StripLine.IntervalOffset Properti
Definisi
Penting
Beberapa informasi terkait produk prarilis yang dapat diubah secara signifikan sebelum dirilis. Microsoft tidak memberikan jaminan, tersirat maupun tersurat, sehubungan dengan informasi yang diberikan di sini.
Mendapatkan atau mengatur offset garis kisi, tanda centang, garis strip, dan label sumbu.
public:
property double IntervalOffset { double get(); void set(double value); };
[System.ComponentModel.Bindable(true)]
[System.ComponentModel.TypeConverter(typeof(System.Web.UI.DataVisualization.Charting.AxisLabelDateValueConverter))]
[System.Web.UI.PersistenceMode(System.Web.UI.PersistenceMode.Attribute)]
public double IntervalOffset { get; set; }
[<System.ComponentModel.Bindable(true)>]
[<System.ComponentModel.TypeConverter(typeof(System.Web.UI.DataVisualization.Charting.AxisLabelDateValueConverter))>]
[<System.Web.UI.PersistenceMode(System.Web.UI.PersistenceMode.Attribute)>]
member this.IntervalOffset : double with get, set
Public Property IntervalOffset As Double
Nilai Properti
double Nilai yang mewakili offset interval.
- Atribut
Contoh
Contoh kode berikut menunjukkan tiga aplikasi garis strip. Pertama, garis strip horizontal ditambahkan pada interval berulang. Kedua, garis garis vertikal ditambahkan untuk menyoroti titik data akhir pekan. Terakhir, garis strip yang tidak berulang ditambahkan untuk menunjukkan rata-rata titik data dalam seri pertama bagan.
Imports System.Web.UI.DataVisualization.Charting
Public Partial Class StripLines
Inherits System.Web.UI.Page
Protected Sub Page_Load(ByVal sender As Object, ByVal e As EventArgs)
' Add chart data before adding strip lines.
AddChartData()
' Adds repeating horizontal strip lines.
AddHorizRepeatingStripLines()
' Highlights weekend points using strip lines.
HighlightWeekendsWithStripLines()
' Adds a threshold line using strip lines.
AddThresholdStripLine()
End Sub
''' <summary>
''' Adds a week of data with values between 20 and 35.
''' </summary>
Private Sub AddChartData()
' Declare new random variable
Dim rand As New Random()
For i As Integer = 0 To 6
' Add a week of data
chart1.Series(0).Points.AddXY(DateTime.Now.AddDays(i), rand.[Next](20, 35))
Next
End Sub
''' <summary>
''' Adds repeating horizontal strip lines at intervals of 5.
''' </summary>
Private Sub AddHorizRepeatingStripLines()
' Instantiate new strip line
Dim stripLine1 As New StripLine()
stripLine1.StripWidth = 2.5
stripLine1.Interval = 5
' Consider adding transparency so that the strip lines are lighter
stripLine1.BackColor = Color.FromArgb(120, Color.Red)
' Add the strip line to the chart
chart1.ChartAreas(0).AxisY.StripLines.Add(stripLine1)
End Sub
''' <summary>
''' Adds strip lines to highlight weekend values.
''' </summary>
Private Sub HighlightWeekendsWithStripLines()
' Set strip line to highlight weekends
Dim stripLine2 As New StripLine()
stripLine2.BackColor = Color.FromArgb(120, Color.Gold)
stripLine2.IntervalOffset = -1.5
stripLine2.IntervalOffsetType = DateTimeIntervalType.Days
stripLine2.Interval = 1
stripLine2.IntervalType = DateTimeIntervalType.Weeks
stripLine2.StripWidth = 2
stripLine2.StripWidthType = DateTimeIntervalType.Days
' Add strip line to the chart
chart1.ChartAreas(0).AxisX.StripLines.Add(stripLine2)
' Set the axis label to show the name of the day
' This is done in order to demonstrate that weekends are highlighted
chart1.ChartAreas(0).AxisX.LabelStyle.Format = "ddd"
End Sub
''' <summary>
''' Adds a horizontal threshold strip line at the calculated mean
''' value of all data points in the first series of the chart.
