull()

Determines whether the TASK_OUTLINE_NUM property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_OVT_COSTNull()

Determines whether the TASK_OVT_COST property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_OVT_WORKNull()

Determines whether the TASK_OVT_WORK property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_PARENT_UIDNull()

Determines whether the TASK_PARENT_UID property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_PCT_COMPNull()

Determines whether the TASK_PCT_COMP property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_PCT_WORK_COMPNull()

Determines whether the TASK_PCT_WORK_COMP property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_PHY_PCT_COMPNull()

Determines whether the TASK_PHY_PCT_COMP property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_PRELEVELED_FINISHNull()

Determines whether the TASK_PRELEVELED_FINISH property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_PRELEVELED_STARTNull()

Determines whether the TASK_PRELEVELED_START property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_PRIORITYNull()

Determines whether the TASK_PRIORITY property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_REG_WORKNull()

Determines whether the TASK_REG_WORK property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_REM_COSTNull()

Determines whether the TASK_REM_COST property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_REM_DURNull()

Determines whether the TASK_REM_DUR property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_REM_OVT_COSTNull()

Determines whether the TASK_REM_OVT_COST property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_REM_OVT_WORKNull()

Determines whether the TASK_REM_OVT_WORK property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_REM_WORKNull()

Determines whether the TASK_REM_WORK property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_RESUME_DATENull()

Determines whether the TASK_RESUME_DATE property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_SCHED_DUR_FMTNull()

Determines whether the TASK_SCHED_DUR_FMT property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_SCHED_DURNull()

Determines whether the TASK_SCHED_DUR property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_SCHED_FINISHNull()

Determines whether the TASK_SCHED_FINISH property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_SCHED_STARTNull()

Determines whether the TASK_SCHED_START property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_SPINull()

Determines whether the WebSvcStatusing.ProjectDataSet.TaskRow.TASK_SPIN property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_START_DATENull()

Determines whether the TASK_START_DATE property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_START_SLACKNull()

Determines whether the TASK_START_SLACK property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_START_TXTNull()

Determines whether the TASK_START_TXT property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_START_VARNull()

Determines whether the TASK_START_VAR property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_STOP_DATENull()

Determines whether the TASK_STOP_DATE property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_SVNull()

Determines whether the TASK_SV property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_TCPINull()

Determines whether the TASK_TCPI property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_TOTAL_SLACKNull()

Determines whether the TASK_TOTAL_SLACK property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_TYPENull()

Determines whether the TASK_TYPE property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_VACNull()

Determines whether the TASK_VAC property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_WBSNull()

Determines whether the TASK_WBS property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_WORK_VARNull()

Determines whether the TASK_WORK_VAR property is set to a a null reference (Nothing in Visual Basic) value.

IsTASK_WORKNull()

Determines whether the TASK_WORK property is set to a a null reference (Nothing in Visual Basic) value.

IsTaskCVPNull()

Determines whether the TaskCVP property is set to a a null reference (Nothing in Visual Basic) value.

IsTaskSVPNull()

Determines whether the TaskSVP property is set to a a null reference (Nothing in Visual Basic) value.

IsTB_COSTNull()

Determines whether the TB_COST property is set to a a null reference (Nothing in Visual Basic) value.

IsTB_DUR_FMTNull()

Determines whether the TB_DUR_FMT property is set to a a null reference (Nothing in Visual Basic) value.

IsTB_DURNull()

Determines whether the TB_DUR property is set to a a null reference (Nothing in Visual Basic) value.

IsTB_FINISHNull()

Determines whether the TB_FINISH property is set to a a null reference (Nothing in Visual Basic) value.

IsTB_STARTNull()

Determines whether the TB_START property is set to a a null reference (Nothing in Visual Basic) value.

IsTB_WORKNull()

Determines whether the TB_WORK property is set to a a null reference (Nothing in Visual Basic) value.

IsWOBJ_DOC_REF_CNTNull()

Determines whether the WOBJ_DOC_REF_CNT property is set to a a null reference (Nothing in Visual Basic) value.

IsWOBJ_ISSUE_REF_CNTNull()

Determines whether the WOBJ_ISSUE_REF_CNT property is set to a a null reference (Nothing in Visual Basic) value.

IsWOBJ_OTHER_REF_CNTNull()

Determines whether the WOBJ_OTHER_REF_CNT property is set to a a null reference (Nothing in Visual Basic) value.

