PjField Enum
Definition
Important
Some information relates to prerelease product that may be substantially modified before it’s released. Microsoft makes no warranties, express or implied, with respect to the information provided here.
public enum class PjField
[System.Runtime.InteropServices.Guid("DD3D3A50-919A-11CF-982C-00AA00322803")]
public enum PjField
type PjField =
Public Enum PjField
- Inheritance
-
PjField
- Attributes
Fields
pjImportResource | 205521651 | |
pjResourceAccrueAt | 205520915 | |
pjResourceActualCost | 205520907 | |
pjResourceActualOvertimeCost | 205520944 | |
pjResourceActualOvertimeWork | 205520935 | |
pjResourceActualOvertimeWorkProtected | 205521617 | |
pjResourceActualWork | 205520910 | |
pjResourceActualWorkProtected | 205521616 | |
pjResourceACWP | 205520949 | |
pjResourceAssignmentDelay | 205521153 | |
pjResourceAssignmentUnits | 205521154 | |
pjResourceAvailableFrom | 205520953 | |
pjResourceAvailableTo | 205520954 | |
pjResourceBaseCalendar | 205520901 | |
pjResourceBaseline10BudgetCost | 205521693 | |
pjResourceBaseline10BudgetWork | 205521692 | |
pjResourceBaseline10Cost | 205521329 | |
pjResourceBaseline10Finish | 205521335 | |
pjResourceBaseline10Start | 205521334 | |
pjResourceBaseline10Work | 205521328 | |
pjResourceBaseline1BudgetCost | 205521657 | |
pjResourceBaseline1BudgetWork | 205521656 | |
pjResourceBaseline1Cost | 205521239 | |
pjResourceBaseline1Finish | 205521245 | |
pjResourceBaseline1Start | 205521244 | |
pjResourceBaseline1Work | 205521238 | |
pjResourceBaseline2BudgetCost | 205521661 | |
pjResourceBaseline2BudgetWork | 205521660 | |
pjResourceBaseline2Cost | 205521249 | |
pjResourceBaseline2Finish | 205521255 | |
pjResourceBaseline2Start | 205521254 | |
pjResourceBaseline2Work | 205521248 | |
pjResourceBaseline3BudgetCost | 205521665 | |
pjResourceBaseline3BudgetWork | 205521664 | |
pjResourceBaseline3Cost | 205521259 | |
pjResourceBaseline3Finish | 205521265 | |
pjResourceBaseline3Start | 205521264 | |
pjResourceBaseline3Work | 205521258 | |
pjResourceBaseline4BudgetCost | 205521669 | |
pjResourceBaseline4BudgetWork | 205521668 | |
pjResourceBaseline4Cost | 205521269 | |
pjResourceBaseline4Finish | 205521275 | |
pjResourceBaseline4Start | 205521274 | |
pjResourceBaseline4Work | 205521268 | |
pjResourceBaseline5BudgetCost | 205521673 | |
pjResourceBaseline5BudgetWork | 205521672 | |
pjResourceBaseline5Cost | 205521279 | |
pjResourceBaseline5Finish | 205521285 | |
pjResourceBaseline5Start | 205521284 | |
pjResourceBaseline5Work | 205521278 | |
pjResourceBaseline6BudgetCost | 205521677 | |
pjResourceBaseline6BudgetWork | 205521676 | |
pjResourceBaseline6Cost | 205521289 | |
pjResourceBaseline6Finish | 205521295 | |
pjResourceBaseline6Start | 205521294 | |
pjResourceBaseline6Work | 205521288 | |
pjResourceBaseline7BudgetCost | 205521681 | |
pjResourceBaseline7BudgetWork | 205521680 | |
pjResourceBaseline7Cost | 205521299 | |
pjResourceBaseline7Finish | 205521305 | |
pjResourceBaseline7Start | 205521304 | |
pjResourceBaseline7Work | 205521298 | |
pjResourceBaseline8BudgetCost | 205521685 | |
pjResourceBaseline8BudgetWork | 205521684 | |
pjResourceBaseline8Cost | 205521309 | |
pjResourceBaseline8Finish | 205521315 | |
pjResourceBaseline8Start | 205521314 | |
pjResourceBaseline8Work | 205521308 | |
pjResourceBaseline9BudgetCost | 205521689 | |
pjResourceBaseline9BudgetWork | 205521688 | |
pjResourceBaseline9Cost | 205521319 | |
pjResourceBaseline9Finish | 205521325 | |
pjResourceBaseline9Start | 205521324 | |
pjResourceBaseline9Work | 205521318 | |
pjResourceBaselineBudgetCost | 205521653 | |
pjResourceBaselineBudgetWork | 205521652 | |
pjResourceBaselineCost | 205520913 | |
pjResourceBaselineFinish | 205521156 | |
pjResourceBaselineStart | 205521155 | |
pjResourceBaselineWork | 205520911 | |
pjResourceBCWP | 205520948 | |
pjResourceBCWS | 205520947 | |
pjResourceBookingType | 205521595 | |
pjResourceBudget | 205521648 | |
pjResourceBudgetCost | 205521650 | |
pjResourceBudgetWork | 205521649 | |
pjResourceCalendarGuid | 205521625 | |
pjResourceCanLevel | 205521059 | |
pjResourceCode | 205520906 | |
pjResourceConfirmed | 205521157 | |
pjResourceCost | 205520908 | |
pjResourceCost1 | 205521019 | |
pjResourceCost10 | 205521068 | |
pjResourceCost2 | 205521020 | |
pjResourceCost3 | 205521021 | |
pjResourceCost4 | 205521062 | |
pjResourceCost5 | 205521063 | |
pjResourceCost6 | 205521064 | |
pjResourceCost7 | 205521065 | |
pjResourceCost8 | 205521066 | |
pjResourceCost9 | 205521067 | |
pjResourceCostCenter | 205521697 | |
pjResourceCostPerUse | 205520914 | |
pjResourceCostRateTable | 205521165 | |
pjResourceCostVariance | 205520920 | |
pjResourceCreated | 205521622 | |
pjResourceCV | 205521164 | |
pjResourceDate1 | 205521069 | |
pjResourceDate10 | 205521078 | |
pjResourceDate2 | 205521070 | |
pjResourceDate3 | 205521071 | |
pjResourceDate4 | 205521072 | |
pjResourceDate5 | 205521073 | |
pjResourceDate6 | 205521074 | |
pjResourceDate7 | 205521075 | |
pjResourceDate8 | 205521076 | |
pjResourceDate9 | 205521077 | |
pjResourceDefaultAssignmentOwner | 205521636 | |
pjResourceDemandedRequested | 205521586 | |
pjResourceDuration1 | 205521013 | |
pjResourceDuration10 | 205521085 | |
pjResourceDuration2 | 205521014 | |
pjResourceDuration3 | 205521015 | |
pjResourceDuration4 | 205521079 | |
pjResourceDuration5 | 205521080 | |
pjResourceDuration6 | 205521081 | |
pjResourceDuration7 | 205521082 | |
pjResourceDuration8 | 205521083 | |
pjResourceDuration9 | 205521084 | |
pjResourceEMailAddress | 205520931 | |
pjResourceEnterprise | 205521587 | |
pjResourceEnterpriseBaseCalendar | 205521583 | |
pjResourceEnterpriseCheckedOutBy | 205521589 | |
pjResourceEnterpriseCost1 | 205521342 | |
pjResourceEnterpriseCost10 | 205521351 | |
pjResourceEnterpriseCost2 | 205521343 | |
pjResourceEnterpriseCost3 | 205521344 | |
pjResourceEnterpriseCost4 | 205521345 | |
pjResourceEnterpriseCost5 | 205521346 | |
pjResourceEnterpriseCost6 | 205521347 | |
pjResourceEnterpriseCost7 | 205521348 | |
pjResourceEnterpriseCost8 | 205521349 | |
pjResourceEnterpriseCost9 | 205521350 | |
pjResourceEnterpriseDate1 | 205521352 | |
pjResourceEnterpriseDate10 | 205521361 | |
pjResourceEnterpriseDate11 | 205521362 | |
pjResourceEnterpriseDate12 | 205521363 | |
pjResourceEnterpriseDate13 | 205521364 | |
pjResourceEnterpriseDate14 | 205521365 | |
pjResourceEnterpriseDate15 | 205521366 | |
pjResourceEnterpriseDate16 | 205521367 | |
pjResourceEnterpriseDate17 | 205521368 | |
pjResourceEnterpriseDate18 | 205521369 | |
pjResourceEnterpriseDate19 | 205521370 | |
pjResourceEnterpriseDate2 | 205521353 | |
pjResourceEnterpriseDate20 | 205521371 | |
pjResourceEnterpriseDate21 | 205521372 | |
pjResourceEnterpriseDate22 | 205521373 | |
pjResourceEnterpriseDate23 | 205521374 | |