''' </summary>
Private Sub AddThresholdStripLine()
Dim stripLine3 As New StripLine()
' Set threshold line so that it is only shown once
stripLine3.Interval = 0
' Set the threshold line to be drawn at the calculated mean of the first series
stripLine3.IntervalOffset = chart1.DataManipulator.Statistics.Mean(chart1.Series(0).Name)
stripLine3.BackColor = Color.DarkGreen
stripLine3.StripWidth = 0.25
' Set text properties for the threshold line
stripLine3.Text = "Mean"
stripLine3.ForeColor = Color.Black
' Add strip line to the chart
chart1.ChartAreas(0).AxisY.StripLines.Add(stripLine3)
End Sub
End Class
public partial class StripLines : System.Web.UI.Page
{
protected void Page_Load(object sender, EventArgs e)
{
// Add chart data
AddChartData();
// Adds repeating horizontal strip lines.
AddHorizRepeatingStripLines();
// Highlights weekend points using strip lines.
HighlightWeekendsWithStripLines();
// Adds a threshold line using strip lines.
AddThresholdStripLine();
}
/// <summary>
/// Adds a week of data with values between 20 and 35.
/// </summary>
private void AddChartData()
{
// Declare new random variable
Random rand = new Random();
// Add a week of data
for (int i = 0; i < 7; i++)
{
chart1.Series[0].Points.AddXY(DateTime.Now.AddDays(i), rand.Next(20,35));
}
}
/// <summary>
/// Adds repeating horizontal strip lines at intervals of 5.
/// </summary>
private void AddHorizRepeatingStripLines()
{
// Instantiate new strip line
StripLine stripLine1 = new StripLine();
stripLine1.StripWidth = 0;
stripLine1.BorderColor = Color.Black;
stripLine1.BorderWidth = 3;
stripLine1.Interval = 5;
// Consider adding transparency so that the strip lines are lighter
stripLine1.BackColor = Color.FromArgb(120, Color.Red);
stripLine1.BackSecondaryColor = Color.Black;
stripLine1.BackGradientStyle = GradientStyle.LeftRight;
// Add the strip line to the chart
chart1.ChartAreas[0].AxisY.StripLines.Add(stripLine1);
}
/// <summary>
/// Adds strip lines to highlight weekend values.
/// </summary>
private void HighlightWeekendsWithStripLines()
{
// Set strip line to highlight weekends
StripLine stripLine2 = new StripLine();
stripLine2.BackColor = Color.FromArgb(120, Color.Gold);
stripLine2.IntervalOffset = -1.5;
stripLine2.IntervalOffsetType = DateTimeIntervalType.Days;
stripLine2.Interval = 1;
stripLine2.IntervalType = DateTimeIntervalType.Weeks;
stripLine2.StripWidth = 2;
stripLine2.StripWidthType = DateTimeIntervalType.Days;
// Add strip line to the chart
chart1.ChartAreas[0].AxisX.StripLines.Add(stripLine2);
// Set the axis label to show the name of the day
// This is done in order to demonstrate that weekends are highlighted
chart1.ChartAreas[0].AxisX.LabelStyle.Format = "ddd";
}
/// <summary>
/// Adds a horizontal threshold strip line at the calculated mean
/// value of all data points in the first series of the chart.
/// </summary>
private void AddThresholdStripLine()
{
StripLine stripLine3 = new StripLine();
// Set threshold line so that it is only shown once
stripLine3.Interval = 0;
// Set the threshold line to be drawn at the calculated mean of the first series
stripLine3.IntervalOffset = chart1.DataManipulator.Statistics.Mean(chart1.Series[0].Name);
stripLine3.BackColor = Color.DarkGreen;
stripLine3.StripWidth = 0.25;
// Set text properties for the threshold line
stripLine3.Text = "Mean";
stripLine3.ForeColor = Color.Black;
// Add strip line to the chart
chart1.ChartAreas[0].AxisY.StripLines.Add(stripLine3);
}
}
Keterangan
Offset interval tanda centang kecil dan garis kisi tidak pernah dipengaruhi oleh nilai IntervalOffset properti Axis objek.
IntervalOffset Pengaturan properti menentukan unit pengukuran offset.
bisa Interval menjadi nilai negatif.
Nilai defaultnya adalah Auto (0).