IsWOBJ_RISK_REF_CNTNull()

Determines whether the WOBJ_RISK_REF_CNT property is set to a a null reference (Nothing in Visual Basic) value.

SetAddAfterTaskUIDNull()

Sets the AddAfterTaskUID property to a a null reference (Nothing in Visual Basic) value.

SetAddPositionNull()

Sets the AddPosition property to a a null reference (Nothing in Visual Basic) value.

SetCREATED_DATENull()

Sets the CREATED_DATE property to a a null reference (Nothing in Visual Basic) value.

SetDurationTypeNull()

Sets the DurationType property to a a null reference (Nothing in Visual Basic) value.

SetMOD_DATENull()

Sets the MOD_DATE property to a a null reference (Nothing in Visual Basic) value.

SetPROJ_NAMENull()

Sets the PROJ_NAME property to a a null reference (Nothing in Visual Basic) value.

SetPROJ_OPT_CURRENCY_DIGITSNull()

Sets the PROJ_OPT_CURRENCY_DIGITS property to a a null reference (Nothing in Visual Basic) value.

SetPROJ_OPT_CURRENCY_POSITIONNull()

Sets the PROJ_OPT_CURRENCY_POSITION property to a a null reference (Nothing in Visual Basic) value.

SetPROJ_OPT_CURRENCY_SYMBOLNull()

Sets the PROJ_OPT_CURRENCY_SYMBOL property to a a null reference (Nothing in Visual Basic) value.

SetPROJ_TYPENull()

Sets the PROJ_TYPE property to a a null reference (Nothing in Visual Basic) value.

SetStatusManagerNull()

Sets the StatusManager property to a a null reference (Nothing in Visual Basic) value.

SetTASK_ACT_COSTNull()

Sets the TASK_ACT_COST property to a a null reference (Nothing in Visual Basic) value.

SetTASK_ACT_DURNull()

Sets the TASK_ACT_DUR property to a a null reference (Nothing in Visual Basic) value.

SetTASK_ACT_FINISHNull()

Sets the TASK_ACT_FINISH property to a a null reference (Nothing in Visual Basic) value.

SetTASK_ACT_OVT_COSTNull()

Sets the TASK_ACT_OVT_COST property to a a null reference (Nothing in Visual Basic) value.

SetTASK_ACT_OVT_WORKNull()

Sets the TASK_ACT_OVT_WORK property to a a null reference (Nothing in Visual Basic) value.

SetTASK_ACT_STARTNull()

Sets the TASK_ACT_START property to a a null reference (Nothing in Visual Basic) value.

SetTASK_ACT_WORKNull()

Sets the TASK_ACT_WORK property to a a null reference (Nothing in Visual Basic) value.

SetTASK_ACWPNull()

Sets the TASK_ACWP property to a a null reference (Nothing in Visual Basic) value.

SetTASK_BCWPNull()

Sets the TASK_BCWP property to a a null reference (Nothing in Visual Basic) value.

SetTASK_BCWSNull()

Sets the TASK_BCWS property to a a null reference (Nothing in Visual Basic) value.

SetTASK_BUDGET_COSTNull()

Sets the TASK_BUDGET_COST property to a a null reference (Nothing in Visual Basic) value.

SetTASK_BUDGET_WORKNull()

Sets the TASK_BUDGET_WORK property to a a null reference (Nothing in Visual Basic) value.

SetTASK_CAL_UIDNull()

Sets the TASK_CAL_UID property to a a null reference (Nothing in Visual Basic) value.

SetTASK_COMPLETE_THROUGHNull()

Sets the TASK_COMPLETE_THROUGH property to a a null reference (Nothing in Visual Basic) value.

SetTASK_CONSTRAINT_DATENull()

Sets the TASK_CONSTRAINT_DATE property to a a null reference (Nothing in Visual Basic) value.

SetTASK_CONSTRAINT_TYPENull()

Sets the TASK_CONSTRAINT_TYPE property to a a null reference (Nothing in Visual Basic) value.

SetTASK_CONTACTNull()

Sets the TASK_CONTACT property to a a null reference (Nothing in Visual Basic) value.

SetTASK_COST_VARNull()

Sets the TASK_COST_VAR property to a a null reference (Nothing in Visual Basic) value.