pjResourceEnterpriseDate24 | 205521375 | |
pjResourceEnterpriseDate25 | 205521376 | |
pjResourceEnterpriseDate26 | 205521377 | |
pjResourceEnterpriseDate27 | 205521378 | |
pjResourceEnterpriseDate28 | 205521379 | |
pjResourceEnterpriseDate29 | 205521380 | |
pjResourceEnterpriseDate3 | 205521354 | |
pjResourceEnterpriseDate30 | 205521381 | |
pjResourceEnterpriseDate4 | 205521355 | |
pjResourceEnterpriseDate5 | 205521356 | |
pjResourceEnterpriseDate6 | 205521357 | |
pjResourceEnterpriseDate7 | 205521358 | |
pjResourceEnterpriseDate8 | 205521359 | |
pjResourceEnterpriseDate9 | 205521360 | |
pjResourceEnterpriseDuration1 | 205521382 | |
pjResourceEnterpriseDuration10 | 205521391 | |
pjResourceEnterpriseDuration2 | 205521383 | |
pjResourceEnterpriseDuration3 | 205521384 | |
pjResourceEnterpriseDuration4 | 205521385 | |
pjResourceEnterpriseDuration5 | 205521386 | |
pjResourceEnterpriseDuration6 | 205521387 | |
pjResourceEnterpriseDuration7 | 205521388 | |
pjResourceEnterpriseDuration8 | 205521389 | |
pjResourceEnterpriseDuration9 | 205521390 | |
pjResourceEnterpriseFlag1 | 205521402 | |
pjResourceEnterpriseFlag10 | 205521411 | |
pjResourceEnterpriseFlag11 | 205521412 | |
pjResourceEnterpriseFlag12 | 205521413 | |
pjResourceEnterpriseFlag13 | 205521414 | |
pjResourceEnterpriseFlag14 | 205521415 | |
pjResourceEnterpriseFlag15 | 205521416 | |
pjResourceEnterpriseFlag16 | 205521417 | |
pjResourceEnterpriseFlag17 | 205521418 | |
pjResourceEnterpriseFlag18 | 205521419 | |
pjResourceEnterpriseFlag19 | 205521420 | |
pjResourceEnterpriseFlag2 | 205521403 | |
pjResourceEnterpriseFlag20 | 205521421 | |
pjResourceEnterpriseFlag3 | 205521404 | |
pjResourceEnterpriseFlag4 | 205521405 | |
pjResourceEnterpriseFlag5 | 205521406 | |
pjResourceEnterpriseFlag6 | 205521407 | |
pjResourceEnterpriseFlag7 | 205521408 | |
pjResourceEnterpriseFlag8 | 205521409 | |
pjResourceEnterpriseFlag9 | 205521410 | |
pjResourceEnterpriseGeneric | 205521582 | |
pjResourceEnterpriseInactive | 205521592 | |
pjResourceEnterpriseIsCheckedOut | 205521588 | |
pjResourceEnterpriseLastModifiedDate | 205521590 | |
pjResourceEnterpriseMultiValue20 | 205521596 | |
pjResourceEnterpriseMultiValue21 | 205521598 | |
pjResourceEnterpriseMultiValue22 | 205521600 | |
pjResourceEnterpriseMultiValue23 | 205521602 | |
pjResourceEnterpriseMultiValue24 | 205521604 | |
pjResourceEnterpriseMultiValue25 | 205521606 | |
pjResourceEnterpriseMultiValue26 | 205521608 | |
pjResourceEnterpriseMultiValue27 | 205521610 | |
pjResourceEnterpriseMultiValue28 | 205521612 | |
pjResourceEnterpriseMultiValue29 | 205521614 | |
pjResourceEnterpriseNameUsed | 205521585 | |
pjResourceEnterpriseNumber1 | 205521442 | |
pjResourceEnterpriseNumber10 | 205521451 | |
pjResourceEnterpriseNumber11 | 205521452 | |
pjResourceEnterpriseNumber12 | 205521453 | |
pjResourceEnterpriseNumber13 | 205521454 | |
pjResourceEnterpriseNumber14 | 205521455 | |
pjResourceEnterpriseNumber15 | 205521456 | |
pjResourceEnterpriseNumber16 | 205521457 | |
pjResourceEnterpriseNumber17 | 205521458 | |
pjResourceEnterpriseNumber18 | 205521459 | |
pjResourceEnterpriseNumber19 | 205521460 | |
pjResourceEnterpriseNumber2 | 205521443 | |
pjResourceEnterpriseNumber20 | 205521461 | |
pjResourceEnterpriseNumber21 | 205521462 | |
pjResourceEnterpriseNumber22 | 205521463 | |
pjResourceEnterpriseNumber23 | 205521464 | |
pjResourceEnterpriseNumber24 | 205521465 | |
pjResourceEnterpriseNumber25 | 205521466 | |
pjResourceEnterpriseNumber26 | 205521467 | |
pjResourceEnterpriseNumber27 | 205521468 | |
pjResourceEnterpriseNumber28 | 205521469 | |
pjResourceEnterpriseNumber29 | 205521470 | |
pjResourceEnterpriseNumber3 | 205521444 | |
pjResourceEnterpriseNumber30 | 205521471 | |
pjResourceEnterpriseNumber31 | 205521472 | |
pjResourceEnterpriseNumber32 | 205521473 | |
pjResourceEnterpriseNumber33 | 205521474 | |
pjResourceEnterpriseNumber34 | 205521475 | |
pjResourceEnterpriseNumber35 | 205521476 | |
pjResourceEnterpriseNumber36 | 205521477 | |
pjResourceEnterpriseNumber37 | 205521478 | |
pjResourceEnterpriseNumber38 | 205521479 | |
pjResourceEnterpriseNumber39 | 205521480 | |
pjResourceEnterpriseNumber4 | 205521445 | |
pjResourceEnterpriseNumber40 | 205521481 | |
pjResourceEnterpriseNumber5 | 205521446 | |
pjResourceEnterpriseNumber6 | 205521447 | |
pjResourceEnterpriseNumber7 | 205521448 | |
pjResourceEnterpriseNumber8 | 205521449 | |
pjResourceEnterpriseNumber9 | 205521450 | |
pjResourceEnterpriseOutlineCode1 | 205521482 | |
pjResourceEnterpriseOutlineCode10 | 205521500 | |
pjResourceEnterpriseOutlineCode11 | 205521502 | |
pjResourceEnterpriseOutlineCode12 | 205521504 | |
pjResourceEnterpriseOutlineCode13 | 205521506 | |
pjResourceEnterpriseOutlineCode14 | 205521508 | |
pjResourceEnterpriseOutlineCode15 | 205521510 | |
pjResourceEnterpriseOutlineCode16 | 205521512 | |
pjResourceEnterpriseOutlineCode17 | 205521514 | |
pjResourceEnterpriseOutlineCode18 | 205521516 | |
pjResourceEnterpriseOutlineCode19 | 205521518 | |
pjResourceEnterpriseOutlineCode2 | 205521484 | |
pjResourceEnterpriseOutlineCode20 | 205521520 | |
pjResourceEnterpriseOutlineCode21 | 205521522 | |
pjResourceEnterpriseOutlineCode22 | 205521524 | |
pjResourceEnterpriseOutlineCode23 | 205521526 | |
pjResourceEnterpriseOutlineCode24 | 205521528 | |
pjResourceEnterpriseOutlineCode25 | 205521530 | |
pjResourceEnterpriseOutlineCode26 | 205521532 | |
pjResourceEnterpriseOutlineCode27 | 205521534 | |
pjResourceEnterpriseOutlineCode28 | 205521536 | |
pjResourceEnterpriseOutlineCode29 | 205521538 | |
pjResourceEnterpriseOutlineCode3 | 205521486 | |
pjResourceEnterpriseOutlineCode4 | 205521488 | |
pjResourceEnterpriseOutlineCode5 | 205521490 | |
pjResourceEnterpriseOutlineCode6 | 205521492 | |
pjResourceEnterpriseOutlineCode7 | 205521494 | |
pjResourceEnterpriseOutlineCode8 | 205521496 | |
pjResourceEnterpriseOutlineCode9 | 205521498 | |
pjResourceEnterpriseRBS | 205521540 | |
pjResourceEnterpriseRequiredValues | 205521584 | |
pjResourceEnterpriseTeamMember | 205521591 | |
pjResourceEnterpriseText1 | 205521542 | |
pjResourceEnterpriseText10 | 205521551 | |
pjResourceEnterpriseText11 | 205521552 | |
pjResourceEnterpriseText12 | 205521553 | |
pjResourceEnterpriseText13 | 205521554 | |
pjResourceEnterpriseText14 | 205521555 | |
pjResourceEnterpriseText15 | 205521556 | |
pjResourceEnterpriseText16 | 205521557 | |
pjResourceEnterpriseText17 | 205521558 | |
pjResourceEnterpriseText18 | 205521559 | |
pjResourceEnterpriseText19 | 205521560 | |
pjResourceEnterpriseText2 | 205521543 | |
pjResourceEnterpriseText20 | 205521561 | |
pjResourceEnterpriseText21 | 205521562 | |
pjResourceEnterpriseText22 | 205521563 | |
pjResourceEnterpriseText23 | 205521564 | |
pjResourceEnterpriseText24 | 205521565 | |
pjResourceEnterpriseText25 | 205521566 | |
