通过


ApplicationClass.PathSeparator 属性

定义

public:
 virtual property System::String ^ PathSeparator { System::String ^ get(); void set(System::String ^ value); };
public virtual string PathSeparator { get; set; }
member this.PathSeparator : string with get, set
Public Overridable Property PathSeparator As String

属性值

实现

适用于