SetTASK_COSTNull()

Sets the TASK_COST property to a a null reference (Nothing in Visual Basic) value.

SetTASK_CPINull()

Sets the TASK_CPI property to a a null reference (Nothing in Visual Basic) value.

SetTASK_CVNull()

Sets the TASK_CV property to a a null reference (Nothing in Visual Basic) value.

SetTASK_DEADLINENull()

Sets the TASK_DEADLINE property to a a null reference (Nothing in Visual Basic) value.

SetTASK_DUR_FMTNull()

Sets the TASK_DUR_FMT property to a a null reference (Nothing in Visual Basic) value.

SetTASK_DUR_IS_ESTNull()

Sets the TASK_DUR_IS_EST property to a a null reference (Nothing in Visual Basic) value.

SetTASK_DUR_TXTNull()

Sets the TASK_DUR_TXT property to a a null reference (Nothing in Visual Basic) value.

SetTASK_DUR_VARNull()

Sets the TASK_DUR_VAR property to a a null reference (Nothing in Visual Basic) value.

SetTASK_DURNull()

Sets the TASK_DUR property to a a null reference (Nothing in Visual Basic) value.

SetTASK_EACNull()

Sets the TASK_EAC property to a a null reference (Nothing in Visual Basic) value.

SetTASK_EARLY_FINISHNull()

Sets the TASK_EARLY_FINISH property to a a null reference (Nothing in Visual Basic) value.

SetTASK_EARLY_STARTNull()

Sets the TASK_EARLY_START property to a a null reference (Nothing in Visual Basic) value.

SetTASK_EVMETHODNull()

Sets the TASK_EVMETHOD property to a a null reference (Nothing in Visual Basic) value.

SetTASK_EXT_PROJ_UIDNull()

Sets the TASK_EXT_PROJ_UID property to a a null reference (Nothing in Visual Basic) value.

SetTASK_FINISH_DATENull()

Sets the TASK_FINISH_DATE property to a a null reference (Nothing in Visual Basic) value.

SetTASK_FINISH_SLACKNull()

Sets the TASK_FINISH_SLACK property to a a null reference (Nothing in Visual Basic) value.

SetTASK_FINISH_TXTNull()

Sets the TASK_FINISH_TXT property to a a null reference (Nothing in Visual Basic) value.

SetTASK_FINISH_VARNull()

Sets the TASK_FINISH_VAR property to a a null reference (Nothing in Visual Basic) value.

SetTASK_FIXED_COST_ACCRUALNull()

Sets the TASK_FIXED_COST_ACCRUAL property to a a null reference (Nothing in Visual Basic) value.

SetTASK_FIXED_COSTNull()

Sets the TASK_FIXED_COST property to a a null reference (Nothing in Visual Basic) value.

SetTASK_FREE_SLACKNull()

Sets the TASK_FREE_SLACK property to a a null reference (Nothing in Visual Basic) value.

SetTASK_HAS_LINKED_FIELDSNull()

Sets the TASK_HAS_LINKED_FIELDS property to a a null reference (Nothing in Visual Basic) value.

SetTASK_HYPERLINK_ADDRESSNull()

Sets the TASK_HYPERLINK_ADDRESS property to a a null reference (Nothing in Visual Basic) value.

SetTASK_HYPERLINK_FRIENDLY_NAMENull()

Sets the TASK_HYPERLINK_FRIENDLY_NAME property to a a null reference (Nothing in Visual Basic) value.

SetTASK_HYPERLINK_SUB_ADDRESSNull()

Sets the TASK_HYPERLINK_SUB_ADDRESS property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IDNull()

Sets the TASK_ID property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IGNORES_RES_CALNull()

Sets the TASK_IGNORES_RES_CAL property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_ACTIVENull()

Sets the TASK_IS_ACTIVE property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_CRITICALNull()

Sets the TASK_IS_CRITICAL property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_DISPSUMMARYNull()

Sets the TASK_IS_DISPSUMMARY property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_EFFORT_DRIVENNull()

Sets the TASK_IS_EFFORT_DRIVEN property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_EXTERNALNull()

Sets the TASK_IS_EXTERNAL property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_FROM_FINISH_SUBPROJNull()

Sets the TASK_IS_FROM_FINISH_SUBPROJ property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_MANUALNull()

Sets the TASK_IS_MANUAL property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_MARKEDNull()

Sets the TASK_IS_MARKED property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_MILESTONENull()