pjResourceEnterpriseText26 | 205521567 | |
pjResourceEnterpriseText27 | 205521568 | |
pjResourceEnterpriseText28 | 205521569 | |
pjResourceEnterpriseText29 | 205521570 | |
pjResourceEnterpriseText3 | 205521544 | |
pjResourceEnterpriseText30 | 205521571 | |
pjResourceEnterpriseText31 | 205521572 | |
pjResourceEnterpriseText32 | 205521573 | |
pjResourceEnterpriseText33 | 205521574 | |
pjResourceEnterpriseText34 | 205521575 | |
pjResourceEnterpriseText35 | 205521576 | |
pjResourceEnterpriseText36 | 205521577 | |
pjResourceEnterpriseText37 | 205521578 | |
pjResourceEnterpriseText38 | 205521579 | |
pjResourceEnterpriseText39 | 205521580 | |
pjResourceEnterpriseText4 | 205521545 | |
pjResourceEnterpriseText40 | 205521581 | |
pjResourceEnterpriseText5 | 205521546 | |
pjResourceEnterpriseText6 | 205521547 | |
pjResourceEnterpriseText7 | 205521548 | |
pjResourceEnterpriseText8 | 205521549 | |
pjResourceEnterpriseText9 | 205521550 | |
pjResourceEnterpriseUniqueID | 205521339 | |
pjResourceErrorMessage | 205521634 | |
pjResourceFinish | 205521158 | |
pjResourceFinish1 | 205521003 | |
pjResourceFinish10 | 205521090 | |
pjResourceFinish2 | 205521004 | |
pjResourceFinish3 | 205521005 | |
pjResourceFinish4 | 205521006 | |
pjResourceFinish5 | 205521007 | |
pjResourceFinish6 | 205521086 | |
pjResourceFinish7 | 205521087 | |
pjResourceFinish8 | 205521088 | |
pjResourceFinish9 | 205521089 | |
pjResourceFlag1 | 205521023 | |
pjResourceFlag10 | 205521022 | |
pjResourceFlag11 | 205521091 | |
pjResourceFlag12 | 205521092 | |
pjResourceFlag13 | 205521093 | |
pjResourceFlag14 | 205521094 | |
pjResourceFlag15 | 205521095 | |
pjResourceFlag16 | 205521096 | |
pjResourceFlag17 | 205521097 | |
pjResourceFlag18 | 205521098 | |
pjResourceFlag19 | 205521099 | |
pjResourceFlag2 | 205521024 | |
pjResourceFlag20 | 205521100 | |
pjResourceFlag3 | 205521025 | |
pjResourceFlag4 | 205521026 | |
pjResourceFlag5 | 205521027 | |
pjResourceFlag6 | 205521028 | |
pjResourceFlag7 | 205521029 | |
pjResourceFlag8 | 205521030 | |
pjResourceFlag9 | 205521031 | |
pjResourceGroup | 205520899 | |
pjResourceGroupbySummary | 205521202 | |
pjResourceGuid | 205521624 | |
pjResourceHyperlink | 205521034 | |
pjResourceHyperlinkAddress | 205521035 | |
pjResourceHyperlinkHref | 205521037 | |
pjResourceHyperlinkScreenTip | 205521208 | |
pjResourceHyperlinkSubAddress | 205521036 | |
pjResourceID | 205520896 | |
pjResourceIndex | 205521149 | |
pjResourceIndicators | 205520982 | |
pjResourceInitials | 205520898 | |
pjResourceIsAssignment | 205521040 | |
pjResourceIsTeam | 205521696 | |
pjResourceLevelingDelay | 205521159 | |
pjResourceLinkedFields | 205520930 | |
pjResourceMaterialLabel | 205521195 | |
pjResourceMaxUnits | 205520900 | |
pjResourceName | 205520897 | |
pjResourceNotes | 205520916 | |
pjResourceNumber1 | 205521008 | |
pjResourceNumber10 | 205521105 | |
pjResourceNumber11 | 205521106 | |
pjResourceNumber12 | 205521107 | |
pjResourceNumber13 | 205521108 | |
pjResourceNumber14 | 205521109 | |
pjResourceNumber15 | 205521110 | |
pjResourceNumber16 | 205521111 | |
pjResourceNumber17 | 205521112 | |
pjResourceNumber18 | 205521113 | |
pjResourceNumber19 | 205521114 | |
pjResourceNumber2 | 205521009 | |
pjResourceNumber20 | 205521115 | |
pjResourceNumber3 | 205521010 | |
pjResourceNumber4 | 205521011 | |
pjResourceNumber5 | 205521012 | |
pjResourceNumber6 | 205521101 | |
pjResourceNumber7 | 205521102 | |
pjResourceNumber8 | 205521103 | |
pjResourceNumber9 | 205521104 | |
pjResourceObjects | 205520929 | |
pjResourceOutlineCode1 | 205521174 | |
pjResourceOutlineCode10 | 205521192 | |
pjResourceOutlineCode2 | 205521176 | |
pjResourceOutlineCode3 | 205521178 | |
pjResourceOutlineCode4 | 205521180 | |
pjResourceOutlineCode5 | 205521182 | |
pjResourceOutlineCode6 | 205521184 | |
pjResourceOutlineCode7 | 205521186 | |
pjResourceOutlineCode8 | 205521188 | |
pjResourceOutlineCode9 | 205521190 | |
pjResourceOverallocated | 205520921 | |
pjResourceOvertimeCost | 205520943 | |
pjResourceOvertimeRate | 205520903 | |
pjResourceOvertimeWork | 205520912 | |
pjResourcePeakUnits | 205520922 | |
pjResourcePercentWorkComplete | 205520925 | |
pjResourcePhonetics | 205521148 | |
pjResourceProject | 205521169 | |
pjResourceRegularWork | 205520934 | |
pjResourceRemainingCost | 205520917 | |
pjResourceRemainingOvertimeCost | 205520945 | |
pjResourceRemainingOvertimeWork | 205520936 | |
pjResourceRemainingWork | 205520918 | |
pjResourceResponsePending | 205521160 | |
pjResourceSheetNotes | 205520924 | |
pjResourceStandardRate | 205520902 | |
pjResourceStart | 205521161 | |
pjResourceStart1 | 205520998 | |
pjResourceStart10 | 205521120 | |
pjResourceStart2 | 205520999 | |
pjResourceStart3 | 205521000 | |
pjResourceStart4 | 205521001 | |
pjResourceStart5 | 205521002 | |
pjResourceStart6 | 205521116 | |
pjResourceStart7 | 205521117 | |
pjResourceStart8 | 205521118 | |
pjResourceStart9 | 205521119 | |
pjResourceSV | 205520950 | |
pjResourceTaskSummaryName | 205521055 | |
pjResourceTeamStatusPending | 205521162 | |
pjResourceText1 | 205520904 | |
pjResourceText10 | 205520997 | |
pjResourceText11 | 205521121 | |
pjResourceText12 | 205521122 | |
pjResourceText13 | 205521123 | |
pjResourceText14 | 205521124 | |
pjResourceText15 | 205521125 | |
pjResourceText16 | 205521126 | |
pjResourceText17 | 205521127 | |
pjResourceText18 | 205521128 | |
pjResourceText19 | 205521129 | |
pjResourceText2 | 205520905 | |
pjResourceText20 | 205521130 | |
pjResourceText21 | 205521131 | |
pjResourceText22 | 205521132 | |
pjResourceText23 | 205521133 | |
pjResourceText24 | 205521134 | |
pjResourceText25 | 205521135 | |
pjResourceText26 | 205521136 | |
pjResourceText27 | 205521137 | |
pjResourceText28 | 205521138 | |
pjResourceText29 | 205521139 | |
pjResourceText3 | 205520926 | |
pjResourceText30 | 205521140 | |
pjResourceText4 | 205520927 | |
pjResourceText5 | 205520928 | |
pjResourceText6 | 205520993 | |
pjResourceText7 | 205520994 | |
pjResourceText8 | 205520995 | |
pjResourceText9 | 205520996 | |
pjResourceType | 205521196 | |
pjResourceUniqueID | 205520923 | |
pjResourceUpdateNeeded | 205521163 | |
pjResourceVAC | 205521197 | |
pjResourceWBS | 205521236 | |
pjResourceWindowsUserAccount | 205521207 | |
pjResourceWork | 205520909 | |
pjResourceWorkContour | 205521060 | |
pjResourceWorkgroup | 205521168 | |
pjResourceWorkVariance | 205520919 | |
pjTaskActive | 188744959 | |
pjTaskActualCost | 188743687 | |
pjTaskActualDuration | 188743708 | |
pjTaskActualFinish | 188743722 | |
pjTaskActualOvertimeCost | 188743849 | |
pjTaskActualOvertimeWork | 188743844 | |
pjTaskActualOvertimeWorkProtected | 188744820 | |
pjTaskActualStart | 188743721 | |
pjTaskActualWork | 188743682 | |
pjTaskActualWorkProtected | 188744819 | |
pjTaskACWP | 188743800 | |
pjTaskAssignmentDelay | 188744046 | |
