Window Interface
Definition
Important
Some information relates to prerelease product that may be substantially modified before it’s released. Microsoft makes no warranties, express or implied, with respect to the information provided here.
public interface class Window
[System.Runtime.InteropServices.Guid("00020B02-0000-0000-C000-000000000046")]
[System.Runtime.InteropServices.InterfaceType(2)]
public interface Window
type Window = interface
Public Interface Window
- Attributes
Properties
ActivePane | |
Application | |
BottomPane | |
Caption | |
Height | |
Index | |
Left | |
Parent | |
Top | |
TopPane | |
Visible | |
Width | |
WindowState |
Methods
Activate() | |
Close() | |
Refresh() | |
WebBrowserControlFrame(Object) | |
WebBrowserControlWindow() |
Applies to
Saran dan Komentar
https://aka.ms/ContentUserFeedback.
Segera hadir: Sepanjang tahun 2024 kami akan menghentikan penggunaan GitHub Issues sebagai mekanisme umpan balik untuk konten dan menggantinya dengan sistem umpan balik baru. Untuk mengetahui informasi selengkapnya, lihat:Kirim dan lihat umpan balik untuk