Baseline Element
This content is outdated and is no longer being maintained. It is provided as a courtesy for individuals who are still using these technologies. This page may contain URLs that were valid when originally published, but now link to sites or pages that no longer exist.
The collection of baseline values associated with the task, resource or assignment.
<Baseline>
ComplexTypeValue
</Baseline>
Parent Elements
Child Elements for a Task
Element |
Required/Optional |
Description |
---|---|---|
Optional |
The timephased data block associated with the task baseline. |
|
Required |
The unique number of the baseline data record. |
|
Optional |
Indicates whether the baseline is an interim baseline. |
|
Optional |
The scheduled start date of the task when the baseline was saved. |
|
Optional |
The scheduled finish date of the task when the baseline was saved. |
|
Optional |
The scheduled duration of the task when the baseline was saved. |
|
Optional |
The format for expressing the duration of the task baseline. |
|
Optional |
Indicates whether the duration of the task is estimated. |
|
Optional |
The scheduled work for the task when the baseline was saved. |
|
Optional |
The projected cost of the task when the baseline was saved. |
|
Optional |
BCWS is the budgeted cost of work scheduled. The cumulative timephased baseline costs up to the status date or today's date. |
|
Optional |
BCWP is the budgeted cost of work performed. The cumulative value of the task's timephased percent complete multiplied by the task's timephased baseline cost, up to the status date or today's date. |
|
Optional |
New for Baseline in Project 2007. The fixed cost of the task when the baseline was saved. |
Child Elements for a Resource
Element |
Required/Optional |
Description |
---|---|---|
Required |
The unique number of the baseline data record. |
|
Optional |
The work assigned to the resource when the baseline is saved. |
|
Optional |
The projected cost for the resource when the baseline was saved. |
|
Optional |
The budgeted cost of work scheduled for the resource. |
|
Optional |
The budgeted cost of the work performed by the resource on the project to-date. |
Child Elements for an Assignment
Element |
Required/Optional |
Description |
---|---|---|
Optional |
The timephased data block associated with the task baseline. |
|
Required |
The unique number of the baseline data record. |
|
Optional |
The scheduled start date of the assignment when the baseline was saved. |
|
Optional |
The scheduled finish date of the assignment when the baseline was saved. |
|
Optional |
The total amount of work scheduled on the assignment when the baseline was saved. |
|
Optional |
The total projected cost of the assignment when the baseline was saved. |
|
Optional |
The budgeted cost of work scheduled on the assignment. |
|
Optional |
The budgeted cost of the work performed on the assignment to date. |
Occurrences
Minimum: 0 Maximum: Unbounded |
See Also
Concepts
Task Elements and XML Structure
XML Schema for the Tasks Element
Resource Elements and XML Structure
XML Schema for the Resources Element