pjTaskAssignmentPeakUnits | 188745015 | |
pjTaskAssignmentUnits | 188744047 | |
pjTaskBaseline10BudgetCost | 188744927 | |
pjTaskBaseline10BudgetWork | 188744926 | |
pjTaskBaseline10Cost | 188744270 | |
pjTaskBaseline10DeliverableFinish | 188744925 | |
pjTaskBaseline10DeliverableStart | 188744924 | |
pjTaskBaseline10Duration | 188744273 | |
pjTaskBaseline10DurationEstimated | 188744528 | |
pjTaskBaseline10DurationText | 188745011 | |
pjTaskBaseline10Finish | 188744269 | |
pjTaskBaseline10FinishText | 188745010 | |
pjTaskBaseline10FixedCostAccrual | 188744923 | |
pjTaskBaseline10Start | 188744268 | |
pjTaskBaseline10StartText | 188745009 | |
pjTaskBaseline10Work | 188744271 | |
pjTaskBaseline1BudgetCost | 188744864 | |
pjTaskBaseline1BudgetWork | 188744863 | |
pjTaskBaseline1Cost | 188744164 | |
pjTaskBaseline1DeliverableFinish | 188744862 | |
pjTaskBaseline1DeliverableStart | 188744861 | |
pjTaskBaseline1Duration | 188744167 | |
pjTaskBaseline1DurationEstimated | 188744519 | |
pjTaskBaseline1DurationText | 188744984 | |
pjTaskBaseline1Finish | 188744163 | |
pjTaskBaseline1FinishText | 188744983 | |
pjTaskBaseline1FixedCostAccrual | 188744860 | |
pjTaskBaseline1Start | 188744162 | |
pjTaskBaseline1StartText | 188744982 | |
pjTaskBaseline1Work | 188744165 | |
pjTaskBaseline2BudgetCost | 188744871 | |
pjTaskBaseline2BudgetWork | 188744870 | |
pjTaskBaseline2Cost | 188744175 | |
pjTaskBaseline2DeliverableFinish | 188744869 | |
pjTaskBaseline2DeliverableStart | 188744868 | |
pjTaskBaseline2Duration | 188744178 | |
pjTaskBaseline2DurationEstimated | 188744520 | |
pjTaskBaseline2DurationText | 188744987 | |
pjTaskBaseline2Finish | 188744174 | |
pjTaskBaseline2FinishText | 188744986 | |
pjTaskBaseline2FixedCostAccrual | 188744867 | |
pjTaskBaseline2Start | 188744173 | |
pjTaskBaseline2StartText | 188744985 | |
pjTaskBaseline2Work | 188744176 | |
pjTaskBaseline3BudgetCost | 188744878 | |
pjTaskBaseline3BudgetWork | 188744877 | |
pjTaskBaseline3Cost | 188744186 | |
pjTaskBaseline3DeliverableFinish | 188744876 | |
pjTaskBaseline3DeliverableStart | 188744875 | |
pjTaskBaseline3Duration | 188744189 | |
pjTaskBaseline3DurationEstimated | 188744521 | |
pjTaskBaseline3DurationText | 188744990 | |
pjTaskBaseline3Finish | 188744185 | |
pjTaskBaseline3FinishText | 188744989 | |
pjTaskBaseline3FixedCostAccrual | 188744874 | |
pjTaskBaseline3Start | 188744184 | |
pjTaskBaseline3StartText | 188744988 | |
pjTaskBaseline3Work | 188744187 | |
pjTaskBaseline4BudgetCost | 188744885 | |
pjTaskBaseline4BudgetWork | 188744884 | |
pjTaskBaseline4Cost | 188744197 | |
pjTaskBaseline4DeliverableFinish | 188744883 | |
pjTaskBaseline4DeliverableStart | 188744882 | |
pjTaskBaseline4Duration | 188744200 | |
pjTaskBaseline4DurationEstimated | 188744522 | |
pjTaskBaseline4DurationText | 188744993 | |
pjTaskBaseline4Finish | 188744196 | |
pjTaskBaseline4FinishText | 188744992 | |
pjTaskBaseline4FixedCostAccrual | 188744881 | |
pjTaskBaseline4Start | 188744195 | |
pjTaskBaseline4StartText | 188744991 | |
pjTaskBaseline4Work | 188744198 | |
pjTaskBaseline5BudgetCost | 188744892 | |
pjTaskBaseline5BudgetWork | 188744891 | |
pjTaskBaseline5Cost | 188744208 | |
pjTaskBaseline5DeliverableFinish | 188744890 | |
pjTaskBaseline5DeliverableStart | 188744889 | |
pjTaskBaseline5Duration | 188744211 | |
pjTaskBaseline5DurationEstimated | 188744523 | |
pjTaskBaseline5DurationText | 188744996 | |
pjTaskBaseline5Finish | 188744207 | |
pjTaskBaseline5FinishText | 188744995 | |
pjTaskBaseline5FixedCostAccrual | 188744888 | |
pjTaskBaseline5Start | 188744206 | |
pjTaskBaseline5StartText | 188744994 | |
pjTaskBaseline5Work | 188744209 | |
pjTaskBaseline6BudgetCost | 188744899 | |
pjTaskBaseline6BudgetWork | 188744898 | |
pjTaskBaseline6Cost | 188744226 | |
pjTaskBaseline6DeliverableFinish | 188744897 | |
pjTaskBaseline6DeliverableStart | 188744896 | |
pjTaskBaseline6Duration | 188744229 | |
pjTaskBaseline6DurationEstimated | 188744524 | |
pjTaskBaseline6DurationText | 188744999 | |
pjTaskBaseline6Finish | 188744225 | |
pjTaskBaseline6FinishText | 188744998 | |
pjTaskBaseline6FixedCostAccrual | 188744895 | |
pjTaskBaseline6Start | 188744224 | |
pjTaskBaseline6StartText | 188744997 | |
pjTaskBaseline6Work | 188744227 | |
pjTaskBaseline7BudgetCost | 188744906 | |
pjTaskBaseline7BudgetWork | 188744905 | |
pjTaskBaseline7Cost | 188744237 | |
pjTaskBaseline7DeliverableFinish | 188744904 | |
pjTaskBaseline7DeliverableStart | 188744903 | |
pjTaskBaseline7Duration | 188744240 | |
pjTaskBaseline7DurationEstimated | 188744525 | |
pjTaskBaseline7DurationText | 188745002 | |
pjTaskBaseline7Finish | 188744236 | |
pjTaskBaseline7FinishText | 188745001 | |
pjTaskBaseline7FixedCostAccrual | 188744902 | |
pjTaskBaseline7Start | 188744235 | |
pjTaskBaseline7StartText | 188745000 | |
pjTaskBaseline7Work | 188744238 | |
pjTaskBaseline8BudgetCost | 188744913 | |
pjTaskBaseline8BudgetWork | 188744912 | |
pjTaskBaseline8Cost | 188744248 | |
pjTaskBaseline8DeliverableFinish | 188744911 | |
pjTaskBaseline8DeliverableStart | 188744910 | |
pjTaskBaseline8Duration | 188744251 | |
pjTaskBaseline8DurationEstimated | 188744526 | |
pjTaskBaseline8DurationText | 188745005 | |
pjTaskBaseline8Finish | 188744247 | |
pjTaskBaseline8FinishText | 188745004 | |
pjTaskBaseline8FixedCostAccrual | 188744909 | |
pjTaskBaseline8Start | 188744246 | |
pjTaskBaseline8StartText | 188745003 | |
pjTaskBaseline8Work | 188744249 | |
pjTaskBaseline9BudgetCost | 188744920 | |
pjTaskBaseline9BudgetWork | 188744919 | |
pjTaskBaseline9Cost | 188744259 | |
pjTaskBaseline9DeliverableFinish | 188744918 | |
pjTaskBaseline9DeliverableStart | 188744917 | |
pjTaskBaseline9Duration | 188744262 | |
pjTaskBaseline9DurationEstimated | 188744527 | |
pjTaskBaseline9DurationText | 188745008 | |
pjTaskBaseline9Finish | 188744258 | |
pjTaskBaseline9FinishText | 188745007 | |
pjTaskBaseline9FixedCostAccrual | 188744916 | |
pjTaskBaseline9Start | 188744257 | |
pjTaskBaseline9StartText | 188745006 | |
pjTaskBaseline9Work | 188744260 | |
pjTaskBaselineBudgetCost | 188744857 | |
pjTaskBaselineBudgetWork | 188744856 | |
pjTaskBaselineCost | 188743686 | |
pjTaskBaselineDeliverableFinish | 188744855 | |
pjTaskBaselineDeliverableStart | 188744854 | |
pjTaskBaselineDuration | 188743707 | |
pjTaskBaselineDurationEstimated | 188744093 | |
pjTaskBaselineDurationText | 188744981 | |
pjTaskBaselineFinish | 188743724 | |
pjTaskBaselineFinishText | 188744980 | |
pjTaskBaselineFixedCostAccrual | 188744853 | |
pjTaskBaselineStart | 188743723 | |
pjTaskBaselineStartText | 188744979 | |
pjTaskBaselineWork | 188743681 | |
pjTaskBCWP | 188743691 | |
pjTaskBCWS | 188743692 | |
pjTaskBudgetCost | 188744852 | |
pjTaskBudgetWork | 188744851 | |
pjTaskCalendar | 188744082 | |
pjTaskCalendarGuid | 188744824 | |
