Visual Studio debugger will not step into code of a separate project that builds to a dll (within the same solution)
I have two projects in one solution. One compiles into an exe which depends on the other project that compiles into a dll. When I try to step into a function from the dll that is called within the exe code, it skips over it. My pdb file for the dll is…
401 Unauthorized Error with Azure Maps in Route-Finding App Tutorial
I'm currently working through the Azure Maps tutorial on creating a route-finding app (https://learn.microsoft.com/en-us/training/modules/create-your-first-app-with-azure-maps/4-exercise-create-your-route-finding-app), and I've run into a problem. I am…
i'm a student and i need azure only for learning porpose?
and practice is there is any platfrom in azure portail for this soemthing like virtual learning azure portail ?
image not loading in modal popup imageurl in asp.net c#
i am trying to load image in image button through modal popup. The problem is modal popup is showing, but image not loading which means it is blank window. i am storing all the images in different server and application hosted in another server. what is…
How does session window max duration check work in Stream Analytics ?
Hi, I have a question regarding the Session Window function in Stream Analytics. According to documentation I found, "If events keep occurring within the specified timeout, the session window will keep extending until maximum duration is reached.…
Graph API - Upload File to ListItem
Hello, I know how to use the Graph API to upload small files (<4MB) to Drive Folders and to Document Libraries. However, I can not figure out how to Upload Files to existing ListItems. Is that possible with the Graph API? Many Thanks, Shadi
Create a New Item in a List with Attachment
Hello, I'm using Microsoft SharePoint Online and using the Microsoft Graph RestAPI v1.0 API. When creating a list item, there is an "Add Attachment" field. Is it possible to add attachments to list items using the Microsoft…
Table Transformation DCR
source | extend LocalTime = datetime_utc_to_local(TimeGenerated, 'Europe/Amsterdam') Error occurred while compiling query in query: SemanticError:0x00000009 at 2:23 : Runtime scalar function provider not found for function: datetime_utc_to_local If…
API for gpt-4-1106-preview extremely slow
When we do API calls for the gpt-4-1106-preview model, the average response time is around 60 seconds. When we use the chat GUI in the Azure AI studio on the same model, with the same parameters, the response takes 10 - 20 seconds? What can we do to…
How to fix permissions for sharing on a Windows 10 PC from a Windows 11 laptop
Having recently bought a Lenovo Windows 11 laptop, to replace my HP 10 laptop, I am having great difficulty achieving the same Private network sharing with my HP Windows 10 PC that I enjoyed previosly on the two Win 10 machines. When I try networking…
How can I set the Notification receiving IP address to a fixed IP address?
our environment is limited network environment, mobile WIFI also has to be connected to company network without internet connection, but we can allow connection using firewall configuration allowing ip address and port, but we did not allow range of ip…
Disabling Hyper-V in Windows 11 Home
We know that Hyper-V is disabled in Windows 11 HOME Version but a running of System Information shows that it is installed (although not accessible). When attempting to RE-connect to a Miracast device, it bombs out because it conflicts with the…
How to Avoid any user to close a process in the task manager.
Hello, I would like to know if there is any way that users are not able to terminate the ADGuard program process in the Task Manager. I have users who close them to enter restricted pages.
Switching from SQL Server/CAL based licensing to core based licensing model for all SQL servers
We are using Server+CAL licensing model for all SQL servers in our organization. Due to the limitation of number of cores supported by CAL based license, we are planning to switch to core based license. Upon checking with client, he informed, "Under…
Need to create new versioning of my all apis which was created before 2021-08-01 ?
As mentioned above Title, and news of "All API versions prior to 2021-08-01 will be retired starting 1 June 2024. These API versions will be disabled gradually and without further notice." then I need to create new api versioning of my all…
can not start sql server2012.the request failed or ther service did not respond in a timely fashion.
This error will be reported after starting sql server 2012, check the log,Please refer to the following picture to view the log. How to solve it? The description for Event ID 17836 from source MSSQL$MSSQL2012 cannot be found. Either the component that…
How to give external customer accounts in a entra external id tenant access to a a web api in my internal tenant?
I have an internal tenant A where I have internal resources (web api, functions, database, admin website etc). Recently I created an external tenant B with Microsoft Entra External id for customers. There I have registered a SPA app where external…
PL 300 Reschedule and technical issue
I scheduled my exam for today, arrived on time, and completed the system check-in process. However, when the proctor was assigned to me, she was unable to hear me. I attempted a few times, but each time I saw a pop-up that said, "reschedule your…
event though azresource graph module installed giving error search-azgraph is not recognized
event though azresource graph module installed giving error search-azgraph is not recognized, I have used below commands but still did not work Get-Module -Name PowerShellGet Install-Module -Name Az.ResourceGraph -Repository PSGallery -Scope CurrentUser