Sets the TASK_IS_MILESTONE property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_NULLNull()

Sets the TASK_IS_NULL property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_OVERALLOCATEDNull()

Sets the TASK_IS_OVERALLOCATED property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_READONLY_SUBPROJNull()

Sets the TASK_IS_READONLY_SUBPROJ property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_RECURRING_SUMMARYNull()

Sets the TASK_IS_RECURRING_SUMMARY property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_RECURRINGNull()

Sets the TASK_IS_RECURRING property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_ROLLED_UPNull()

Sets the TASK_IS_ROLLED_UP property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_SUBPROJNull()

Sets the TASK_IS_SUBPROJ property to a a null reference (Nothing in Visual Basic) value.

SetTASK_IS_SUMMARYNull()

Sets the TASK_IS_SUMMARY property to a a null reference (Nothing in Visual Basic) value.

SetTASK_LATE_FINISHNull()

Sets the TASK_LATE_FINISH property to a a null reference (Nothing in Visual Basic) value.

SetTASK_LATE_STARTNull()

Sets the TASK_LATE_START property to a a null reference (Nothing in Visual Basic) value.

SetTASK_LEVELING_ADJUSTS_ASSNNull()

Sets the TASK_LEVELING_ADJUSTS_ASSN property to a a null reference (Nothing in Visual Basic) value.

SetTASK_LEVELING_CAN_SPLITNull()

Sets the TASK_LEVELING_CAN_SPLIT property to a a null reference (Nothing in Visual Basic) value.

SetTASK_LEVELING_DELAY_FMTNull()

Sets the TASK_LEVELING_DELAY_FMT property to a a null reference (Nothing in Visual Basic) value.

SetTASK_LEVELING_DELAYNull()

Sets the TASK_LEVELING_DELAY property to a a null reference (Nothing in Visual Basic) value.

SetTASK_NAMENull()

Sets the TASK_NAME property to a a null reference (Nothing in Visual Basic) value.

SetTASK_NOTESNull()

Sets the TASK_NOTES property to a a null reference (Nothing in Visual Basic) value.

SetTASK_OUTLINE_LEVELNull()

Sets the TASK_OUTLINE_LEVEL property to a a null reference (Nothing in Visual Basic) value.

SetTASK_OUTLINE_NUMNull()

Sets the TASK_OUTLINE_NUM property to a a null reference (Nothing in Visual Basic) value.

SetTASK_OVT_COSTNull()

Sets the TASK_OVT_COST property to a a null reference (Nothing in Visual Basic) value.

SetTASK_OVT_WORKNull()

Sets the TASK_OVT_WORK property to a a null reference (Nothing in Visual Basic) value.

SetTASK_PARENT_UIDNull()

Sets the TASK_PARENT_UID property to a a null reference (Nothing in Visual Basic) value.

SetTASK_PCT_COMPNull()

Sets the TASK_PCT_COMP property to a a null reference (Nothing in Visual Basic) value.

SetTASK_PCT_WORK_COMPNull()

Sets the TASK_PCT_WORK_COMP property to a a null reference (Nothing in Visual Basic) value.

SetTASK_PHY_PCT_COMPNull()

Sets the WebSvcStatusing.ProjectDataSet.TaskRow.TASK_PSY_PCT_COMP property to a a null reference (Nothing in Visual Basic) value.

SetTASK_PRELEVELED_FINISHNull()

Sets the TASK_PRELEVELED_FINISH property to a a null reference (Nothing in Visual Basic) value.

SetTASK_PRELEVELED_STARTNull()

Sets the TASK_PRELEVELED_START property to a a null reference (Nothing in Visual Basic) value.

SetTASK_PRIORITYNull()

Sets the TASK_PRIORITY property to a a null reference (Nothing in Visual Basic) value.

SetTASK_REG_WORKNull()

Sets the TASK_REG_WORK property to a a null reference (Nothing in Visual Basic) value.

SetTASK_REM_COSTNull()

Sets the TASK_REM_COST property to a a null reference (Nothing in Visual Basic) value.

SetTASK_REM_DURNull()

Sets the TASK_REM_DUR property to a a null reference (Nothing in Visual Basic) value.

SetTASK_REM_OVT_COSTNull()

Sets the TASK_REM_OVT_COST property to a a null reference (Nothing in Visual Basic) value.