pjTaskConfirmed | 188743790 | |
pjTaskConstraintDate | 188743698 | |
pjTaskConstraintType | 188743697 | |
pjTaskContact | 188743792 | |
pjTaskCost | 188743685 | |
pjTaskCost1 | 188743786 | |
pjTaskCost10 | 188743944 | |
pjTaskCost2 | 188743787 | |
pjTaskCost3 | 188743788 | |
pjTaskCost4 | 188743938 | |
pjTaskCost5 | 188743939 | |
pjTaskCost6 | 188743940 | |
pjTaskCost7 | 188743941 | |
pjTaskCost8 | 188743942 | |
pjTaskCost9 | 188743943 | |
pjTaskCostRateTable | 188744048 | |
pjTaskCostVariance | 188743689 | |
pjTaskCPI | 188744217 | |
pjTaskCreated | 188743773 | |
pjTaskCritical | 188743699 | |
pjTaskCV | 188743763 | |
pjTaskCVPercent | 188744219 | |
pjTaskDate1 | 188743945 | |
pjTaskDate10 | 188743954 | |
pjTaskDate2 | 188743946 | |
pjTaskDate3 | 188743947 | |
pjTaskDate4 | 188743948 | |
pjTaskDate5 | 188743949 | |
pjTaskDate6 | 188743950 | |
pjTaskDate7 | 188743951 | |
pjTaskDate8 | 188743952 | |
pjTaskDate9 | 188743953 | |
pjTaskDeadline | 188744117 | |
pjTaskDelay | 188743700 | |
pjTaskDeliverableFinish | 188744833 | |
pjTaskDeliverableGuid | 188744826 | |
pjTaskDeliverableName | 188744956 | |
pjTaskDeliverableStart | 188744832 | |
pjTaskDeliverableType | 188744827 | |
pjTaskDemandedRequested | 188744800 | |
pjTaskDuration | 188743709 | |
pjTaskDuration1 | 188743783 | |
pjTaskDuration10 | 188743961 | |
pjTaskDuration10Estimated | 188744092 | |
pjTaskDuration1Estimated | 188744083 | |
pjTaskDuration2 | 188743784 | |
pjTaskDuration2Estimated | 188744084 | |
pjTaskDuration3 | 188743785 | |
pjTaskDuration3Estimated | 188744085 | |
pjTaskDuration4 | 188743955 | |
pjTaskDuration4Estimated | 188744086 | |
pjTaskDuration5 | 188743956 | |
pjTaskDuration5Estimated | 188744087 | |
pjTaskDuration6 | 188743957 | |
pjTaskDuration6Estimated | 188744088 | |
pjTaskDuration7 | 188743958 | |
pjTaskDuration7Estimated | 188744089 | |
pjTaskDuration8 | 188743959 | |
pjTaskDuration8Estimated | 188744090 | |
pjTaskDuration9 | 188743960 | |
pjTaskDuration9Estimated | 188744091 | |
pjTaskDurationText | 188744967 | |
pjTaskDurationVariance | 188743710 | |
pjTaskEAC | 188744221 | |
pjTaskEarlyFinish | 188743718 | |
pjTaskEarlyStart | 188743717 | |
pjTaskEarnedValueMethod | 188744802 | |
pjTaskEffortDriven | 188743812 | |
pjTaskEnterpriseCost1 | 188744279 | |
pjTaskEnterpriseCost10 | 188744288 | |
pjTaskEnterpriseCost2 | 188744280 | |
pjTaskEnterpriseCost3 | 188744281 | |
pjTaskEnterpriseCost4 | 188744282 | |
pjTaskEnterpriseCost5 | 188744283 | |
pjTaskEnterpriseCost6 | 188744284 | |
pjTaskEnterpriseCost7 | 188744285 | |
pjTaskEnterpriseCost8 | 188744286 | |
pjTaskEnterpriseCost9 | 188744287 | |
pjTaskEnterpriseDate1 | 188744289 | |
pjTaskEnterpriseDate10 | 188744298 | |
pjTaskEnterpriseDate11 | 188744299 | |
pjTaskEnterpriseDate12 | 188744300 | |
pjTaskEnterpriseDate13 | 188744301 | |
pjTaskEnterpriseDate14 | 188744302 | |
pjTaskEnterpriseDate15 | 188744303 | |
pjTaskEnterpriseDate16 | 188744304 | |
pjTaskEnterpriseDate17 | 188744305 | |
pjTaskEnterpriseDate18 | 188744306 | |
pjTaskEnterpriseDate19 | 188744307 | |
pjTaskEnterpriseDate2 | 188744290 | |
pjTaskEnterpriseDate20 | 188744308 | |
pjTaskEnterpriseDate21 | 188744309 | |
pjTaskEnterpriseDate22 | 188744310 | |
pjTaskEnterpriseDate23 | 188744311 | |
pjTaskEnterpriseDate24 | 188744312 | |
pjTaskEnterpriseDate25 | 188744313 | |
pjTaskEnterpriseDate26 | 188744314 | |
pjTaskEnterpriseDate27 | 188744315 | |
pjTaskEnterpriseDate28 | 188744316 | |
pjTaskEnterpriseDate29 | 188744317 | |
pjTaskEnterpriseDate3 | 188744291 | |
pjTaskEnterpriseDate30 | 188744318 | |
pjTaskEnterpriseDate4 | 188744292 | |
pjTaskEnterpriseDate5 | 188744293 | |
pjTaskEnterpriseDate6 | 188744294 | |
pjTaskEnterpriseDate7 | 188744295 | |
pjTaskEnterpriseDate8 | 188744296 | |
pjTaskEnterpriseDate9 | 188744297 | |
pjTaskEnterpriseDuration1 | 188744319 | |
pjTaskEnterpriseDuration10 | 188744328 | |
pjTaskEnterpriseDuration2 | 188744320 | |
pjTaskEnterpriseDuration3 | 188744321 | |
pjTaskEnterpriseDuration4 | 188744322 | |
pjTaskEnterpriseDuration5 | 188744323 | |
pjTaskEnterpriseDuration6 | 188744324 | |
pjTaskEnterpriseDuration7 | 188744325 | |
pjTaskEnterpriseDuration8 | 188744326 | |
pjTaskEnterpriseDuration9 | 188744327 | |
pjTaskEnterpriseFlag1 | 188744339 | |
pjTaskEnterpriseFlag10 | 188744348 | |
pjTaskEnterpriseFlag11 | 188744349 | |
pjTaskEnterpriseFlag12 | 188744350 | |
pjTaskEnterpriseFlag13 | 188744351 | |
pjTaskEnterpriseFlag14 | 188744352 | |
pjTaskEnterpriseFlag15 | 188744353 | |
pjTaskEnterpriseFlag16 | 188744354 | |
pjTaskEnterpriseFlag17 | 188744355 | |
pjTaskEnterpriseFlag18 | 188744356 | |
pjTaskEnterpriseFlag19 | 188744357 | |
pjTaskEnterpriseFlag2 | 188744340 | |
pjTaskEnterpriseFlag20 | 188744358 | |
pjTaskEnterpriseFlag3 | 188744341 | |
pjTaskEnterpriseFlag4 | 188744342 | |
pjTaskEnterpriseFlag5 | 188744343 | |
pjTaskEnterpriseFlag6 | 188744344 | |
pjTaskEnterpriseFlag7 | 188744345 | |
pjTaskEnterpriseFlag8 | 188744346 | |
pjTaskEnterpriseFlag9 | 188744347 | |
pjTaskEnterpriseNumber1 | 188744379 | |
pjTaskEnterpriseNumber10 | 188744388 | |
pjTaskEnterpriseNumber11 | 188744389 | |
pjTaskEnterpriseNumber12 | 188744390 | |
pjTaskEnterpriseNumber13 | 188744391 | |
pjTaskEnterpriseNumber14 | 188744392 | |
pjTaskEnterpriseNumber15 | 188744393 | |
pjTaskEnterpriseNumber16 | 188744394 | |
pjTaskEnterpriseNumber17 | 188744395 | |
pjTaskEnterpriseNumber18 | 188744396 | |
pjTaskEnterpriseNumber19 | 188744397 | |
pjTaskEnterpriseNumber2 | 188744380 | |
pjTaskEnterpriseNumber20 | 188744398 | |
pjTaskEnterpriseNumber21 | 188744399 | |
pjTaskEnterpriseNumber22 | 188744400 | |
pjTaskEnterpriseNumber23 | 188744401 | |
pjTaskEnterpriseNumber24 | 188744402 | |
pjTaskEnterpriseNumber25 | 188744403 | |
pjTaskEnterpriseNumber26 | 188744404 | |
pjTaskEnterpriseNumber27 | 188744405 | |
pjTaskEnterpriseNumber28 | 188744406 | |
pjTaskEnterpriseNumber29 | 188744407 | |
pjTaskEnterpriseNumber3 | 188744381 | |
pjTaskEnterpriseNumber30 | 188744408 | |
pjTaskEnterpriseNumber31 | 188744409 | |
pjTaskEnterpriseNumber32 | 188744410 | |
pjTaskEnterpriseNumber33 | 188744411 | |
pjTaskEnterpriseNumber34 | 188744412 | |
pjTaskEnterpriseNumber35 | 188744413 | |
pjTaskEnterpriseNumber36 | 188744414 | |
pjTaskEnterpriseNumber37 | 188744415 | |
pjTaskEnterpriseNumber38 | 188744416 | |
pjTaskEnterpriseNumber39 | 188744417 | |
pjTaskEnterpriseNumber4 | 188744382 | |
pjTaskEnterpriseNumber40 | 188744418 | |
pjTaskEnterpriseNumber5 | 188744383 | |
pjTaskEnterpriseNumber6 | 188744384 | |
pjTaskEnterpriseNumber7 | 188744385 | |
pjTaskEnterpriseNumber8 | 188744386 | |
pjTaskEnterpriseNumber9 | 188744387 | |
pjTaskEnterpriseOutlineCode1 | 188744419 | |
pjTaskEnterpriseOutlineCode10 | 188744437 | |
pjTaskEnterpriseOutlineCode11 | 188744439 | |
pjTaskEnterpriseOutlineCode12 | 188744441 | |
