次の方法で共有


<Cost> Element

For a <Task>, <Cost> is the total scheduled (or projected) cost for a task, based on costs already incurred for work performed by all resources assigned to the task, in addition to the costs planned for the remaining work for the assignment.

For a <Resource>, it is the total scheduled cost for a resource for all assigned tasks, based on costs already incurred for work performed by the resource on all assigned tasks in addition to the costs planned for all remaining work.

For an <Assignment>, it is the total projected cost of the assignment when the baseline was saved.

For a <Baseline>, it is the total scheduled (or projected) cost for an assignment based on costs already incurred for work performed by the resource on a task, in addition to the costs planned for the remaining work for the assignment.

Element Properties

Property Value
Data Type Decimal
Minimum Occurrences 0
Maximum Occurrences 1
Default Value N/A
Abstract False
Nillable False
Element Constraints N/A

Parent Elements

Task
Resource
Assignment
Baseline

See Also

XML Schema for the <Task> Element
XML Structure for the <Task> Element

XML Schema for the <Resource> Element
XML Structure for the <Resource> Element

XML Schema for the <Assignment> Element
XML Structure for the <Assignment> Element

<Baseline> Element