SetTASK_REM_OVT_WORKNull()

Sets the TASK_REM_OVT_WORK property to a a null reference (Nothing in Visual Basic) value.

SetTASK_REM_WORKNull()

Sets the TASK_REM_WORK property to a a null reference (Nothing in Visual Basic) value.

SetTASK_RESUME_DATENull()

Sets the TASK_RESUME_DATE property to a a null reference (Nothing in Visual Basic) value.

SetTASK_SCHED_DUR_FMTNull()

Sets the TASK_SCHED_DUR_FMT property to a a null reference (Nothing in Visual Basic) value.

SetTASK_SCHED_DURNull()

Sets the TASK_SCHED_DUR property to a a null reference (Nothing in Visual Basic) value.

SetTASK_SCHED_FINISHNull()

Sets the TASK_SCHED_FINISH property to a a null reference (Nothing in Visual Basic) value.

SetTASK_SCHED_STARTNull()

Sets the TASK_SCHED_START property to a a null reference (Nothing in Visual Basic) value.

SetTASK_SPINull()

Sets the TASK_SPI property to a a null reference (Nothing in Visual Basic) value.

SetTASK_START_DATENull()

Sets the TASK_START_DATE property to a a null reference (Nothing in Visual Basic) value.

SetTASK_START_SLACKNull()

Sets the TASK_START_SLACK property to a a null reference (Nothing in Visual Basic) value.

SetTASK_START_TXTNull()

Sets the TASK_START_TXT property to a a null reference (Nothing in Visual Basic) value.

SetTASK_START_VARNull()

Sets the TASK_START_VAR property to a a null reference (Nothing in Visual Basic) value.

SetTASK_STOP_DATENull()

Sets the TASK_STOP_DATE property to a a null reference (Nothing in Visual Basic) value.

SetTASK_SVNull()

Sets the TASK_SV property to a a null reference (Nothing in Visual Basic) value.

SetTASK_TCPINull()

Sets the TASK_TCPI property to a a null reference (Nothing in Visual Basic) value.

SetTASK_TOTAL_SLACKNull()

Sets the TASK_TOTAL_SLACK property to a a null reference (Nothing in Visual Basic) value.

SetTASK_TYPENull()

Sets the TASK_TYPE property to a a null reference (Nothing in Visual Basic) value.

SetTASK_VACNull()

Sets the TASK_VAC property to a a null reference (Nothing in Visual Basic) value.

SetTASK_WBSNull()

Sets the TASK_WBS property to a a null reference (Nothing in Visual Basic) value.

SetTASK_WORK_VARNull()

Sets the TASK_WORK_VAR property to a a null reference (Nothing in Visual Basic) value.

SetTASK_WORKNull()

Sets the TASK_WORK property to a a null reference (Nothing in Visual Basic) value.

SetTaskCVPNull()

Sets the TaskCVP property to a a null reference (Nothing in Visual Basic) value.

SetTaskSVPNull()

Sets the TaskSVP property to a a null reference (Nothing in Visual Basic) value.

SetTB_COSTNull()

Sets the TB_COST property to a a null reference (Nothing in Visual Basic) value.

SetTB_DUR_FMTNull()

Sets the TB_DUR_FMT property to a a null reference (Nothing in Visual Basic) value.

SetTB_DURNull()

Sets the TB_DUR property to a a null reference (Nothing in Visual Basic) value.

SetTB_FINISHNull()

Sets the TB_FINISH property to a a null reference (Nothing in Visual Basic) value.

SetTB_STARTNull()

Sets the TB_START property to a a null reference (Nothing in Visual Basic) value.

SetTB_WORKNull()

Sets the TB_WORK property to a a null reference (Nothing in Visual Basic) value.

SetWOBJ_DOC_REF_CNTNull()

Sets the WOBJ_DOC_REF_CNT property to a a null reference (Nothing in Visual Basic) value.

SetWOBJ_ISSUE_REF_CNTNull()

Sets the WOBJ_ISSUE_REF_CNT property to a a null reference (Nothing in Visual Basic) value.

SetWOBJ_OTHER_REF_CNTNull()

Sets the WOBJ_OTHER_REF_CNT property to a a null reference (Nothing in Visual Basic) value.

SetWOBJ_RISK_REF_CNTNull()

Sets the WOBJ_RISK_REF_CNT property to a a null reference (Nothing in Visual Basic) value.