pjTaskEnterpriseOutlineCode13 | 188744443 | |
pjTaskEnterpriseOutlineCode14 | 188744445 | |
pjTaskEnterpriseOutlineCode15 | 188744447 | |
pjTaskEnterpriseOutlineCode16 | 188744449 | |
pjTaskEnterpriseOutlineCode17 | 188744451 | |
pjTaskEnterpriseOutlineCode18 | 188744453 | |
pjTaskEnterpriseOutlineCode19 | 188744455 | |
pjTaskEnterpriseOutlineCode2 | 188744421 | |
pjTaskEnterpriseOutlineCode20 | 188744457 | |
pjTaskEnterpriseOutlineCode21 | 188744459 | |
pjTaskEnterpriseOutlineCode22 | 188744461 | |
pjTaskEnterpriseOutlineCode23 | 188744463 | |
pjTaskEnterpriseOutlineCode24 | 188744465 | |
pjTaskEnterpriseOutlineCode25 | 188744467 | |
pjTaskEnterpriseOutlineCode26 | 188744469 | |
pjTaskEnterpriseOutlineCode27 | 188744471 | |
pjTaskEnterpriseOutlineCode28 | 188744473 | |
pjTaskEnterpriseOutlineCode29 | 188744475 | |
pjTaskEnterpriseOutlineCode3 | 188744423 | |
pjTaskEnterpriseOutlineCode30 | 188744477 | |
pjTaskEnterpriseOutlineCode4 | 188744425 | |
pjTaskEnterpriseOutlineCode5 | 188744427 | |
pjTaskEnterpriseOutlineCode6 | 188744429 | |
pjTaskEnterpriseOutlineCode7 | 188744431 | |
pjTaskEnterpriseOutlineCode8 | 188744433 | |
pjTaskEnterpriseOutlineCode9 | 188744435 | |
pjTaskEnterpriseProjectCost1 | 188744529 | |
pjTaskEnterpriseProjectCost10 | 188744538 | |
pjTaskEnterpriseProjectCost2 | 188744530 | |
pjTaskEnterpriseProjectCost3 | 188744531 | |
pjTaskEnterpriseProjectCost4 | 188744532 | |
pjTaskEnterpriseProjectCost5 | 188744533 | |
pjTaskEnterpriseProjectCost6 | 188744534 | |
pjTaskEnterpriseProjectCost7 | 188744535 | |
pjTaskEnterpriseProjectCost8 | 188744536 | |
pjTaskEnterpriseProjectCost9 | 188744537 | |
pjTaskEnterpriseProjectDate1 | 188744539 | |
pjTaskEnterpriseProjectDate10 | 188744548 | |
pjTaskEnterpriseProjectDate11 | 188744549 | |
pjTaskEnterpriseProjectDate12 | 188744550 | |
pjTaskEnterpriseProjectDate13 | 188744551 | |
pjTaskEnterpriseProjectDate14 | 188744552 | |
pjTaskEnterpriseProjectDate15 | 188744553 | |
pjTaskEnterpriseProjectDate16 | 188744554 | |
pjTaskEnterpriseProjectDate17 | 188744555 | |
pjTaskEnterpriseProjectDate18 | 188744556 | |
pjTaskEnterpriseProjectDate19 | 188744557 | |
pjTaskEnterpriseProjectDate2 | 188744540 | |
pjTaskEnterpriseProjectDate20 | 188744558 | |
pjTaskEnterpriseProjectDate21 | 188744559 | |
pjTaskEnterpriseProjectDate22 | 188744560 | |
pjTaskEnterpriseProjectDate23 | 188744561 | |
pjTaskEnterpriseProjectDate24 | 188744562 | |
pjTaskEnterpriseProjectDate25 | 188744563 | |
pjTaskEnterpriseProjectDate26 | 188744564 | |
pjTaskEnterpriseProjectDate27 | 188744565 | |
pjTaskEnterpriseProjectDate28 | 188744566 | |
pjTaskEnterpriseProjectDate29 | 188744567 | |
pjTaskEnterpriseProjectDate3 | 188744541 | |
pjTaskEnterpriseProjectDate30 | 188744568 | |
pjTaskEnterpriseProjectDate4 | 188744542 | |
pjTaskEnterpriseProjectDate5 | 188744543 | |
pjTaskEnterpriseProjectDate6 | 188744544 | |
pjTaskEnterpriseProjectDate7 | 188744545 | |
pjTaskEnterpriseProjectDate8 | 188744546 | |
pjTaskEnterpriseProjectDate9 | 188744547 | |
pjTaskEnterpriseProjectDuration1 | 188744569 | |
pjTaskEnterpriseProjectDuration10 | 188744578 | |
pjTaskEnterpriseProjectDuration2 | 188744570 | |
pjTaskEnterpriseProjectDuration3 | 188744571 | |
pjTaskEnterpriseProjectDuration4 | 188744572 | |
pjTaskEnterpriseProjectDuration5 | 188744573 | |
pjTaskEnterpriseProjectDuration6 | 188744574 | |
pjTaskEnterpriseProjectDuration7 | 188744575 | |
pjTaskEnterpriseProjectDuration8 | 188744576 | |
pjTaskEnterpriseProjectDuration9 | 188744577 | |
pjTaskEnterpriseProjectFlag1 | 188744649 | |
pjTaskEnterpriseProjectFlag10 | 188744658 | |
pjTaskEnterpriseProjectFlag11 | 188744659 | |
pjTaskEnterpriseProjectFlag12 | 188744660 | |
pjTaskEnterpriseProjectFlag13 | 188744661 | |
pjTaskEnterpriseProjectFlag14 | 188744662 | |
pjTaskEnterpriseProjectFlag15 | 188744663 | |
pjTaskEnterpriseProjectFlag16 | 188744664 | |
pjTaskEnterpriseProjectFlag17 | 188744665 | |
pjTaskEnterpriseProjectFlag18 | 188744666 | |
pjTaskEnterpriseProjectFlag19 | 188744667 | |
pjTaskEnterpriseProjectFlag2 | 188744650 | |
pjTaskEnterpriseProjectFlag20 | 188744668 | |
pjTaskEnterpriseProjectFlag3 | 188744651 | |
pjTaskEnterpriseProjectFlag4 | 188744652 | |
pjTaskEnterpriseProjectFlag5 | 188744653 | |
pjTaskEnterpriseProjectFlag6 | 188744654 | |
pjTaskEnterpriseProjectFlag7 | 188744655 | |
pjTaskEnterpriseProjectFlag8 | 188744656 | |
pjTaskEnterpriseProjectFlag9 | 188744657 | |
pjTaskEnterpriseProjectNumber1 | 188744689 | |
pjTaskEnterpriseProjectNumber10 | 188744698 | |
pjTaskEnterpriseProjectNumber11 | 188744699 | |
pjTaskEnterpriseProjectNumber12 | 188744700 | |
pjTaskEnterpriseProjectNumber13 | 188744701 | |
pjTaskEnterpriseProjectNumber14 | 188744702 | |
pjTaskEnterpriseProjectNumber15 | 188744703 | |
pjTaskEnterpriseProjectNumber16 | 188744704 | |
pjTaskEnterpriseProjectNumber17 | 188744705 | |
pjTaskEnterpriseProjectNumber18 | 188744706 | |
pjTaskEnterpriseProjectNumber19 | 188744707 | |
pjTaskEnterpriseProjectNumber2 | 188744690 | |
pjTaskEnterpriseProjectNumber20 | 188744708 | |
pjTaskEnterpriseProjectNumber21 | 188744709 | |
pjTaskEnterpriseProjectNumber22 | 188744710 | |
pjTaskEnterpriseProjectNumber23 | 188744711 | |
pjTaskEnterpriseProjectNumber24 | 188744712 | |
pjTaskEnterpriseProjectNumber25 | 188744713 | |
pjTaskEnterpriseProjectNumber26 | 188744714 | |
pjTaskEnterpriseProjectNumber27 | 188744715 | |
pjTaskEnterpriseProjectNumber28 | 188744716 | |
pjTaskEnterpriseProjectNumber29 | 188744717 | |
pjTaskEnterpriseProjectNumber3 | 188744691 | |
pjTaskEnterpriseProjectNumber30 | 188744718 | |
pjTaskEnterpriseProjectNumber31 | 188744719 | |
pjTaskEnterpriseProjectNumber32 | 188744720 | |
pjTaskEnterpriseProjectNumber33 | 188744721 | |
pjTaskEnterpriseProjectNumber34 | 188744722 | |
pjTaskEnterpriseProjectNumber35 | 188744723 | |
pjTaskEnterpriseProjectNumber36 | 188744724 | |
pjTaskEnterpriseProjectNumber37 | 188744725 | |
pjTaskEnterpriseProjectNumber38 | 188744726 | |
pjTaskEnterpriseProjectNumber39 | 188744727 | |
pjTaskEnterpriseProjectNumber4 | 188744692 | |
pjTaskEnterpriseProjectNumber40 | 188744728 | |
pjTaskEnterpriseProjectNumber5 | 188744693 | |
pjTaskEnterpriseProjectNumber6 | 188744694 | |
pjTaskEnterpriseProjectNumber7 | 188744695 | |
pjTaskEnterpriseProjectNumber8 | 188744696 | |
pjTaskEnterpriseProjectNumber9 | 188744697 | |
pjTaskEnterpriseProjectOutlineCode1 | 188744589 | |
pjTaskEnterpriseProjectOutlineCode10 | 188744598 | |
pjTaskEnterpriseProjectOutlineCode11 | 188744599 | |
pjTaskEnterpriseProjectOutlineCode12 | 188744600 | |
pjTaskEnterpriseProjectOutlineCode13 | 188744601 | |
pjTaskEnterpriseProjectOutlineCode14 | 188744602 | |
pjTaskEnterpriseProjectOutlineCode15 | 188744603 | |
pjTaskEnterpriseProjectOutlineCode16 | 188744604 | |
