JapaneseCalendar.GetEra(DateTime) Metode

Definisi

Mengembalikan era dalam yang ditentukan DateTime.

public:
 override int GetEra(DateTime time);
public override int GetEra (DateTime time);
override this.GetEra : DateTime -> int
Public Overrides Function GetEra (time As DateTime) As Integer

Parameter

time
DateTime

yang DateTime akan dibaca.

Mengembalikan

Bilangan bulat yang mewakili era dalam .DateTime

Pengecualian

DateTime Hasilnya berada di luar rentang yang didukung.

Contoh

Contoh berikut menampilkan nilai beberapa komponen dari dalam DateTime hal kalender Jepang.

using namespace System;
using namespace System::Globalization;
void DisplayValues( Calendar^ myCal, DateTime myDT )
{
   Console::WriteLine( "   Era:        {0}", myCal->GetEra( myDT ) );
   Console::WriteLine( "   Year:       {0}", myCal->GetYear( myDT ) );
   Console::WriteLine( "   Month:      {0}", myCal->GetMonth( myDT ) );
   Console::WriteLine( "   DayOfYear:  {0}", myCal->GetDayOfYear( myDT ) );
   Console::WriteLine( "   DayOfMonth: {0}", myCal->GetDayOfMonth( myDT ) );
   Console::WriteLine( "   DayOfWeek:  {0}", myCal->GetDayOfWeek( myDT ) );
   Console::WriteLine();
}

int main()
{
   
   // Sets a DateTime to April 3, 2002 of the Gregorian calendar.
   DateTime myDT = DateTime(2002,4,3,gcnew GregorianCalendar);
   
   // Creates an instance of the JapaneseCalendar.
   JapaneseCalendar^ myCal = gcnew JapaneseCalendar;
   
   // Displays the values of the DateTime.
   Console::WriteLine( "April 3, 2002 of the Gregorian calendar equals the following in the Japanese calendar:" );
   DisplayValues( myCal, myDT );
   
   // Adds two years and ten months.
   myDT = myCal->AddYears( myDT, 2 );
   myDT = myCal->AddMonths( myDT, 10 );
   
   // Displays the values of the DateTime.
   Console::WriteLine( "After adding two years and ten months:" );
   DisplayValues( myCal, myDT );
}

/*
This code produces the following output.

April 3, 2002 of the Gregorian calendar equals the following in the Japanese calendar:
   Era:        4
   Year:       14
   Month:      4
   DayOfYear:  93
   DayOfMonth: 3
   DayOfWeek:  Wednesday

After adding two years and ten months:
   Era:        4
   Year:       17
   Month:      2
   DayOfYear:  34
   DayOfMonth: 3
   DayOfWeek:  Thursday

*/
using System;
using System.Globalization;

public class SamplesJapaneseCalendar  {

   public static void Main()  {

      // Sets a DateTime to April 3, 2002 of the Gregorian calendar.
      DateTime myDT = new DateTime( 2002, 4, 3, new GregorianCalendar() );

      // Creates an instance of the JapaneseCalendar.
      JapaneseCalendar myCal = new JapaneseCalendar();

      // Displays the values of the DateTime.
      Console.WriteLine( "April 3, 2002 of the Gregorian calendar equals the following in the Japanese calendar:" );
      DisplayValues( myCal, myDT );

      // Adds two years and ten months.
      myDT = myCal.AddYears( myDT, 2 );
      myDT = myCal.AddMonths( myDT, 10 );

      // Displays the values of the DateTime.
      Console.WriteLine( "After adding two years and ten months:" );
      DisplayValues( myCal, myDT );
   }

   public static void DisplayValues( Calendar myCal, DateTime myDT )  {
      Console.WriteLine( "   Era:        {0}", myCal.GetEra( myDT ) );
      Console.WriteLine( "   Year:       {0}", myCal.GetYear( myDT ) );
      Console.WriteLine( "   Month:      {0}", myCal.GetMonth( myDT ) );
      Console.WriteLine( "   DayOfYear:  {0}", myCal.GetDayOfYear( myDT ) );
      Console.WriteLine( "   DayOfMonth: {0}", myCal.GetDayOfMonth( myDT ) );
      Console.WriteLine( "   DayOfWeek:  {0}", myCal.GetDayOfWeek( myDT ) );
      Console.WriteLine();
   }
}

/*
This code produces the following output.

