Groups2 Interface
Definition
Important
Some information relates to prerelease product that may be substantially modified before it’s released. Microsoft makes no warranties, express or implied, with respect to the information provided here.
public interface class Groups2 : System::Collections::IEnumerable
[System.Runtime.InteropServices.Guid("11589059-69F0-11D2-B889-00C04FB90729")]
public interface Groups2 : System.Collections.IEnumerable
type Groups2 = interface
interface IEnumerable
Public Interface Groups2
Implements IEnumerable
- Attributes
- Implements
Properties
Application | |
Count | |
Item[Object] | |
Parent |
Methods
Add(String, String) | |
Copy(String, String) | |
GetEnumerator() |
Applies to
Saran dan Komentar
https://aka.ms/ContentUserFeedback.
Segera hadir: Sepanjang tahun 2024 kami akan menghentikan penggunaan GitHub Issues sebagai mekanisme umpan balik untuk konten dan menggantinya dengan sistem umpan balik baru. Untuk mengetahui informasi selengkapnya, lihat:Kirim dan lihat umpan balik untuk