pjTaskEnterpriseProjectOutlineCode17 | 188744605 | |
pjTaskEnterpriseProjectOutlineCode18 | 188744606 | |
pjTaskEnterpriseProjectOutlineCode19 | 188744607 | |
pjTaskEnterpriseProjectOutlineCode2 | 188744590 | |
pjTaskEnterpriseProjectOutlineCode20 | 188744608 | |
pjTaskEnterpriseProjectOutlineCode21 | 188744609 | |
pjTaskEnterpriseProjectOutlineCode22 | 188744610 | |
pjTaskEnterpriseProjectOutlineCode23 | 188744611 | |
pjTaskEnterpriseProjectOutlineCode24 | 188744612 | |
pjTaskEnterpriseProjectOutlineCode25 | 188744613 | |
pjTaskEnterpriseProjectOutlineCode26 | 188744614 | |
pjTaskEnterpriseProjectOutlineCode27 | 188744615 | |
pjTaskEnterpriseProjectOutlineCode28 | 188744616 | |
pjTaskEnterpriseProjectOutlineCode29 | 188744617 | |
pjTaskEnterpriseProjectOutlineCode3 | 188744591 | |
pjTaskEnterpriseProjectOutlineCode30 | 188744618 | |
pjTaskEnterpriseProjectOutlineCode4 | 188744592 | |
pjTaskEnterpriseProjectOutlineCode5 | 188744593 | |
pjTaskEnterpriseProjectOutlineCode6 | 188744594 | |
pjTaskEnterpriseProjectOutlineCode7 | 188744595 | |
pjTaskEnterpriseProjectOutlineCode8 | 188744596 | |
pjTaskEnterpriseProjectOutlineCode9 | 188744597 | |
pjTaskEnterpriseProjectText1 | 188744729 | |
pjTaskEnterpriseProjectText10 | 188744738 | |
pjTaskEnterpriseProjectText11 | 188744739 | |
pjTaskEnterpriseProjectText12 | 188744740 | |
pjTaskEnterpriseProjectText13 | 188744741 | |
pjTaskEnterpriseProjectText14 | 188744742 | |
pjTaskEnterpriseProjectText15 | 188744743 | |
pjTaskEnterpriseProjectText16 | 188744744 | |
pjTaskEnterpriseProjectText17 | 188744745 | |
pjTaskEnterpriseProjectText18 | 188744746 | |
pjTaskEnterpriseProjectText19 | 188744747 | |
pjTaskEnterpriseProjectText2 | 188744730 | |
pjTaskEnterpriseProjectText20 | 188744748 | |
pjTaskEnterpriseProjectText21 | 188744749 | |
pjTaskEnterpriseProjectText22 | 188744750 | |
pjTaskEnterpriseProjectText23 | 188744751 | |
pjTaskEnterpriseProjectText24 | 188744752 | |
pjTaskEnterpriseProjectText25 | 188744753 | |
pjTaskEnterpriseProjectText26 | 188744754 | |
pjTaskEnterpriseProjectText27 | 188744755 | |
pjTaskEnterpriseProjectText28 | 188744756 | |
pjTaskEnterpriseProjectText29 | 188744757 | |
pjTaskEnterpriseProjectText3 | 188744731 | |
pjTaskEnterpriseProjectText30 | 188744758 | |
pjTaskEnterpriseProjectText31 | 188744759 | |
pjTaskEnterpriseProjectText32 | 188744760 | |
pjTaskEnterpriseProjectText33 | 188744761 | |
pjTaskEnterpriseProjectText34 | 188744762 | |
pjTaskEnterpriseProjectText35 | 188744763 | |
pjTaskEnterpriseProjectText36 | 188744764 | |
pjTaskEnterpriseProjectText37 | 188744765 | |
pjTaskEnterpriseProjectText38 | 188744766 | |
pjTaskEnterpriseProjectText39 | 188744767 | |
pjTaskEnterpriseProjectText4 | 188744732 | |
pjTaskEnterpriseProjectText40 | 188744768 | |
pjTaskEnterpriseProjectText5 | 188744733 | |
pjTaskEnterpriseProjectText6 | 188744734 | |
pjTaskEnterpriseProjectText7 | 188744735 | |
pjTaskEnterpriseProjectText8 | 188744736 | |
pjTaskEnterpriseProjectText9 | 188744737 | |
pjTaskEnterpriseText1 | 188744479 | |
pjTaskEnterpriseText10 | 188744488 | |
pjTaskEnterpriseText11 | 188744489 | |
pjTaskEnterpriseText12 | 188744490 | |
pjTaskEnterpriseText13 | 188744491 | |
pjTaskEnterpriseText14 | 188744492 | |
pjTaskEnterpriseText15 | 188744493 | |
pjTaskEnterpriseText16 | 188744494 | |
pjTaskEnterpriseText17 | 188744495 | |
pjTaskEnterpriseText18 | 188744496 | |
pjTaskEnterpriseText19 | 188744497 | |
pjTaskEnterpriseText2 | 188744480 | |
pjTaskEnterpriseText20 | 188744498 | |
pjTaskEnterpriseText21 | 188744499 | |
pjTaskEnterpriseText22 | 188744500 | |
pjTaskEnterpriseText23 | 188744501 | |
pjTaskEnterpriseText24 | 188744502 | |
pjTaskEnterpriseText25 | 188744503 | |
pjTaskEnterpriseText26 | 188744504 | |
pjTaskEnterpriseText27 | 188744505 | |
pjTaskEnterpriseText28 | 188744506 | |
pjTaskEnterpriseText29 | 188744507 | |
pjTaskEnterpriseText3 | 188744481 | |
pjTaskEnterpriseText30 | 188744508 | |
pjTaskEnterpriseText31 | 188744509 | |
pjTaskEnterpriseText32 | 188744510 | |
pjTaskEnterpriseText33 | 188744511 | |
pjTaskEnterpriseText34 | 188744512 | |
pjTaskEnterpriseText35 | 188744513 | |
pjTaskEnterpriseText36 | 188744514 | |
pjTaskEnterpriseText37 | 188744515 | |
pjTaskEnterpriseText38 | 188744516 | |
pjTaskEnterpriseText39 | 188744517 | |
pjTaskEnterpriseText4 | 188744482 | |
pjTaskEnterpriseText40 | 188744518 | |
pjTaskEnterpriseText5 | 188744483 | |
pjTaskEnterpriseText6 | 188744484 | |
pjTaskEnterpriseText7 | 188744485 | |
pjTaskEnterpriseText8 | 188744486 | |
pjTaskEnterpriseText9 | 188744487 | |
pjTaskErrorMessage | 188744847 | |
pjTaskEstimated | 188744076 | |
pjTaskExternalTask | 188743912 | |
pjTaskFinish | 188743716 | |
pjTaskFinish1 | 188743733 | |
pjTaskFinish10 | 188743971 | |
pjTaskFinish2 | 188743736 | |
pjTaskFinish3 | 188743739 | |
pjTaskFinish4 | 188743742 | |
pjTaskFinish5 | 188743745 | |
pjTaskFinish6 | 188743963 | |
pjTaskFinish7 | 188743965 | |
pjTaskFinish8 | 188743967 | |
pjTaskFinish9 | 188743969 | |
pjTaskFinishSlack | 188744119 | |
pjTaskFinishText | 188744966 | |
pjTaskFinishVariance | 188743726 | |
pjTaskFixedCost | 188743688 | |
pjTaskFixedCostAccrual | 188743880 | |
pjTaskFixedDuration | 188743714 | |
pjTaskFlag1 | 188743752 | |
pjTaskFlag10 | 188743761 | |
pjTaskFlag11 | 188743972 | |
pjTaskFlag12 | 188743973 | |
pjTaskFlag13 | 188743974 | |
pjTaskFlag14 | 188743975 | |
pjTaskFlag15 | 188743976 | |
pjTaskFlag16 | 188743977 | |
pjTaskFlag17 | 188743978 | |
pjTaskFlag18 | 188743979 | |
pjTaskFlag19 | 188743980 | |
pjTaskFlag2 | 188743753 | |
pjTaskFlag20 | 188743981 | |
pjTaskFlag3 | 188743754 | |
pjTaskFlag4 | 188743755 | |
pjTaskFlag5 | 188743756 | |
pjTaskFlag6 | 188743757 | |
pjTaskFlag7 | 188743758 | |
pjTaskFlag8 | 188743759 | |
pjTaskFlag9 | 188743760 | |
pjTaskFreeSlack | 188743701 | |
pjTaskGroupBySummary | 188744126 | |
pjTaskGuid | 188744823 | |
pjTaskHideBar | 188743789 | |
pjTaskHyperlink | 188743897 | |
pjTaskHyperlinkAddress | 188743898 | |
pjTaskHyperlinkHref | 188743900 | |
pjTaskHyperlinkScreenTip | 188744132 | |
pjTaskHyperlinkSubAddress | 188743899 | |
pjTaskID | 188743703 | |
pjTaskIgnoreResourceCalendar | 188744079 | |
pjTaskIgnoreWarnings | 188745012 | |
pjTaskIndex | 188744040 | |
pjTaskIndicators | 188743885 | |
pjTaskIsAssignment | 188743904 | |
pjTaskIsDurationValid | 188744977 | |
pjTaskIsFinishValid | 188744976 | |
pjTaskIsPublished | 188744845 | |
pjTaskIsStartValid | 188744975 | |
pjTaskLateFinish | 188743720 | |
pjTaskLateStart | 188743719 | |
pjTaskLevelAssignments | 188743933 | |
pjTaskLevelCanSplit | 188743932 | |
pjTaskLevelDelay | 188743700 | |
pjTaskLinkedFields | 188743778 | |
pjTaskManual | 188744960 | |
pjTaskMarked | 188743751 | |
pjTaskMilestone | 188743704 | |
pjTaskName | 188743694 | |
pjTaskNotes | 188743695 | |
pjTaskNumber1 | 188743767 | |