April 3, 2002 of the Gregorian calendar equals the following in the Japanese calendar:
   Era:        4
   Year:       14
   Month:      4
   DayOfYear:  93
   DayOfMonth: 3
   DayOfWeek:  Wednesday

After adding two years and ten months:
   Era:        4
   Year:       17
   Month:      2
   DayOfYear:  34
   DayOfMonth: 3
   DayOfWeek:  Thursday

*/
Imports System.Globalization


Public Class SamplesJapaneseCalendar   

   Public Shared Sub Main()

      ' Sets a DateTime to April 3, 2002 of the Gregorian calendar.
      Dim myDT As New DateTime(2002, 4, 3, New GregorianCalendar())

      ' Creates an instance of the JapaneseCalendar.
      Dim myCal As New JapaneseCalendar()

      ' Displays the values of the DateTime.
      Console.WriteLine("April 3, 2002 of the Gregorian calendar equals the following in the Japanese calendar:")
      DisplayValues(myCal, myDT)

      ' Adds two years and ten months.
      myDT = myCal.AddYears(myDT, 2)
      myDT = myCal.AddMonths(myDT, 10)

      ' Displays the values of the DateTime.
      Console.WriteLine("After adding two years and ten months:")
      DisplayValues(myCal, myDT)

   End Sub

   Public Shared Sub DisplayValues(myCal As Calendar, myDT As DateTime)
      Console.WriteLine("   Era:        {0}", myCal.GetEra(myDT))
      Console.WriteLine("   Year:       {0}", myCal.GetYear(myDT))
      Console.WriteLine("   Month:      {0}", myCal.GetMonth(myDT))
      Console.WriteLine("   DayOfYear:  {0}", myCal.GetDayOfYear(myDT))
      Console.WriteLine("   DayOfMonth: {0}", myCal.GetDayOfMonth(myDT))
      Console.WriteLine("   DayOfWeek:  {0}", myCal.GetDayOfWeek(myDT))
      Console.WriteLine()
   End Sub

End Class


'This code produces the following output.
'
'April 3, 2002 of the Gregorian calendar equals the following in the Japanese calendar:
'   Era:        4
'   Year:       14
'   Month:      4
'   DayOfYear:  93
'   DayOfMonth: 3
'   DayOfWeek:  Wednesday
'
'After adding two years and ten months:
'   Era:        4
'   Year:       17
'   Month:      2
'   DayOfYear:  34
'   DayOfMonth: 3
'   DayOfWeek:  Thursday

Keterangan

Kalender Jepang mengenali satu era untuk setiap pemerintahan kaisar. Dua era terbaru adalah era Heisei, dimulai pada tahun kalender Gregorian 1989, dan era Reiwa, dimulai pada tahun kalender Gregorian 2019. Nama era biasanya ditampilkan sebelum tahun. Misalnya, kalender Gregorian tahun 2001 adalah tahun kalender Jepang Heisei 13. Perhatikan bahwa tahun pertama era disebut "Gannen." Oleh karena itu, kalender Gregorian tahun 1989 adalah tahun kalender Jepang Heisei Gannen.

Penting

Era di kalender Jepang didasarkan pada pemerintahan kaisar dan karenanya diharapkan berubah. Misalnya, 1 Mei 2019 menandai awal era Reiwa di JapaneseCalendar dan JapaneseLunisolarCalendar. Perubahan era seperti itu mempengaruhi semua aplikasi yang menggunakan kalender ini. Untuk informasi selengkapnya dan untuk menentukan apakah aplikasi Anda terpengaruh, lihat Menangani era baru di kalender Jepang di .NET. Untuk informasi tentang menguji aplikasi Anda pada sistem Windows untuk memastikan kesiapannya untuk perubahan era, lihat Menyiapkan aplikasi Anda untuk perubahan era Jepang. Untuk fitur di .NET yang mendukung kalender dengan beberapa era dan untuk praktik terbaik saat bekerja dengan kalender yang mendukung beberapa era, lihat Bekerja dengan era.

Kelas ini menetapkan angka ke era sebagai berikut:

Nilai GetEra Nama Era Singkatan Era Tanggal Gregorian
5 令和 (Reiwa) 令和 (R, r) 1 Mei 2019 hingga sekarang
4 平成 (Heisei) 平 (H, h) 8 Januari 1989 hingga 30 April 2019
3 昭和 (Showa) 昭 (S, s) 25 Desember 1926 hingga 7 Januari 1989
2 大正 (Taisho) 大 (T, t) 30 Juli 1912 hingga 24 Desember 1926
1 明治 (Meiji) 明 (M, m) 8 September 1868 hingga 29 Juli 1912

Biasanya, kelas ini JapaneseCalendar mendukung tanggal dari 8 September dalam tahun Meiji 1 (8 September 1868 dari kalender Gregorian), yang merupakan nilai MinSupportedDateTime properti. Namun, GetEra metode ini berhasil mengembalikan era untuk tanggal dari 1 Januari hingga 7 September dalam tahun Meiji 1 (1 Januari 1868 hingga 7 September 1868 di kalender Gregorian). Untuk tanggal yang lebih awal dari 1 Januari 1868 di kalender Gregorian, metode ini memberikan ArgumentOutOfRangeException pengecualian.

Berlaku untuk

Lihat juga