Project Operations for stocked or production-based scenarios

Completed

Select the Project Operations for stocked or production-based scenario if you have already deployed and are using finance and operations apps, Microsoft Dynamics 365 Supply Chain Management, and manufacturing features.

The stocked or production-based scenario is used for architecture, engineering, consulting companies, and for project-based manufacturing.

With the stocked or production-based scenario for Project Operations, you get the following capabilities:

  • An extensive project management system that manages inventoried items and job or production order costing for internal and billable projects for schedules and financials.

  • A fully functional expense management system that includes policy enforcements and reimbursements for tracking project and non-project expenses.

  • An International Financial Reporting Standards (IFRS)-compliant project accounting and revenue recognition system.

The process to deploy Project Operations for a stocked or production-based scenario is as follows:

  1. Redeem software subscriptions

    • Project Operations (CRM): Required to manage customer relationships and project sales.
    • Office 365 Project Operations: Supports collaboration and productivity for project teams.
    • Assign licenses to users: Ensure that all relevant users are assigned the appropriate licenses to access and use Project Operations features.
  2. Post deployment actions

    • Establish a dual-write connection: Set up a connection between the finance and operations apps and Dataverse to enable synchronized data flow.
    • Update security settings: Configure the necessary security roles and permissions in the Project Operations environment to ensure proper access control.
    • Configure and run dual-write table maps: Map the tables between the connected systems to ensure data synchronization for entities such as customers, products, and operations.
    • Import configuration and demo data (optional): Load sample data or configuration templates to validate the deployment and test features in a controlled environment.
  3. Tips for Successful Deployment

    • Ensure all necessary licenses and subscriptions are active before starting the process.

    • Use Lifecycle Services (LCS) to monitor and manage the deployment steps.

    • Verify the dual-write configuration thoroughly to avoid data sync issues during production.