pjTaskNumber10 | 188743986 | |
pjTaskNumber11 | 188743987 | |
pjTaskNumber12 | 188743988 | |
pjTaskNumber13 | 188743989 | |
pjTaskNumber14 | 188743990 | |
pjTaskNumber15 | 188743991 | |
pjTaskNumber16 | 188743992 | |
pjTaskNumber17 | 188743993 | |
pjTaskNumber18 | 188743994 | |
pjTaskNumber19 | 188743995 | |
pjTaskNumber2 | 188743768 | |
pjTaskNumber20 | 188743996 | |
pjTaskNumber3 | 188743769 | |
pjTaskNumber4 | 188743770 | |
pjTaskNumber5 | 188743771 | |
pjTaskNumber6 | 188743982 | |
pjTaskNumber7 | 188743983 | |
pjTaskNumber8 | 188743984 | |
pjTaskNumber9 | 188743985 | |
pjTaskObjects | 188743777 | |
pjTaskOutlineCode1 | 188744096 | |
pjTaskOutlineCode10 | 188744114 | |
pjTaskOutlineCode2 | 188744098 | |
pjTaskOutlineCode3 | 188744100 | |
pjTaskOutlineCode4 | 188744102 | |
pjTaskOutlineCode5 | 188744104 | |
pjTaskOutlineCode6 | 188744106 | |
pjTaskOutlineCode7 | 188744108 | |
pjTaskOutlineCode8 | 188744110 | |
pjTaskOutlineCode9 | 188744112 | |
pjTaskOutlineLevel | 188743765 | |
pjTaskOutlineNumber | 188743782 | |
pjTaskOverallocated | 188743905 | |
pjTaskOvertimeCost | 188743848 | |
pjTaskOvertimeWork | 188743843 | |
pjTaskParentTask | 188743815 | |
pjTaskPathDrivenSuccessor | 188745063 | |
pjTaskPathDrivingPredecessor | 188745061 | |
pjTaskPathPredecessor | 188745062 | |
pjTaskPathSuccessor | 188745064 | |
pjTaskPercentComplete | 188743712 | |
pjTaskPercentWorkComplete | 188743713 | |
pjTaskPhysicalPercentComplete | 188744799 | |
pjTaskPlaceholder | 188744961 | |
pjTaskPredecessors | 188743727 | |
pjTaskPreleveledFinish | 188744050 | |
pjTaskPreleveledStart | 188744049 | |
pjTaskPriority | 188743705 | |
pjTaskProject | 188743764 | |
pjTaskRecalcFlags | 188744930 | |
pjTaskRecurring | 188743809 | |
pjTaskRegularWork | 188743846 | |
pjTaskRemainingCost | 188743690 | |
pjTaskRemainingDuration | 188743711 | |
pjTaskRemainingOvertimeCost | 188743850 | |
pjTaskRemainingOvertimeWork | 188743845 | |
pjTaskRemainingWork | 188743684 | |
pjTaskResourceEnterpriseMultiValueCode20 | 188744809 | |
pjTaskResourceEnterpriseMultiValueCode21 | 188744810 | |
pjTaskResourceEnterpriseMultiValueCode22 | 188744811 | |
pjTaskResourceEnterpriseMultiValueCode23 | 188744812 | |
pjTaskResourceEnterpriseMultiValueCode24 | 188744813 | |
pjTaskResourceEnterpriseMultiValueCode25 | 188744814 | |
pjTaskResourceEnterpriseMultiValueCode26 | 188744815 | |
pjTaskResourceEnterpriseMultiValueCode27 | 188744816 | |
pjTaskResourceEnterpriseMultiValueCode28 | 188744817 | |
pjTaskResourceEnterpriseMultiValueCode29 | 188744818 | |
pjTaskResourceEnterpriseOutlineCode1 | 188744769 | |
pjTaskResourceEnterpriseOutlineCode10 | 188744778 | |
pjTaskResourceEnterpriseOutlineCode11 | 188744779 | |
pjTaskResourceEnterpriseOutlineCode12 | 188744780 | |
pjTaskResourceEnterpriseOutlineCode13 | 188744781 | |
pjTaskResourceEnterpriseOutlineCode14 | 188744782 | |
pjTaskResourceEnterpriseOutlineCode15 | 188744783 | |
pjTaskResourceEnterpriseOutlineCode16 | 188744784 | |
pjTaskResourceEnterpriseOutlineCode17 | 188744785 | |
pjTaskResourceEnterpriseOutlineCode18 | 188744786 | |
pjTaskResourceEnterpriseOutlineCode19 | 188744787 | |
pjTaskResourceEnterpriseOutlineCode2 | 188744770 | |
pjTaskResourceEnterpriseOutlineCode20 | 188744788 | |
pjTaskResourceEnterpriseOutlineCode21 | 188744789 | |
pjTaskResourceEnterpriseOutlineCode22 | 188744790 | |
pjTaskResourceEnterpriseOutlineCode23 | 188744791 | |
pjTaskResourceEnterpriseOutlineCode24 | 188744792 | |
pjTaskResourceEnterpriseOutlineCode25 | 188744793 | |
pjTaskResourceEnterpriseOutlineCode26 | 188744794 | |
pjTaskResourceEnterpriseOutlineCode27 | 188744795 | |
pjTaskResourceEnterpriseOutlineCode28 | 188744796 | |
pjTaskResourceEnterpriseOutlineCode29 | 188744797 | |
pjTaskResourceEnterpriseOutlineCode3 | 188744771 | |
pjTaskResourceEnterpriseOutlineCode4 | 188744772 | |
pjTaskResourceEnterpriseOutlineCode5 | 188744773 | |
pjTaskResourceEnterpriseOutlineCode6 | 188744774 | |
pjTaskResourceEnterpriseOutlineCode7 | 188744775 | |
pjTaskResourceEnterpriseOutlineCode8 | 188744776 | |
pjTaskResourceEnterpriseOutlineCode9 | 188744777 | |
pjTaskResourceEnterpriseRBS | 188744798 | |
pjTaskResourceGroup | 188743793 | |
pjTaskResourceInitials | 188743730 | |
pjTaskResourceNames | 188743729 | |
pjTaskResourcePhonetics | 188744029 | |
pjTaskResourceType | 188744131 | |
pjTaskResponsePending | 188743930 | |
pjTaskResume | 188743779 | |
pjTaskResumeNoEarlierThan | 188743781 | |
pjTaskRollup | 188743762 | |
pjTaskScheduledDuration | 188745020 | |
pjTaskScheduledFinish | 188745019 | |
pjTaskScheduledStart | 188745018 | |
pjTaskSheetNotes | 188743774 | |
pjTaskSPI | 188744218 | |
pjTaskStart | 188743715 | |
pjTaskStart1 | 188743732 | |
pjTaskStart10 | 188743970 | |
pjTaskStart2 | 188743735 | |
pjTaskStart3 | 188743738 | |
pjTaskStart4 | 188743741 | |
pjTaskStart5 | 188743744 | |
pjTaskStart6 | 188743962 | |
pjTaskStart7 | 188743964 | |
pjTaskStart8 | 188743966 | |
pjTaskStart9 | 188743968 | |
pjTaskStartSlack | 188744118 | |
pjTaskStartText | 188744965 | |
pjTaskStartVariance | 188743725 | |
pjTaskStatus | 188744223 | |
pjTaskStatusIndicator | 188744801 | |
pjTaskStatusManagerName | 188744846 | |
pjTaskStop | 188743780 | |
pjTaskSubproject | 188743706 | |
pjTaskSubprojectReadOnly | 188743926 | |
pjTaskSuccessors | 188743728 | |
pjTaskSummary | 188743772 | |
pjTaskSV | 188743693 | |
pjTaskSVPercent | 188744220 | |
pjTaskTCPI | 188744222 | |
pjTaskTeamStatusPending | 188743931 | |
pjTaskText1 | 188743731 | |
pjTaskText10 | 188743750 | |
pjTaskText11 | 188743997 | |
pjTaskText12 | 188743998 | |
pjTaskText13 | 188743999 | |
pjTaskText14 | 188744000 | |
pjTaskText15 | 188744001 | |
pjTaskText16 | 188744002 | |
pjTaskText17 | 188744003 | |
pjTaskText18 | 188744004 | |
pjTaskText19 | 188744005 | |
pjTaskText2 | 188743734 | |
pjTaskText20 | 188744006 | |
pjTaskText21 | 188744007 | |
pjTaskText22 | 188744008 | |
pjTaskText23 | 188744009 | |
pjTaskText24 | 188744010 | |
pjTaskText25 | 188744011 | |
pjTaskText26 | 188744012 | |
pjTaskText27 | 188744013 | |
pjTaskText28 | 188744014 | |
pjTaskText29 | 188744015 | |
pjTaskText3 | 188743737 | |
pjTaskText30 | 188744016 | |
pjTaskText4 | 188743740 | |
pjTaskText5 | 188743743 | |
pjTaskText6 | 188743746 | |
pjTaskText7 | 188743747 | |
pjTaskText8 | 188743748 | |
pjTaskText9 | 188743749 | |
pjTaskTotalSlack | 188743702 | |
pjTaskType | 188743808 | |
pjTaskUniqueID | 188743766 | |
pjTaskUniquePredecessors | 188743775 | |
pjTaskUniqueSuccessors | 188743776 | |
pjTaskUpdateNeeded | 188743791 | |
pjTaskVAC | 188744121 | |
pjTaskWarning | 188744962 | |
pjTaskWBS | 188743696 | |
pjTaskWBSPredecessors | 188744129 | |
pjTaskWBSSuccessors | 188744130 | |
pjTaskWork | 188743680 | |
pjTaskWorkContour | 188743936 | |
pjTaskWorkVariance | 188743683 |